09/038 13-LZU 108 7642 Uae, Rev C © Ericsson AB 2010 1 RBS 6102/6101 & BBS/BBU/GBF 6102/6101 Installation 2010-08-06
Course Agenda
 Introduction
 RAN System Description and RBS 6000 Survey
 RBS 6102/6101 Technical Data
 BBS/BBU/GBF 6102/6101 Technical Data
 Installation Safety Precautions and Tools
 Site Installation Preparation
 RBS 6102/6101 Installation
 BBS/BBU/GBF 6102/6101 Installation
 Concluding Routines
 Practical Exercises
 Theoretical Assessment and Course Summary

09/038 13-LZU 108 7642 Uae, Rev C © Ericsson AB 2010 2 RBS 6102/6101 & BBS/BBU/GBF 6102/6101 Installation 2010-08-06
Concluding Routines
Before you leave the site, make sure that the following
actions has been performed:

• The site is clear of objects such as wrapping material


and pieces of cables.

• Note that all packing material can be recycled. Send the


packing materials back to the factory as described on
the lid. Dispose of the shock absorbers in accordance
with local regulations, or return them to the factory with
the other packaging materials.

09/038 13-LZU 108 7642 Uae, Rev C © Ericsson AB 2010 3 RBS 6102/6101 & BBS/BBU/GBF 6102/6101 Installation 2010-08-06
Concluding Routines
• The checklist has been completed. The checklist can be
found in the Radio Site Installation Documents.

• The Radio Site Installation Documents are updated. (red


marking)

• The modified Radio Site Installation Documents have


been handed over to the person responsible for the
site.

• The climate unit is running.

09/038 13-LZU 108 7642 Uae, Rev C © Ericsson AB 2010 4 RBS 6102/6101 & BBS/BBU/GBF 6102/6101 Installation 2010-08-06
09/038 13-LZU 108 7642 Uae, Rev C © Ericsson AB 2010 5 RBS 6102/6101 & BBS/BBU/GBF 6102/6101 Installation 2010-08-06