You are on page 1of 2
‘Commissioning instruction | _ Instruction No Commissioning test Electric equipment chapter| Cable check a7 4.3 Cable tightening confirmation Confirm that the tightening check of each joint of the main circuit cable is done, The connection and tightening of bus bar between panels is confirmed one by one. 4.4 EB(Earth bus) line and CB(Common bus) line confirmation Itis necessary to separate the EB line and the CB line. There needs to be a continuity through only the earth pole. In the examination, cable in the earth pole of one side is removed and confirm that continuity between each earth is nothing The route of the cable, cable size and the shield processing, etc. are often confirmed by outside wiring check sheet Other control panels, CB pole(below 100) }-—c8 branch line EB branch Vine EB trunk line EB pole(below 1000) 4.4.1 Check method a1) CB trunk line is removed from CB pole. a2) The resistance between the EB and the CB line with analog tester(Q range). rr cB — a EB a 23) If there is no contamination (EB and CB is connected by mistake), resistance shows ©. In this case, the following confirmation is done because it is normal. “anaiag ‘Commissioning instruction | _ Instruction No Commissioning test Electric equipment chapter| Cable check a7 EB and CB inside each panel are connected by temporary jumper, the Short and Open between EB and CB are confirmed with analog tester. So it can be confirmed that the branch line is connected with each trunk line, a4) When resistance does not become 000, the investigation measures are necessary. a4.1)CB branch lines are separated with all panel which is connected with CB branch line. a4.2)The Open between CB-EB inside each panel is confirmed a4.3)When the short-circuit is found inside of the panel, it investigates according to the following procedures 4.3.1) The shielding wire of the LT circuit (PLG and PLC line, ete.) is removed one by one and is connected with an analog tester. a4,3.2) When an analog tester becomes o00,,the other side of corresponding cable is investigated again. a4.3.3)Each panel is similarly investigated one by one. [converter] | inverte | _ Omer gou <—— The CB branch line is removed. ‘a4.3.4)When everything becomes normal in each panel, t he removed CB branch line is returned as before, it measures between EB-CB again with an analog tester, and the Open between EB and CB line is confirmed. a5) When jumper wire is connected between EB-CB in each panel, confirm that an analog tester becomes 00. 3XDo the resistance confirmation in the panel between EB-CB every day. Confirm whether EB and CB are wiring bundled from the cable duct to the control panel (The cable hole in the control panel is divided depending on the voltage level. ) When itis wiring bundled, the cable is changed with route and separate as much as possible. (The noise appears to EB—-CB when EB and CB are wiring bundled. ) “anaiag

You might also like