You are on page 1of 312
Nature of Sollis, Sandy Soll/ Sandy Laom/ arid Areas, C= 0249(RXF)* 0.2 R= 300,00 mm F on C= 0209x(RxF) 98 ‘8511 Calculation of Intensity of Rainfall (1) teh Ratio : 0.1050 From Fig. 4 of RBF -16 ‘th Rato= = 034 From Fig. 4 of RF 16 CooficentK == teh Ratio That Z 0.1650. Ey Ep 0.4853 R80 (24) : 90000 mm R50 (1) = REO @24)x 1 hto 24h Rainfall Rati, : 300x034 = 102.00 mm R50 (0) = KxRSO() - 0.4863 x102.00 : 49.5018 min Int fain () = a 72.1714 mar. Design Flood Discharge = as = 02TexCxxA : xozre xasstt = x172:1718 0.0398, 5 116213 cumisoe [BR NO- 68 IR KM 25.405 (Khurje-HafizPur) 5. Checking for adequacy of Waterway Provided Discharge ‘© Avg. Waterway Required 4 Proposed Opening 2 Hoight of Water Avg. Bed Level hh Ain, Formation Required Formation level adopted Provided formation Level is 0.K. 1.6213 cumsoc @ v 19213 0.8265 Sqm Ag. Waterway Total With 0.9265 12 07720 m 200.188 BL + Htofwater + free Board 200.1830 4o7T20 +07860 201.7810 201.7410 ° 4 Dedicated freight corridor Corporation of India, [BR NO-70 IR KM 25,901(Khurja-HafizPur) Estimation of Design Discharge for Railay Bridge, Topesraphy Catchment Ave Leng of Longest Steam Height Ofarhest point Height of Pint noest eight io 10.8 11 Nature of Sl ‘Avg. Bed Leve Observed HEL Plain (0.0752 Sqm 0310 Km 201.892 M ‘e012 M arm s99.12M 200.608 M 84945 247 BR NO-70 IR KM 25.901(KhurjaHafizPur) Using improved Rational Formula 0.50 = 0278xCxIxA, ‘Where (@-50 = 50 Years Design Food Discharge ‘¢ = Runoff Coefciont Catchment Area Run off coemcient Doseripton of ho catchment Sandy Sl Sandy Laory ai Areas Atuvumisitycoastal aca Red soll/Clayey loan gray 0: brown alluvium clivated Plains /tall crop / wooded areas. ‘Slack Cotton’ clayey soiighty covered! ighty wooded/Plain ‘Baron / sub mountaine & plateau 50 Years Rainfall Intonsity lasting for tc hour duration where te = tme of cencontration orale for © C= 0249(RxF)*02 C= 0392—RxF)*02 C=041S RF) O2 C= O4SBRKF)A OZ ‘ay sot plateauaron c= o496in xF)*02 Winer Re ‘50 Year 24 nou point aif (em) i ‘Areal Reucton factor depending upon catchment Area 8 duration rinfal fom table beiow uraton of Ranta Catchment AwainSa.Km. <30Nin 301060 6OTo 100 Mn Min <2880.Km on ost 088 251080 54.km on 08 087 5b 130 Sq km o7 07 088 1801025089. Km ae 078 095 ‘ta Rainfall Duration shal be equals the caculated forthe cacthment {orestimating he tine of concentration) as per Bhatnagar formula feo eH = 1031x031 x0317272) °% - 02107 he. . 0.2107 hr. x60 = 12.6411 Min 4916 248 [BR NO-701R KM 25.901(Kh Nature of Soilis, Sandy Soll/ Sandy Laom! arid Areas, C= 0.249(RXF) 0.2 ja HfiaPur) R 300.00 mm F o72 249x(RKF) 9 i 0.511 3 Calculation of intensity of Ranfall (1) 2 tehRato . 0.1303 FromFig. 4 of RF 16 b thRatio= . 034 FromFig. 40f RBF- 16 © GooficientK === toh Ratlo “Thal I 0.3834 « T R024) : 30000 mm Reo) = RS0(24) x1 hto 24h Rahal Rate, _ 300 x04 7 102.00 mm WW R60() = kxRs0(4) _ 09894 x10200 : 38.1027 mm iv Inkofrafal() = R50) z 3910 ‘O.2107 1855982 movi, 4 Design Food Discharge= aso = 0z7BxGWxA : x02 x0BsIt 1858082 x 0.0752 - 3.3023 cumlsee ) os\g947 249 Discharge © Avg. Waterway Required Proposed Opening Height of Wator f Avg. Bed Level hh Min, Formation Required Formation level adopted Provida! formation Level ts OXK. BR NO-70 IR KM 25.901(KhurjaHafizPur) ‘Chocking for adequacy of Waterway Provided 3028 cums a v 3023 175 1.8870 sam 1 12 2 Wiatoew “otal With 1.8870 12 15730 m 99.112 BL + Htofwator + free Board 199.1120 415790 +0720 201.4880 201.4680 [ods 250 Dedicated freight corridor Corporation of india. BR NO-71IR KM 26.163 (Khurja-HafizPur) Estimation of Design Discharge for Railway Bridge, Topography Catchment Area ‘Lena of Longest Stream Hight Of farthest point Hight of Point of Intorost, Hoiht Derof 10 811 Natu of Sot ‘Avg. Bed Level ‘Obeerved HFL Pian 0.0801 S4 Km 0880 Km 201.987 M ‘98.017 297m 390017 M 200.560 M 4249 251 [BR NO-THIR KM 26.163 (Khurfa-HafizPur) 11 Using improved Rational Formula 0.60 =0278xCx1xA Where (@-80 = 50 Years Design Flood Discharge '¢ = Runoff Cootciont 1 = 50 Years Rainfall Intensity lasting forte hour duration where te = tme of ccncentration ‘2 = Catchment Area 2 uno eoottcont LDoaaktin of tho catehmant 1 Sant Sol/ Sandy Laon aid Areas > Aluvumisttycoasta are plains! tal eop/ wooded areas & Barren eub mountaine & ploteau 9 Hilysol/platesurbarren ‘Red sol /Clayey loan gray or brown alluvium cultivated ‘Back Cotton clayey soilighty covered ightly wooded/Plain Formula for © © =0249(RKF)*0.2 © =0382RKF)*02 C= 0415RKF)*02 C= 0486—RxF)*02 C= 0498(R x) 0.2 Where Re 50 Yesr 24 nour point rainfall (cm) Ee ‘Areal Reduction factor depending upon catchment Area & duration ralnfaltrom table below Catchment Avea in Sq. Km, <30.Min <2589.Km on. 25%050 Sq.km ov S10 19.0 Sq. km o7 1301025084. Km 088. Duration of Rainfall 301060 6070100 Min Min ost 088 08 087 070 0.86 078 0.85 Note Rainfall Duration shall be equal othe caculatedt forthe cacthment {or estimating the me of concentration(z) as per thatnager formula te ren [048x045 x045/ 297) °° . 0.3006 hr. . 0.3006 hr. x60 Z 10.0354 min [BR NO-71IR KM 26.163 (KhurjaHafizPur) [Nature of Solis, Sandy Soil/ Sandy Laoml ald Areas, C= 0.249(RxF)* 0.2 R 300.00 mn F on Ca0mex(RKF) oF . gst 3 Calculation of intensity of Rainfall (1) teh Rao a.s702 From Fig. 4 of REF -16 ‘th Rato= CooficiontK R028) 7 Rs0(1) 5 R50 (te) : Int ofralnan () = Design Flood Discharge = aso a 036 FromFig. of REF -16 toh Ratio hao 2.0 034 0.5005, 30000 mm 50 (24) 1 nto 26h Rainfall Rat 300x038 128 kxRs0(1) 0.5005 x102.00 51.0531 mm R80 te) ‘ 51.05 0.3006 169.8432 mmvhe. 0.27BxCxKA xo27s xaast1 x 169882 xo.0801 3.2189 cumisee ssed9ed 253 BR NO-7AIR KM 26.169 (Khurja-HafizPur) 5 Checking for adequacy of Waterway Provided a Discharge: © Avg. Watorway Required Proposed Opening © Height of Water 1 Avg, Bod Level hy Min, Formation Required Formation level adopted Provided formation Level is O.K. 3.2189 cursoe a Vv 32189 175 1.8304 Sqm Wate “Total Width 15330 m 199.017 BL + Hot water + foe Board 1990170 415330 408170 201.3670 201.3670 co ° e 4 Dedicated freight corridor Corporation of India, BR NO-72 IR KM 26.525 (Khurja-HafizPur) Estimation of Design Discharge for Ralway Bridgo. Tovoarephy Caterment Awa Length of Longest Steam Hght otarest pint Height of Pin of herost Height Dif of 108 11 Nature of So Ave. Bed Level Observed HEL Plan 0.1471 Sakin 0.520 km 702.829 M 198.920 M 390M 198.929 M 200450 M BR NO-72 IR KM 26.525 (Khurja-HafizPur) 41 Using improved Rational Formula aso Whore 50 = 50 Years Design Food Discharge unoff Coefficient 50 Years Rainfall Intensty lasting for c hour duraion where t= time of ccncentraton 1278 xCx1xA ‘8 = Catchment Area 2 Run off coetictent Description of tho catchment Fora for © 11 Sandy Soll” Sandy Laon aid Areas C= O2sRXF)*O > Alavumdsitycoastal area c=0392—RxF)*02 Red sol Clayey loan gray or brown alluvium cultivated = . plains tall rop/ wooded areas C=OAIRK FAO ‘Black Cotton clayey soilighty covered Iighty wooded/Prain |& Barn / sub mountaine & platoau C= 04S6—RKF)*O2 ‘© Hilly soil plateaurbarren © =0490RxF)*02 where R 50 Year 24 hour poln rainfall (cm) oe ‘Aceal Reduction factor depending upon catchment Area & duration rainfall rom table below Duration of Rainfall Catchment Awan Sq.Km. <30Min 90106060 To 100 Min Mia <2.55a.km or ost oe 251050 Sq.km on 08 os? 510 13.0 Sq. km or 079 0.86 1301025089. Km oss 078 0.85 "Note Rainfall Duration shal bo equal to the caculatod Ic fr tho cacthmant {or estimating the ime of concentraton(te) as per bhainagar formula cs (era) . {062x062 x082/3.90) °™ = 0.3012 be. . 03812 hr. x60 . 22.8749 Min ; 1924 » “256, [BR NO-T2 IR KM 25525 (Khurja-HaizPur) [Nature of Soll is, Sandy Soll/ Sandy Laom arid Areas, C= 0.249(RXF)*0.2 3. Caleulation of intensity of Rainfall (1) 2 tehRatio : 0.1944 From Fig. 4 of REF 16 btnRatio: - 034 From Fig. 4 of REF 16 © CooficitK = = to Ratio Th Rabo 7 0.1946 ost = ostt7 4 1 Rees) = 20000 mm 1 R5O(1) = 50 (24)x1 M0 24h Rainfall Ratio, : 300x038 _ m2 W R00) = keRs0(1) = 05717 x10200 = 583124 mm IW Int ofrainfal() = 80 6) ‘ : 58.31 0.3812 i 152.9512 mm. 4 Design Flood Discharge = aso = 027xGx1xA = xo27s —xasstt = x1829512—xo.t47t | 53234 cumisoe 4925 “p67 [BR NO-72 IR KM 26,525 (Khurja-HaizPur) 5 Checking for adequacy of Waterway Provided 2 Discharge: © Avg, Waterway Required «1 Proposed Opening ight of Water f Avg. Bod Lovet ln, Formation Required Formation level adopted Provided formation Level i O.K. 5.3234 cunisor a v 5.3234 175 3.0819 Sqm ‘Ag. Waterway “Tral Wh 3.0419 1520 m 198.029 BL + Hlofwator + to» Board 198.9280 415210 +08290 201.2700 201.2780 Dedicated freight corridor Corporation of India. [BRNO-73 IR KM 26.675 (Khurja-HafizPur) Estimation of Design Discharge for Railway Bridge, ‘Toposraphy Catchment Area oe > Lengtn of Longest stream D- Hoight Offathest point Height of Point ot interest Feige oot ot 10.811 Nature of So Hi Avg Bed Level 1 Observed HEL Pin 0.1850 Sa km 0550 km 201.186 M 198.484 M 270M 98.464 M 200.376 M 1 BR NO-73 IR KM 26.675 (Khurja-HafizPur) Using Improved Rational Formula 050 = 0278xCxIxA Where (0-50 = 50 Years Design Food Discharge ‘© = Runoff Coofiiont 50 Years Rafal Intonsty lasting forte hour duration where te = tme of cncenraion 1 = Cotchment Area Run off cooficiont Description ofthe catchment Formula for © ‘Sandy Soil Sandy Laon avid Aras © =028RKF)AO2 Alluviun/sitylcoastal area C=0sszRxF)*02 Fd soil /Clayey loa! gray or brown alluviuy cultivated m odisRXAIA Bains! al cop / wooded areas a Black Cotton! clayy soilighty covered ighty wooded/Plain {Barron / sub mountain & patoau Cm 0sssRKF)*02 ity sol /plateaubarren c= 0498RxF)*02 Were R= {50 Year 24 hour point antl (em) ‘Areal Reducton factor depending upon catchment Area & duration rainflfrom table beiow Duration of info Catchment Aveain Sa.Km. <30Min 301060 6OTo 100 Min ‘Min <2 Sq.Km oe ost og 251050 Sq.Km ont 08 oe? 5t0 13.0 Sq. km 07 079 086 13.0 0 25089, Km 0.8 078 085 Note: Rainfall Duration shal be equal othe caculated tc forthe eacthment {or estimating the time of concentratior(c) as per bhatnagar formula eo we z 1055 x0.55 x0.55/270] 9 i 0.3828 he. - 0.3828 hr. x60 . 22.9407 Min 'BR NO-TS IR KM 26.675 (Khurja-HafizPur) Nature of Soll is, Sandy Soll/ Sandy Laom arid Areas, C= 0.249(R.xF)* 0.2 R= 300.00 mn F on 29 x(RRF) 2 ost 3 Calculation of Intonity of Rainfall (1) 2 tehRato = 0.1947 From Fig, 40 RBF- 16 > nRato: = 034 FromFig. dof REF -16 © CoeficletK == ——te Ratio “th Rabo i: 1947 ery = osra7 1 50,24) . 30000 mm i R01) = RS0(24)x1 hto 24h Rail Rato, e 200x038 = 10200 mm i R50.) = KxRs0(1) : 0727 x10200 = 58.4110 mm lv Intofrainfang) == R50) cs ei saat 0.3825 S 152.706 mein. 4 Design Flood Discharge = aso = o27excatxa xoz7s— xasstt =x 1827708 ———x0.1880 5.6871 cumisee [BR NO-79 IR KM 26.675 (khurja-HafizPur) 5 Checking for adequacy of Watorway Provided Discharge © Avg, Waterway Required 4 Proposed Opening © Height of Water 1 Avg, Bed Level h Min, Formation Required k Formation level adopted Provided formation Level is OK. 6.8871 cum/soe a Vv e871 175 3.8212 Sam Ag, Watorw Total With 32212 1910 m 98.468 BL + Htotwater + fee Board 198.4640 +9110 +08050 201.1800 201.1800 Dedicated freight corridor Corporation of Ini BR NO-74 IR KM 27.207 (Khurja-HafizPur) Estimation of Design Discharge for Raliway Bridge. ‘Topography Catchment rea Length of Longest Steam Hoight of atest point Hoight of Point of Iiorost Height Difof 10.811 Nature of Sol ‘Avg. Bed Level Obeerved HEL Pan 0.7328 SqKim 0.825 Km 201496 M 196.586 M 485M 196.506 M 700.025 BR NO-74 IR KM 27.207 (Khurla-HalzPur) Using Improved Rational Formula 50 =0.278xCxIKA Whore (50 = 50 Years Design Flood Discharge ‘© = Runoff Coofficient 1 = 52 Years Rafal Intensity lasting forte hour duration wher ‘8 = Catchment Area un off coeticient Doserpton ofthe eatchmant Forma for Sandy So Sandy Laom! arid Areas = 02491RxF)*02 ‘Auviawsitycoasa area = 3s2iRxF)*02 Red sol Clayey oar gray or brown eluvum culvated = " plains tall crop / wooded areas C= O4ISIRKF)*02 ‘Black Cotton clayey sollighty covered/ightly wooded/Pain 48 Baron / sub mountaine & plateau C=04se(RxF)*02 Hilly sot /plateaurbarron C=0498RXF)AOZ where Re 50 Year 24 hour point rainfall (em) ‘Aveal Reducton factor depencing upon catchment Area & duration rainfall rom Lh table below Duration of Rainfall, Catchment Areain Sq.Km. <30Min 3008060 To 100 Min Min <2859.Km on ost oss 251050 Sq.km on 08 oa? 510 13.0 Sq. km o7 079 086 13.00 25.084. km os 078 03s: Nto:- Rainfall Duration shal bo equal othe caculated tc forthe cacthment {or estimating the ime of concentallon(c) 2s per Bhatnagar formula te rey . 10.825 x0.825x0.625/4.85] °° = 0.4753 he. . 0.4753 hr. x60 - 28.5168 Min “4932 BR NO-741R KM 27-207 (Khura-HatzPur) Nature of Sollis, Sandy Soll/ Sandy Laom/ ard Areas, C= 0249(R XF)*0.2 R 300.00 mm F on F029 x(RXE) «2 = 0.3511 Calculation of intensity of Rainfall (1) tehRato : 0.2201 FromFig. def RBF- 18 = 038 FromFig dof REF 15, CooficitkK «= == toh Ratio “in Ratlo - 0.2201 038 - sera R024) 300.00 mm Rs0(1) 50 24) 110 24h Raita Ratio . 200098 = 102.00 mm R20 (te) = KxRS0() = sara x102.00 Z 66.0168 mm Int ofranval() = R80) © . ‘e602 ‘04759 . 138.9011 mm. Dosign Flood Discharge: aso = O27BxCxIXA : 0278 xoasi1 x 1389011 x0.7325 2 24,0725 cum/see 4933 BR NO-74 IR KM 27.207 (Khurfa-HafizPur) ‘hocking for adequacy of Waterway Provided a Discharge : 24.0736 cumlsoe © Avg, Watorway Required a @ v E 2aoras. 175 = 13.7563 Sam Proposed Opening ~ 2 2 4 © Holght of Water - ‘Avg, Waterway Total With = 13.7583, Avg. Bed Level - 190.588, 1h Min, Formation Required BL + Htotwater + tres Board . 198.5860 #34300 409610 Formation evel adopted = 200.9860 Provided formation Level i O.K. <= ‘Topography Catchment Area Length of Longest Stearn Hoght of tathest point Hoight of Point of intorost Height Diof 10 8 11 Nature of So ‘Avg. Bed Level (Observed HFL Dedicated freight corridor Corporation of India [BR NO-75 IR KM 28.878 (Khurja-HafizPur) Estimation of Design Discharge for Rallway Bridge, Pain 0.3858 Sq km 0495 km 203.089 M 190.140 M 3.90. 199.149 21arsM BR NO-75 IR KM 26.878 (KhurjaHafizPur) Using Improved Rational Formula 0.80 =0278xCx1xA Whore 0-80 = 50 Years Design Flood Discharge ‘¢ = Runoff Coofciont ' = Catchment Area Run of coefficient Deception ofthe catchment Sandy Sol/ Sandy Laon aid Areas Aluvursityfoastl area Red sol (Clayey loa gray or brown alluvium cultivated plains / tall eop / wooded areas lack Cotton clayey silighty covered! Eghtly wooded Pain {Baron / sub mountaine & plateau Filly sot plateaurvaren = 50 Years Rainfal Intensity lasting forte hour duration where c= ime of concentration, Formuta for © C= O249(RxF)*02 ° 332(RxF)*02 C= o4tsiRxF)*02 C= 0455(RxF)*02 C= 0498(RxF)*02 where R {50 Year 24 hour point rainfall (cm) ‘Areal Reduction factor depending upon catchment Area & duration ranfalfrom "= table below Duration of Rafat Catchment Areain Sa.Km, <30Min 90108060 To 100 Min Min <2.55q.km o72 oat 08s. 251050 Sq.Km on 08 087 510 130 Sq. km o7 079 086. 43.010 25089. Km 048 078 08s, [Note Rainfall Duration chal bo equal othe caculatod tc for the cacthmont {or estimating the time of concentraon(c) as per Bhatnagar formula te rey . 10.85% 0.85x0.485/3,90) 9 . 0.2957 he. : 0.2067 hr. x60 : 47.7409 Min [BR NO-751R KM 28.878 (Khurja-HaflePur) Nature of Soll is, Sandy Soll Sandy Laom/ arid Areas, C= 0249(RxF)* 0.2 R= 900.00 mm F on 29x(RKF) «2 ast 3 Calculation of intensity of Rainfall (1) a. teh Rato : 0.1683 FromFig. Sof RBF-16 b : 034 Frog. 6ofRBF-18 © Cooticntk «=== tehRato “th Rato ‘ 1 Ream) : 30000 mm React) = R50(24)x 1 ht 24 Raat Rate = 300x038 : 402.00 mm REO) = KR) ‘ 0494o x10200 - 504819 mm Iv inofraivane) == 0 © : s04e 02957 : 1707302 mm. 4 Design Flood Discharge = 060 = 027excxIxa . xoz7s — x0sstt =x 1707302 0.3888 7 15.5847 cumisac 8 Discharge © Avg, Waterway Required | Proposed Opening © Height or Water 1 yg, Bod Level Bln, Formation Required Formation level adopted Provided formation Level ie O.K. [BR NO-75 IR KM 28,878 (Khurja-HafizPur) 5 Checking for adequacy of Waterway Provide 15.5847 175 8.9055 Sqm Wat “Total With 8.0055, 4 22260 m 190.149 BL + Htofwator + fre Board 199.1480 12.2280 13240 202.6900 202.6900 Dedicated freight corridor Corporation of india. [BR NO-76 IR KM 29.540 (Khurja-HafizPur) Estimation of Design Dischargo for Railay Bridgo. Topography Plain (Catchment Area 0.1044 Sq km Length of Longest Stoam (0425 Km Height Offarhest pont 202.802 M Helgi of Point of terest 200.162 M Height Daf of 10.811 231M Nature of So ‘Avg. Bed Level 700.162 M Observed HEL 201.380 M 4939 udth 271 BR NO-76 IR KM 29.540 (Khurfa-Hafi2Pur) Using Improved Rational Formul 2.50 = 0278xCxIxA Where (0-50 = 50 Years Design Flood Discharge Runoff Cooficent '50 Years Rainfall intensity lasting fore hour duration where to= te of concentration = Catchment Area Run off coefficient Description ofthe catchment Formula for © ‘Sandy Sol/ Sandy Laom’ arid Areas C= o249(RxF)AO2 Allvursitylcoastal area c= oss2RxF)*02 Red sol Clayey lar gray or brown alluviu cultivated Plains ‘all crop / wooded areas COstsiRxF)*02 ‘Black Cotton clayey slighty covered ightly wooded rain ‘8 Barron sub mountaine & plata C= 0455(RXF)*02 ily sot platoaurbarron c=04s8(RxF)*02 where R= 50 Year 24 hour point rainfall (cr) ‘Areal Reduction factor depending upon catchment Area & duration rainfall from table below Duration of Rainfall Catchment Area in Sa.Km. <30Min 30106060 To 100 Ma Min < 2.59. km on ost os 251060 $3. Km on 08 087 Sto 13.0 Sq. Km oF o78 86 13,0 0 25. Sq, Km 088. 078. 085 Note Rainfall Duration shal be equal to the caculatod Ic fr the cacthmont for estimating he tmo of concentatien(e) as per bhatnagar formula f= uray = 10.425 «0.425: 0.425/2.97 ] © = 0.3063 hr. = 0.3088 hr. x60 a 18.3758 min ved 4940 [BR NO-7E IR KM 29.540 (Khurj-HafizPur) [Nature of Soll is, Sandy Soll/ Sandy Laom arid Areas, C= 0.249(RXF) “0.2 R 300.00 mm F on 29x(RKF) 02 03st 3 Calculation of intensity of Rainfall (1) a tehRato = 0.1719 FromFig. 401 REF 16 b thRato™ : 034 From Fig. 40fRBF- 16 © GooffclontK == teh Ratio “th Rao : 0.710 ost = 0.5055 e 1 R50 28) : 300.00 mm i Rs0(1) = R50 (24)x 1 hto 24h Rainfall Rai, . 300x038 : 102.00 mm WW ROK) = KxRSO(1) . 0.5085 x102.00 7 51.5637 mm v bot ofrainfal() «= R50 (e) co 7 51.56 ‘0.308 = 168.3642 mm. 4 Design Flood Discharge = oso = 0z7axCxIxA = x0278 —xOBstt x 1689642 xo.1044 Z 44.1589 cumisec SAA1 5 ch 2 Discharge © Avg, Waterway Required 4 Proposed Opening 2 eight of Water Avg. Bed Level Min, Formation Required Formation level adopted Provided formation Level is O.K. BRNO-76 ‘ang for adequacy of Watorway Provided a 29.540 (KhurjaHafizPur) 4.1580 cum/se0 o v 4.1580 178 2.3765 Sam Avg. We Total With 23765 1.1880 mm 200.182 BL + Htofwater + free Board 200.1620 190 +4:3490 202.6990 202.6990 4942 Lio Dedicated freight corridor Corporation of india [BR NO-77 IR KM 29.992 (Khurja-HafizPur) Estimation of Design Discharge for Railway Bridge, ‘Topography Catchment Area Length of Longest Stream Hoight of farthest point Height of Point of inerst Helght oi of 10.811, Natur of Sot ‘Avg. Bed Lovel Obeorved HFL Plain (00353 Sq km 0.250 Km 203.960 M 201.49 M 22M 208.149 M 201.925 M q [BR NO-77 IR KM 29,982 (Khurja-HafizPur) Using Improved Rational Formula 050 = 0278xCx1xA Where 50 = 50Yeers Design Flood Discharge ‘© = Runoff Coefcient 50 Years Rainfall Intonsty lasting for tc hour duration where | = Catchment Area Run off coefficient DDosonption ofthe catchment ‘Sandy Sei Sandy Laom aid Areas ‘Aluviurstylcoastal area Fad soll /Clayey loa gray or brown alluviuy cultivated plains al crop / wooded areas Black Cotto clayey soiighty covered! ighty wooded! Frain & Sao ub mountane & patoau Pity sol /plateaubarren sme of cxncentration Formula for © Cm o2M9(RXF)*02 C=0392—RKF)*02 C=0415RXF)*O2 C=0AsBRXF)AOZ C=04s8RxF)NOZ Were Re {50 Year 24 hour pont rainfall (cm) ‘Areal Reduction facior depending upon catchment Area & duration rainfall from ‘able beiow Duration of Rainfall Catchment Ava in $q.Km. <30Min 301060 60To 100 Min Min <2.889.Km ore oat 08 251050 $4.Km on os o87 Sto 130 Sq. km o7 079 0.86 13,0 0 25.084, Km 068 078 0.85 Note Rainfall Duration shal be equal othe caculated efor the eachmant for estimating the time of concentratlon(c) as per Bhatnagar formula eos em - 10.25%0.25%0.25/2.82) © = 0.1665 hr. 7 0.1685 he. x60 . 9.9927 Min “Agra BR NO-77 IR KM 28.992 (Khurje-HafizPur) Nature of Solis, Sandy Soil/ Sandy Laom arid Areas, C= 0.249(R.xF) 40.2 Ro. 300.00 mm Fos ore 249 x(RKF) 02 ast 3 Caleulation of tensity of Ralnfall (1) that : 0.1089 From Fig. 4of RF-16 b that» : 034 From Fig. 4of ROF-16 © CooficentK = = teh Ratio “hao 7 0.1088 034 7 031s ‘ 1 R60 (28) : 20000 mm i R50) = R50(24)x1 hto 26h Rafal Rat : 00 x04 4102.00 mm fH RS0(e) = keRSO(1) - 03188 x10200 7 324818 mm Ie Invofrainl() = R50 © : 24a 0.1855 - 195.0330 mar. 4 Design Flood Discharge = os = o77excuxa : xo27s x05 1950300 0.0359 . 1.6290 cumlsoc [BR NO-77 IR KM 29,992 (Khurja-HafizPur) 5 Checking for adequacy of Waterway Provided a Discharge © Aug. Waterway Required 4. Propesed Opening Heh of Water Avg, Bod Level |) Min, Formation Required Formation level adopted Provided formation Level is OX. 1.8200 cumlsee a v 119200. 175 0.9309 Sqm Waterway “Total With 0.9300 12 0770 m 201.149 BL + Htofwator + fre Board 201.1490 voz700 107740 202.6990 202.6900 4 Dedicated freight corridor Corporation of India. [BR NO-78 IR KM 30.555 (Khurja-HafizPur) Estimation of Design Discharge for Railway Bridge, Topography Catchment Area Length of Longest stream Height Of farthest point Hight of Ponto nterost Hight Di of 10.811 Nature of Sail ‘Avg. Bed Level Observed HEL Pain 00325 Sa km 0300 Km 204.206 M 20.270 m 302m 201.276 M 201.985 279 1 [BR NO-78 IR KM 30.555 (Khurja-HaizPur) Using improved Rational Formula 50 = 0278xCx1xA ' ‘a = Catchment Area Run att eoeticlent DDosoiption af the eatcant Sandy Sot/ Sandy Laom aid Areas -Nluvuméstycoastal area Red gol Clayey loam gray or brown aluvuny cutvated Plains tall erop / wooded areas Black Cotto’ clayey sciltighty covered ight wooded/Piain {Barren / sub mountain & platoau Filly soi /plateaurbaren mere R= 50 Year 24 hour point aint (er) tabla below Duration of Rafat Catchment ea in Sa.Km. <30Min 30106060 To 100, Min Min <258q.km on ost 88 2.5050 Sq. Km o7 03 087 810 18.0 $4. km oF 078 0.88 19.0 t0 25.089, Km oss, o78 095. Note Ralnfall Duration shal be equal to the caculated tc forthe eacthment {or extmating the time of concentration) a per Bhatnagar formula te ey a 0.4964 hr. 0.1964 hr. x60 41.7004 Min 4948 280 __ 50 Years Rainfall Intensity lasting for tc nour duration where te = time of cncentration Formula for © C=0249RKF)*O2 © =0382RKF)*02 C=04tsiRxF)*02 C= 0455(RKF)*02 G=0498(RxF)*02 ‘Areal Reducton factor depending upon catchment Area & duration rainfall from 5 103x03x03/3.02) ° [BR NO-78 IR KM 30.555 (Khurja-HafaPur) Sandy Leom/ arid Areas, C= 0.249(RxF) 802 Natur of Soll is, Sandy So 300,00 mn 072 cmon x(RxF) — o a ast R F 3 Galeulation of intensity of Rafal (1) @ tenRatio . 0.1232 FromFig.4 of RBF-16 b thRatio= . 034 FromFig.4 of RBF = 16 © CoaficlentkK = 7 03624 ‘ 1 R80 (24) 5 300.00 mm a RS0(1) = R60 (24) x10 26 h Raina Rtlo, i 300 x04 : 10200 mm R50 (te) = ers) = 0.3628 x102.00 . 36.9652 mm Nv Intofrainfal@) = RSD te) © : 2697 0.1068 - 160.1806 meine, oso = 02raxcxxA - xoz7@ — x0ast1 x 188.1808 xo.0325 = 14471 cumisee KM 30.555 (KhurjasHanzPur) 5 Checking for adequacy of Waterway Provided 2 Discharge © Avg, Waterway Required 18 Proposed Opening 9 Height of Water F Avg. Bod Level hin, Formation Required Formation level adopted Provided formation Level is O.K. 44471 cumleoe 2 v asm 175 0.8269 Sam ‘Avg. Watorway_ “Tool Wh o.s269 12 06000 m 201276 BL + Htofwater + o> Board 201.2760 +osa00 +08510 202.8260 202.8260 Dedicated freight corridor Corporation of India. [BR NO-79 IR KM 30.426 (Khurja-HafizPur) Estimation of Design Discharge for Railway Bridge. Toposraphy Catchment Area Length of Longest Steam Holght Offathest pint Holght of Point of intrest Heit Dit of 10. 14 Nature of So ‘Ava Bed Level (Obcorved HFL Pin 0.030 54 Km 0210 km 208.185 M 201.405 M 276M 201.405 202.170. BR NO-79 IR KM 30.426 (Khurje-HafaPur) 41 Using improved Rational Formula 50 = 0278xCx1xA Where (Q.50 = 50 Years Design Flood Discharge ‘¢ = Runoff Coefficient = 50 Years Rainfall tony lasting for fe hour duration where te = te of eencentration 18 = Catchment area 2 Runoff coefficient Description ofthe catchment Formula for © ‘4 Sandy Soll/ Sandy Laom/ ard Areas C= 0249(RxF)*02 bb Aluviursitylcoastal area C=O392—RKF)*O2 Red sol /Clayey loan gray or brown aluviuny cultivated plains tall cop / wooded aroas C=04tsRxF)*02 Block Cotton! clayey solighty covered ightly woodod/Plin {4 Boren / sub mountaine & plateau c= 0456(RXF)A02 © Hilly cil/plateautbarren C=04s8RXxF)AO2 were Re 150 Yar 24 hour point rainfall ern) ‘Areal Reduction factor depending upon catchment Area & duration rainfalrom table below uration of Rafat Catchment Areal Sa.Km. <30Min 30106060 To 100, Min min «2.589. Km 072 ost os 251050 Sq.Km ont 03 07 5t0 19.0 Sq. km o7 078 0.88 13.010 28.0 84. Km 0.68 078 8s "Note Reif! Duraton shal be equal othe caculated Ic fr the eacthment {or estimating tho time of concentration(t) 2s por Bhatnagar formula we yn . [0.21 x0.21 x0.21 276) 9% : 0.1401 hr. = 0.1401 tv. x60 - 8.4049 Min 14952 284 BR NO-79 IR KM 30.426 (Khurj-HafizPur) Nature of Soil is, Sandy Soll/ Sandy Laon arid Areas, C =0:249(RxF) 402 Calculation of intensity f Rainfall (1) a teh Ratio - 0.0960 FromFig. 401 REF - 16 7 034 FromFig. dof RBF-16 © Cooffcientk == teh Ratio ‘th Rat = 0.0960, ot : oases ‘ i rey = 20000 mm © Rs0) = R60(20)x ho24 Rata Rate : 200 x04 . 102.00 mn Rs0¢6) = KaRs0(1) - ones s10000 7 22.809 mm itrann() = sO : 81 eaor . 205.661 me. os = ozxcxa : x0278— x0asts—xanseset xno : 1.9058 cumisec key 4953 7 ee 85 [BR NO-T9 IR KM 30.426 (Khurja-HaflePur) 5 Checking for adequacy of Waterway Provided a Discharge © Avg. Waterway Required 4 Proposed Opering © Haight of Water Avg. Bod Level Min, Formation Required k Formation evel adopted Provided formation Level Is 0.K. 1.6088 cumsee o v 5058. 175 0.9176 Sqm Ag, Wate “Total With 9176 07650 m 201.405 BL + Htotwator + tee Board 201.4060 10.7650 +07850 202.9550 202.9550 eh 954 Dedicated freight corridor Corporation of India, BR NO-80 IR KM 30.913 (Khurja-HafizPur) Estimation of Design Discharge for Railay Bridge, Topography Catchment rea ‘Lent of Longest Steam Hoight of farthest point Holght of Point of ncrost Heloht Difof 10.8 11 Natue of Sot ‘Avg. Bed Level (Observed HFL Phin 05875 Sa Km 0,750 Km 202.982 M 190.982 M 3.95 98.982 M 201.785 M [BR NO-80 IR KM 30.913 (KhurjaHafizPur) Using improved Rational Formula 0.60 = 0278xCxIxA Where 50 = 50 Years Design Flood Discharge ‘¢ = Runoff Coefficient 50 Years Raita 2 = Catchment Area Runoff coeticient Dosen ofthe catchment ‘Sandy Soll / Sandy Laon ad Areas Atuviumisityeoastal area Rd soll /Clayey loan gray or brown alluvium cultivated plains / tal crop / wooded areas. ‘Black Cotton’ clayey sollighty covered! ighty wooded/Piain Barron / sub mountaine & platoau iy sol plateaurbarron tensity lasting forte hour duration where te time of encantation Formula for © c= 1249) xF)* 02 c= 03s2RxF)*02 AIR XF)* 02 c= 0458(RKF)*O2 C= 0498(RxF)*02 Were: Re 50 Year 24 nour polnt rainfall (em) ee ‘Aveal Reduction factor depending upon catchment Area & duration rainflfrom table below Duration of Rinfalt Catchment Arwain Sq.Km. <30Min 30106060 To 100, Min Min <2. Sq.Km or ost 08s, 251050 Sq.Km ont os 087 5t0 13.0 Sq. km o7 078 086. 13.0 to 250084, Km 048 078 08s. Not: Rainfall Duration shall be equal to the caculated te forthe cacthment for estimating the Ume of concentraton(t) as per Bhatnagar formula eo em i 10,750.75 0.75 /3.95} °° = 0.4622 hr. - 0.4622 hv. x60 : 27.7381 Min ore BR NO-80 IR KM 30.813 (Khurja-HafizPur) ature of Solis, Sandy Soll Sandy Laom/ arid Areas, C= 0.249(R x) “02 3 Caleulation of Intensity of Rainfall (1) 2 tehRato : 0.2174 FromFig. 4 of RBF 16 b InRetia : 034 From Fig. dof REF 16 Co “th Ratio 1 Rs0@H) : 30000 mm R001) = R50(24)x1hto26 Rana Rao : 200x034 = 102.00 mm ke R5Dee) = kxRs0(1) . (06205 x10200 : 652341 mm WW Incofrainian@) = sO - 0529 ase . 141.1277 mm. 4 Design Flood Discharge = aso = 0278x0x1xA . xoz7sxasst = xtaiia77,——x0.5a75 _ 19.6176 cumisoe BR NO-80 IR KM 30.915 (Khurja-HafizPur) 5 Chocking for adequacy of Waterway Provided 2 Discharge = 19.5175 curse © Avg. Waterway Required = 2 a s96176 178 = 11.2101 Sam {1 Proposed Opening . 1 4 3 © Hight ot Water - ‘vg, Waterway Total With a +2101 4 “ 2800 m v9. Ded Level . 198.982 til, Formation Required BL + Hotwater + foe Board : 198.9820 +2090 +14960 2 203.2810 ic Formation level adopted = 2032010 Provisad formation Level is O.K. Dedicated freight corridor Corporation of India. BR NO-81 IR KM 31.428 (Khurja-HaftzPur) Estimation of Design Discharge for Railway Bridge. Topooranty Pain Catohmont Ava 12987 Sak Length of Longest Stream 4.285 Km Height Offarthest point 203.103 M Hight of Point of interest 199.343 eight if of 10.811 385M ane o Soa ‘Ave. Bed Level 190.343 m Observed HFL 201.900 M 1 BR NO-B1 IR KM 31.428 (KhurjaafizPur) Using improved Rational Formula 0.60 = 0278xCxIxA ‘Where (0-50 = 50 Years Design Flood Discharge ‘¢ = Runoff Coefficient 1 = 50 Years Raina ntensity isting fort hour duration where t= me of coneenration ‘2 = Catchment Area un off cooficent ‘Dosciption of the catchment Formula for © Sandy Soll Sandy Laon arid Areas Gm 0240(RxF)*02 Atuvurisitylcoastl area C=03s21RxF)*0.2 Red sol Clayey loam gray or brown alluvium cultivated . . plains tal op wooded areas ConatsRar)*02 ‘Black Cotton clayey soilghty covered! Ightly woeded/Piin ‘& Barron / sub mountain & platoau c= a4se(RxF)*02 Hilly ol /plateaubarren C= a4s8(RxF) 02 where Re ‘50 Year 24 hour point rina (cm) ‘Areal Reducton factor depencing upon catchment Area & duration rainfal from tae below Duration of Rinfall Catchment Aveain Sa.Km. <30Min «30106060 To 100 Min Mn <2589.km on oat 0.88 251050 Sq.Km on os oar 510 13.0 Sq. km o7 078 8s 12,0 0 25084, Km 068 078 085, Note Rainfall Duration shall be equal to the caculated te forthe eacthment for estimating he ime of concentratlon(c) a8 per bhatnagar formula to eH 8 a 11.285 x 1.285% 1.285 /3.85} °# e 0.8142 he. : 0.8142 Wr. x60 = 48.8520 Min BR NO-81 IR KM 31.428 (khurja-HaflePur) ‘otueo of Solis, Sandy Soll/ Sandy Laom arid Areas, C= 0.249(R xF)* 0.2 R 00.00 mn F oat 240x(RKE) 02 0.5922 8 Calculation of intensity of Rainfall (1) a tehRato . 0.3028 From ig. 40f REF - 16 b tmRatio - 0.38 FromFig. 40f RGF 16 © CooficiontK === te Rao “th Rallo _ os028 034 = 007 1 Ree) = 30000 mm ROH) = R50(24)x 1 nto 24h Rainfall Ratio, . 900x038 z 10200 mm R80 e) = KxR60(1) : 0.8007 110200 = 90.8520 mm iv Intofrainfal() == R50 (te) © . 908s Daa = 111.5845 mone. 4 Design Flood Discharge = oso = 0278xcx1xa 4 xo278 — xosszz =x 11585 x 1.2097 : 35.2034 cumisee [BR NO-B1 IR KM 31.428 (KhurjaHafizPur) 5 Checking for adequacy of Waterway Provided ‘2 Discharge © Avg. Waterway Required Proposed Opening (© Hoight of Water f Aug. Bod Lovet in, Formation Required Formation level adopted Provided formation Level is OK. 35,8004 cumieoe a Vv 35.8034 175 20.4591 Sqm 2 4 3 Ay “Total Width 20.4595, 3 25570 m 180.343 BL + Htotwater + ton Board 199.2400 425570 «17260 203.6260 203.6260 oe > Dedicated freight corridor Corporation of India. [BR NO-82 IR KM 31.760 (Khurja-HafizPur) Estimation of Dasign Discharge for Railway Bridge, Topoarephy Pin Catehment Ava 0.1598 Sak Length of Longest siream 400 km Height OFferbest point 203.143 M Height of Point of ntrest 700.248 M Height it ot 108 11 200M Nature of So ‘ug. Bod Level 200283 M Obcored HEL 02.140 M 1 [BR NO.82 IR KM 31.760 (Khurja-HafizPur) Using Improved Rational Formula 050 = 0278xCxIxA Where (0-50 = 50 Years Design Flood Discharge ‘© = Runoff Coefficient 1 = 50 Years Rainfall itensy lasing forte hour duration where {8 = Catchment Area Runoff cooticiont DDoscipon ofthe catchment Formula for Sandy Sei Sandy Lao aid Areas c= o240(RxF)*0.2 ‘tuvumisityonasta area cxosmiRxF)*02 Rod sol Clayey loam gray or brown alwlumy catvated plains all eop wooded araas Ce 0a15RXF)A02 Black Cotto clayey soilighty covered lightly wooded/Pain eenaetndeiaog ‘Baron / sub mountain & platoau Hilly sol /plateaufbarren c= 04s8(RxF)*02 where Re 50 Year 24 hour point rainfall (cm) ‘Areal Reduction factor depending upon catchment Area & duration rina fom table below Duration of Rint Catchment Aea in Sa.Km. <30Min 30106060 To 100, Min Mio <2559.Km o72 oat oss, 251050 $4.km on 08 oar Sto 13.0 Sq. km o7 070 026. 13,0 0 25.0Sa, Km 0.68 078 08s Note Rainfall Duration shal be equal othe cacuated tc forthe cacthment for estmating he time of concentation(c) as per bhatnagar formula te 1 = [04x04 x0.4/2.90) 9 > 0.2683 hr. : 0.2083 br. x60 a 16.0974 min AS4 BR NO-82 IR KM 31.760 (Khurja-HattzPur) Nature of Soll is, Sandy Soil/ Sandy Laon arid Areas, C= 0.249(RF)* 0.2 R 300.00 mm F on 240x(RXE) 02 0.511 8 Calculation of Intensity of Rainfall (1) 2 tehRato . 0.1573 From Fig. 4 of ROF 16 b IhRato= : 036 From Fig. 4 of RBF 16 © CooficientK = === tohRatio “hRato e 0.1873, om - 0.4627 e 1 R024) = 300.00 mm 1 Reso) = R50 (24)x1 nto 2th Rainfall Ratio. I 300 x08 _ 102.00 mm Tc) = keRsO(1) a (0.4627 102.00 - 47.1948 mm Nv bntotrainfa() = R80 (te) co = 4739 0.2683 : 1759095 mine. 4 Design Flood Discharge = aso = 0278xCxIxA . x0278 —x08511 x 175.9095 0.1505 : 5.5385 cumisee my 0985 [BR NO-821R KM 31.760 (KhurjaHafizPur) 5 Chocking for adequaey of Waterway Provided a Discharge © Avg. Waterway Required 4 Proposed Opening ghtof Water vg. Bad Level lp, Formation Required Formation level adopted Provided formation Level ie O.K. 6.6906 cum/ece 2 Vv 6.6396 175 3.7935 Sam Avg. We “Total Width 37935 19970 m 200.243 BL + Htotwater + tras Board 2002420 070 +17100 203.0499 203.8500 4966 ge Dedicated freight corridor Corporation of India, BR NO-83 IR KM 32.506 (Khurja-HafzPur) Estimation of Design Discharge for Rallway Bridge. “Topography, Catchment rea Length of Longest Stream Height Of artnet point Hoight of Pont of Inert Heloht if of 10.811 Natue of Sol ‘Avg. Bed Level Observed HFL. Pain 0.1879 Sq km 0.500 km 204.500 201.000 M 270M 201,990 202.550 M BR NO-83 IR KM 32.506 (KhurjatafizPur) Using Improved Rational Formula 278xCx1xA, 1 19 = Catchment Area ‘un off cooticent ‘Doserpton ofthe catchment ‘Sandy Sol Sandy Laon ald reas ‘Aluviumisityfcoastal ar ed soll /Clayey loan gray or brown alluvium cultivated pial tll crop / wooded areas Black Cotton! clayey sollight covered lightly wooded/Plain __ 50 Years Rainfall intent lasting for tc hour duration where te = tme of concentration Formuta for © Cw o249(RxF)AO2 392(R x F)*O2 1415(RXF)*02 ASG(RXF)*O2 490(R x F)*O2 {Barron /sub mountaine & plateau Hilly sol /plateaubarren Where R {50 Year 24 hour point rainfall (cm) : ‘Areal Reducton facor depending upon catchment Are & duration rainfall fom table below Duration of Rinfall Catchment AreainSq.Km. <30Min 3010.60 60 To 100 Min Min <255a.Km o72 oat 088 250050 5q.Km ont 08 os? 510 13.0 Sq. km o7 079 0.86 43.00 25089. km 08s. 078. 08s "Note Rainfall Duration shal be equal othe caculated te forthe cacthmant for estimating the time of concentration(c) as per Bhatnagar formula te remy Zi [06x06x08/270) ° a 0.4184 br. a 0.4184 hr. x60 : 25.1025 min 4988 300 BR NO-83 IR KM 32.506 (KhurjaHafizPur) Nature of Solis, Sandy Soll Sandy Laom/ arid Areas, C= 0.249(R.xF)* 0.2 Calculation of Intensity of Rainfall (1) teh Ratio . 0.2065 From Fig. of RBF -16 o 034 From. of ROF- 16 CooficiontK = = teh Ratio hate 7 0.2085 O38 . 0.5044 R50 (2) 30000 mm R50 (1) 50 (24) 1h to 24h Rall Rato, 5 300x038 = 1 R80) = keRSO1) . ‘8044 x102.00 = 61.8538 mm In ofraial() = R50 co Design Flood Discharge = oso = 02rBxCH KA . xozre = xasstt = x1473645 0.1879 : 6516 cumisec 4989 “301 er BR NO-83 IR KM 32.506 (Khurja-HafizPur) 5 Checking for adequacy of Waterway Provided & Diecharge © Avg. Waterway Required 44 Proposed Opening Hoight of Water fg. Bed Level 1h Ala, Formation Required ke Formation level adopted Provided formation Level is OX. 6.5516 cumisee a Vv 65516 175 3.7438 Sam ons “Total With 201.960 BL + Htotwator + fre Board 201.9000 15600 +07000 204.3490 204.2490 1930 Dedicated freight corridor Corporation of In BR NO-84 IR KM 32.956 (Khurja-HafizPur) Estimation of Design Discharge for Railway Bridge. Topography Plain Catchment Aca 20448 San Lenatn of Longest Steam 0875 km Height Of fares point 206.051 M Height of Point of interest 203.081 M Helo Dior 08.11 297M Nature of Sot ‘Avg Bed Level 203.081 M beoned HEL 208.850 BR NO.84 IR KM 32.956 (Khurja-HafizPur) Using improved Rational Formula 250 278xOx1xA, Years Design Flood Discharge ‘© = Runoff Coofiient 1 fa = Catchment Area Run ot ooticient ‘Doxnotin ofthe catchment Sanly So / Sandy Laon aid Areas ‘Atuvuistycoastal area Rd sll /Clayey loan gray or brown alluvium cutvated Plains tll erop/ wooded areas ‘lack Cotto’ clayey soifighty covered ighty wooded/Plin {Daron / ub mountaine & plateau Hilly sol /plateaubarren moro __ 50 Yoars Rainfall Intensity lasting forte hour duration where te = ime of ccnventration Formula for © c=o2s9RxF)*02 c=0332—RxF)*02 C=0415(RxF)*02 C=0456(RxF)*02 C= 048i xF)*02 R 150 Year 24 hour pint rainfall (cm) it ‘Areal Reducton factor depending upon catchment Ara & duration rainfaltrom table below Duration of ainfa Catchment AveainSq.Km. <30Min 3016060 T0100 Min Min <2559.Km o72 ost ee 2.51050 Sq.Km o71 08 oe? Sto 18.0 Sq. km 07 078 086. 13.00 25.04. Km 0468 078 085 [Note Rainfall Duration shal be equal othe cacuated tc forthe cacthment for estimating he me of concentratier(c) as per Bhatnagar formula te 1 = [0.575% 0.575x0.575/2.07) 0 - 03874 he. ™ (0.3874 he. x60 = 23.2438 min *ggTe 304 ‘BR NO.84 IR KM 32.956 (Khurja-HafizPur) Nature of Soll is, Sandy Soil/ Sandy Laom arid Areas, C= 0.249(RxF)“ 02 R= 300,00 mm F on 240x(RxF) 9 ‘O85 3. Caleulation of Intensity of Rafal (1) a tehRato : 0.1962 From Fig. 4 of RBF -16 b - 034 FromFig. 4 of REF = 16 © CoeficlentK = == teh Ratio thRate _ 0.1962 0s6 : osm ¢ 1 R80@8) : 30000 mm i Reso) = REO (2A)x 1 nto 2th Rainfall Rao, _ 300 x0.38 = 102.00 mm ROC) = KxRSO(t) - 0.8771 x10200 = 58.3856 mm Wy Intofrainfa() = R60) © a 59.87 0.3874 _ 151.9520 mn. 4 Design Flood Discharge = 250 = 027axCxIxA . xozre —xasst1 —x15t9820 © xaosag t 1.6143 cumisoe Aus 305 BR NO-84 IR KM 32.956 (Khurfa-HafizPur) 5 Choking for adequacy of Waterway Provided Discharge . © Avg, Waterway Required zl Proposed Opening - 9 Holght of Water - 1 Ava, Bed Level - ln, Formation Required Formation level adopted yk formation Level is O.K. \e> 1.5143 cure a v 16143 176 0.9225 Sam 1 12 12 ‘Avg. Waterway “otal With 0.9705 12 07660 m 203.081 BL + Hlotwator + to» Board 203.0810 107600 +07010 204810 204.0810 Dedicated freight corridor Corporation of india. [BR NO-86 IR KM 34.408 (Khurja-HafizPur) Estimation of Dasign Discharge for Railay Bridge. Topearapty Phan Catehmont A 47481 Sqn Length of Longest Seam 1.315 km Height Offarhest point 206:345 Height of Point of erst 200.705 M Height Di of 108 14 555M Natio of Sot ‘Avg, Bed Level 200.795 M Obeoned HEL 204.300 M BR NO-86 IR KM 34.403 (KhurjaHafizPur) 11 Using Improved Rational Formula, 50 = 0278xCxIxA Were 50 = 50 Years Design Flood Discharge Runoff Coefficient 50 Years Reinfal tony lasting for hour duration where tc = time of concentration ' 1 = Cotchment Area 2. Runoff coefficient Description of the catchment Foret for © a Sandy Soll/ Sandy Laom arid Aroas C= O2N9(RX FOZ > Aluvumysttyicoastal area © =0382RxF)*OZ Red sol /Cayey loan gray or brown alluvium cultivated plains al erp / wooded areas CH Osis xF)*02 Black Cotton’ clayey solfight covered ghty wooded/Pain q C=O4SG(RKF)*O2 |& Barron / su mountaine & platoau © Hity sol plateaulbarron G=0490R xF)*02 Where R= 150 Yeat 24 nour point ralnfal (cm) oy ‘Aveal Reducton factor depending upon catchment Area & duration ranfalfrom table below Duration of info Catchment Ara in Sa.Km, <30Min 301060 6OTo 100 Min Min 2559. km o72 ost 088 251050 S3.Km ont os os7 S10 13.0 Sq. km o7 079 06 43.0 1025.0 89, Km os 078 0.85 [Note Rainfall Duration shall be equal othe caculated tc forthe cacthment {or estimating the time of concentatlon(c) a8 per hatnagar formula jo ey es = [1.375% 1.375% 1375/5855] . 0.7608 7 0.7698 hr. x60 . 46.1863 Min age [BR NO-86 IR KM 34.403 (Khurja-HaftzPur) "Natur of Soils, Sandy Soll/ Sandy Laom arid Areas, 249(RXF)* 02 R= 300.00 mm Fos oat c=0200x(RxF) 92 = 0.s22 3 Calculation of intensity of Rainfall (1) a ier ot Hllaset needa eee a8 ees Se eee i sig se ea shnanasi : ae aise Gag Peet aai teeta $ i Slee 4 Design Flood Discharge = a0 = 02rBxCxIxA e ogre xosme = 1139885 x 1.7451 c 49.0746 cumisee 4gitT ova [BR NO-86 IR KM 34.403 (Khurja-HaftePur) 5 Checking for adequacy of Waterway Provided 2 Diechargo © Avg. Waterway Required 4 Proposed Opening © Height of Water 1 Avg. Bed Level Min, Formation Required Formation level adopted Provided formation Level is O.K. 49.0748 cumeoe a v 49.0746 15 28.0426 Sam 2 ‘4 ‘ Wit “otal Width 29.0426 3 135050 m 200.705 BL + Htetwatr + toe Board 200.7050 435050 +40550 205.9550 708.3560 Dedicated freight corridor Corporation of india. [BR NO-87 IR KM 35.680 (Khurja-HafizPur) Estimation of Design Discharge for Railway Bridge. “Topography CCatchmont Area ‘Length of Longest Stream Hoight OF fathest point Height of Pint of Interest Height Difof 108 11 Nature of Sol ‘Avg. Bed Level Observed HEL Pain 0.0325 Sakm 0200 Km z07296M zona M 318M 200.14 M 204900 M vi 311 BR NO‘87 IR KM 35.680 (Khurja-HafizPur) 1 Using Improved Rational Formula 50 = 0278xCxIxA Where: 50 = 50 Years Design Flood Discharge ¢ = Runoff Cooficent __ 50 Years Rainfall ntensity lasting for tc hour duration where te: ' ‘a = Catchment Area 2 Runoff coefficient Description of the eatchmant Formula for © 13 Sandy Soll/ Sandy Laom’ ari Areas Cao2sORKF)*02 > Aluvtumsity/coastal area c=03s2RxF)*02 Red sol Clayey oar gray or brown slavumy cltvated Plains tal op / wooded areas CHO4tsRKF)*02 ‘g_ Black Cotton! cayey soilighty covered ighty wooded/Plain {Barren /eub mounaine & plaicau c= 04ssRKF)*O2 Hilly S08 platesubarren c=040aRXF)A02 where R= 50 Year 24 hour point rainfall (crm) a ‘Areal Reduction factor depending upon catchment Area & duration rainfalfrom table below Duration of Rint! Catchment Awa in Sa.Km. <30Mn 90106060 To 100 Min Mia <2.589.km or ost oe 251050 S9.Km ont 08 087 S10 180 Sq. km 07 079 0.86 13.01025.084. Km 0.468 078 os [Note Rainfall Duration shall equal to the caculatod tc forthe cacthmont {or estimating the timo of conconraton(t) as per bhatnagar formula rey 2 [02x02x02/3.18) 0% a 0.1268 he. : (0.1268 hr. x60 . 7.6099 Min s s [BR NO-7 IR KM 35.680 (khurf-HaizPur) ‘Nature of Solis, Sandy Soll/ Sandy Laon ard Areas, C= 0.249(RXF)* 0.2 3. Caleulation of intensity of Rainfall (1) a tehRato . 0.0907 FromFig. 461 REF 16 b thRat - 034 From Pig. 4of REF -16 © CoofisontK == teh Rao “hRato = 0907 03 = 02580 ‘ 1 R80 2) = 300.00 mm W Rs0() = R50(24)x 1 nto 24h Rana Rat, : 200x038 = 402.00 mm We R60) = KxR50() = 0.2660 x402.00 S 212198 mm Ini ofrainfal() = R80 - 2122 0.1255 = 2146131 mmr. 4. Design Flood Disenarge = aso = 027exCxIxA . x027s —x0asit ——x2i4e131 x 0.0828 si 11.6503 cumisee veh 4981 BR NO‘87 IR KM 35.680 (Khurja-HafizPur) 5 Checking for adequacy of Waterway Provided Discharge: © Avg. Waterway Required Proposed Opening © Height of Water 1 Avg. Bed Level h Min, Formation Required Formation evel adopted Provided formation Levels O.K. 1.8503 cumsoe a v 18503 176 0.9430 Sqm “Total With 0.9430 12 07860 m 2044 BL + Hlofwatr + to» Board 204.1140 40.7860 +07500 205.6500 208.6500 Dedicated freight corridor Corporation of India, [BR NO-88 IR KM 36.643 (Khurja-HafizPur) Estimation of Design Discharge for Railway Bridge. Topography Catchment ea Length of Longest Steam Height OF farthest pont Hoightof Pint of interest Height Difof 10 811 Nature of Sol ‘Avg. Bod Level Observed HEL Plain (0.0916 Sak 0.188 km 207.238 M zoaste M 22M 2oasi8 M 205.100 M 6283 BR NO-88 IR KM 36.643 (hurja-HatizPur) 4. Using Improved Rational Formula 250 = 0278xCxIxA Where (0-50 = 50 Years Design Food Discharge ‘© = Runoff Coefiient = 59 Years Rainfall Itonsity last forte hour duration wher te 1 = Catchment Area ime of cencentraion 2. Run off coefficient Description ofthe catchment Fermula for © ‘Sandy Soil/ Sandy Lao ard Areas c=0249(RKF)*OZ bb Alluvumsttyicoasta area G=0sx2RRxF)*02 Fd soil /Clayey loa gray or brown alluvium cultivated 2 4 © plains tl erop/ wooded areas Gautetepecr) “a2 Black Cotton clayey soilighty covered! Eghty wooded/Plain a OABeRER)™ J @ Barren sub mountane & plateau Ceaasan ar) *a2 ‘© Hitysol/plateaufbarren © =0498(RxF)*02 Whore Re 50 Year 24 hour pont rainfall (em) ‘Areal Reduction factor depenting upon catciment Area & duration rainfall rom table boiow Duration of Rinfa Catchment ea in Sa.Km. <30Min 30106060 To 100 Min Min < 2589, Km o72 ost ose 251050 4.km ont os o87 50 13.0 Sq. km o7 079 0.86 13.010 25.089. Km 0.68 078 0.88 Note Rainfall Duration shal be equal othe caculated tc forthe cacthment {or estimating the time of concentration(t) as per Bhatnagar formula cs wa = [0.185 «0,185 0.185/2.92] - 0.1208 he. 7 0.1205 hr. x60 = 7.2296 Min 4988 L316 [BR NO-#E IR KM 36.643 (Khurja HafizPur) ‘Natur of Soll is, Sandy Soll/ Sandy Laon arid Areas, C =0240(RxF) "0.2 R 00,00 men Fe oa Ca 0249 x(RxF) 92 : asi 38 Calculation of intensity of Rainfall (1) a tenRato . 0.0862 FromFig.4 of RBF- 16 b thRatio= : 034 From Fig. 4 of RBF-16 © CocficientK = == Ich Ratio Rate = 0.0882 3 - 0.2504 ‘ 1 RSD (es) = 20000 mm & Rso(H) = R80 (24)x 1 hto 24h Rainfall Ratio. . 300 x0.38 = 102.00 mm ROC) = KxRSO() 7 0.2504 x102.00 _ 26.4593 mm Wy Int orainfl() = R60 (te © s 26.46 0.1205 - 219.5001 mm. 4 Design Flood Discharge = oso = 027axCxIxA : 0278 xoastt x 219.5001 : 1.5418 cumisee xo03i6 Provided formation Level ie O.K. BR NO-88 IR KM 36.643 (Khurja-HafizPur) ‘Checking or adequacy of Waterway Provided Discharge ‘Avg, Waterway Required Proposed Opening Height of Water ‘vg, Bod Level ‘Min, Formation Required Formation evel adopted 1.8818 cumfoos o ove 15418 a 0.9382 Sqn “Total Wid 204.18 BL + Hlofwatoe + foe Board 204.3100 +0780 +07600 205.8690 205.8690 Dedicated freight corridor Corporation of Indi BBR NO-89 IR KM 37.625 (Khurja-HafizPur) Estimation of Design Discharge for Ralay Bridge. Topesraphy ‘Catchment Area Length of Longest Steam Height Offarthest pont Height of Point of intrest Height Dif of 108 11 Nature of Sot ‘vg. Bed Level Observed HEL Phan 0.0355 Sq Km 0250 Km 208.308 204.980 6 332M 204.989 M 205.780 4937 6319 [BR NO-89 IR KM 37.625 (Khurja-taizPur) Using improved Rational Formula 250 = 0.278 xCxIxA Where (2-50 = 50 Years Design Food Discharge ‘¢ = Runoff Coeficent £0 Yoars Rainfall Intensity lasting fort hour duration where te = time of eoncontraton 1 = Catchment Area un off eoetficent Doserpton ofthe catchment Formula for © ‘Sarly Sol Sandy Laon aid Areas c= a249(RxF) 802 ‘Alkwiusttycoastal area c= asaiRxF)*02 ‘od sol (Cayey loam’ gray or brown alluvium eulvated pling tall erp / wooded areas C= asis(RxF)*02 Slack Cotton clayey soiighty covered! Sghty wooded/Plain ‘8 Barron /eub mountaine & plateau 0 DASA FY "02: Hilly sol platoaubarren c= asga(RxF)*02 Winore ® {50 Year 24 hour pont rainfall (em) en ‘Areal Reduction factor depending upon catchment rea & duration rainfall rom ‘abi below Duration of Rainfall Catchment Aveain Sq.Km. <30Min 30106060 To 100 Min Min <2.58q.km o72 oat og 2.51050 $4.Km on os 087 510 130 Sq. Km 07 070 0.88 19,0 t0 25.0 Sa, Km 0.68 078 0.85 Note Rainfall Duration shal be equal othe caculated tc forthe cacthment {or estimating the tme of concentration(c) as per bhatnagar formula te ean Si 1025 x0.25x0.25 14:22) 9% a 0.4574 he. 7 0.1574 hr. x60 7 9.4455 Min bob 6388 [BR NO-89IR KM 37.625 (KhurjaHataPu) ‘Nature of Soils, Sandy Soll/ Sandy Laom/ arid Aroas, C= 0.249(R xF)* 02 R= 30.00 mn F on 240x(RXF) 9 0.511 3 Calculation of Int ity of Rainfall (1) a ten Rato : 01037 FromFig. 4 ofRBF-16 » that = 034 FromFig. 4 ot RBF-18 © CoefidentK == teh Rao “Ratio | os0x7 034 : 0.3050 a 1 R808) = 300.00 mm i RsOKH) = R60(24)x1h10 24h Rana Rao, - 300x098 = 102.00 mm R60) = KxRSOC) - 03080 x102.00 = 314138 mm Ie Imofraintal@) = R50 © : sat Oar - 197.5413 mm. 4 Design Flood Discharge oso = 027 KoMxA : xo27e — xO8SI = x19786413. x 0.0085 7 4.6601 cumsee 4939 324) [BR NO.89 IR KM 37.625 (Khurja-HafizPur) 5 Chooking for adequacy of Waterway Provided a Discharge © Avg, Waterway Required Proposed Opening © Helght of Water 1 Aug, Bed Level Min. Formation Required Formation level adopted Provided formation Level is 0.K. 1.9601 cursee 2 Vv 4.6601, 204.980 BL + Hlofwator + fos Board 2049090 so7810 107650 208.5460 206.5460 Dedicated freight corridor Corporation of Inia. BBR NO-90 IR KM 38.670 (Khurja-HafizPur) Estimation of Design Discharge for Railway Bridge. Toreoraphy ‘catchment Area Length of Longest Stream Height Offahost pont Height of Point of terest Height Di of 10.811 Nour of Sot ‘vo. Bed Level ‘Obeorved HEL Phan 0.0941 Sam 0225 Km 200.424 208.754. 267M 705.754 M 206.520 M 4994 323 [BR NO.90 IR KM 38.670 (Khurja-tafizPur) Using Improved Rational Formul 2.50 = 0278xCxIxA Where (0-50 = 50 Years Design Flood Discharge ‘¢ = Runoff Gooticent £50 Years Rainfall Intensity lasing fort hour duration where te= time of concentration 1 = Catchment Area Run off coefficient DDescipton ofthe catchment Forni for © Sandy Seid Sandy Laon aid Areas c= o240(RxF)*02 ‘Aluvumsiyfcoastal area c= oss2(RxF)*02 Rd sol Clayey loan gray or brown alvin culated Plains tall crop / wooded areas yAISIRXF)*O2 Black Cotton clayey sovighty covered Iighty wooded/Pain £& Barren /2ub mountaine & platoas (Gm OAanRx Fy+02 Hilly so plateaurbaren c= 0408(RxF)*02 were R= 50 Year 24 hour point rainfall (em) ‘Areal Reduction factor depending upon catchment Area & duration ralnfalfrom table below Duration of Ralnfll, Catchment AveainSq.Km. <30Min 30106060 To 100 Min Min <258q. km or ost oe 251060 $3.Km o71 08 087 Sto 13.0 84. Km oF 079 88 43,0 t0 25.0 Sq, Km ose 078 0.85 Note Rainfall Duration shall be equal to the caculated cfr the cacthment {or estmating the time of concenrationte) as per Bhatnagar formula fj os way : [0.225 0.228 %0.225 /2.67 | °° a 0.1522 by = 0.1522 hr. x60 = 9.1309 Min ‘BR NO90IR KM 38.670 (Khurja-HafaPur) ‘atuee of Soils, Sandy Soll! Sandy Laon ard Arvas, C= 0.249(RxF) “02 R = 200.00 mm Fos on cH0280x(RXF) 92 0.511 3 Calculation of intensity of Rainfall (1) teh Rabo - Q1011 From Fig.4of RB -16 b thao = 034 FromFig. 4 of RBF-16 © CooicentK == toh Rati “ate 7 oxo oat : oasra 1 soe) | 30000 mm i Reo) = Rs0 (2H Mo 2MRahvalRato. : 300 x0.94 : 102.00 mm R80 Ke) = keRs0(1) : 02978 x10200 5 03278 mm Inuofrabiang) = R50 = - 09 a822 i 1902804 mm. 4 Design Flood Discharge = oso = 0278xGxIxA - x07 oss! 1992664 xn : 1.607 cumisee [BR NO.90 IR KM 38.670 (Khurja-HafizPur) 5 Checking for adequacy of Waterway Provided Discharge © Avg, Waterway Required 4 Proposed Opening Height of Water 1 Ag, Bod Lovet Min, Formation Required Formation level adopted: Provided formation Level it OK. 1.9079 cumsee —2 v 416079 175 208.758 BL + Htofwater + foe Board 205.7540 407000 +07040 2073140 2073140 4994 326 Dedicated freight corridor Corporation of India, BR NO-91 IR KM 39,030 (Khurja-HaftzPur) Estimation of Design Discharge for Railway Bridge. Toposrepty Catchment Area Longh of Longest Steam Height fans point Height of Pein intrest, Height on of 108 11 Nature of Sl ‘vg. Ba Level Observed HEL Phin (0.0331 Sak 0210 Km 200.128 M 205.48 M 228M 205.848 M 206.696 M 4995 327 BR NO.94 IR KM 39.030 (Khurja-HafizPur) 1 Using Improved Rational Formula 50 = 0278x0x1xA Were (2.50 = 50 Years Design Flood Discharge ‘= Runoff Coaffiant 1 50 Years Raina Intensity lasting forte hour duration where te= tine of concentration Catchment Area 2 Run off eoefelent Dosetiton of the catchment Formula for © Savvy Sol/ Sandy Laom’ aid Aras C= 0289(RXxF)A02 > Aluviumsityleoasal area c= 0392RxF)*02 Rod soil Clayey loam gray or brown aluvury culvated plains Ital erp / wooded aroas C=OAISIRXF)AO ‘lack Cotton clayey soifighty covered ight wooded/Pain “"”@.Sarren su mountane & plateau C= 0458(RXF)*02 Hily 2 ploteaubaren cm 04seiRxF)*0.2 wo R ‘50 Year 24 hour point rainfall (em) ‘Areal Reduction factor depenting upon catchment Area & duration rainfall fom iad table below Duration of Raina Catchment veain'Sq.Km. <30Min 20106060 To 100, Min Min 2.5 Sq. Km o72 oat 088 2.51050 84.Km o71 0 087 Si0 18.0 $4. km 07 079 0.86 13.0 0 25.0 Sq, Km 068 078 085 "Noto Rafal Duration shal be equa tothe caculated tc forthe cacthment for octmatng the timo of concentraton() as per bhetnagar formula te remy - [021x021 x0.21 13.28) 93° : 0.1320 he. = 0.1320 hr. x60 . 79190 min BR NO-S1 IR KM 39.030 (Khurja-HafizPur) Natur of Soll is, Sandy Soll/ Sandy Laon ard Areas, ¢=0.249(RxF)* 0.2 R 200.00 mm F o72 240x(RXF) 92 8511 Calculation of intensity of Rainfall (1) 8 tenRato . 0.0828 From Fig. 4 of RBF - 16 b thRatio : 034 FromFig. 4 of REF -18 © CoeffelontK = te Ratio Th Rato - 0928 0st . 029 1 RDS) . 30000. mm i ROM) = R50 (@4)x 1 ht 24h Rainfall Ratio, . 900 x0.38 fa 10200 mm R50 fe) = KeRs0() : 0.2729 x102.00 a 278381 mm w = R506) © “ 2704 0.1320 e 2409206 mane. 4 Design Flood Discharge 050 = O278xCxxA 2 x0278 — xomstt —x2108206 © xo.033t : 16519 cumisee [BR NO-S1 IR KM 39.030 (Khurja-HafizPur) 5 Chocking for adequacy of Waterway Provided a Discharge - 1.0519 cursos © Aug, Waterway Required - a Vv Proposed Opening - 12 © Hedoht of Water = fy Bed Lovet - 205.848 1h Min, Formation Required BL + Hlofwator + fo» Board z 205.8480 so7e70 +0740 “ 207.4090 ic Formation level adopted : 207.4090 Provided formation Lavel is O.K. Dedicated freight corridor Corporation of India. BR NO-82 IR KM 39.740 (Khurja-HafizPur) Estimation of Dosign Discharge fér Relay Bridge. “Toposrpty Plain Catchment Area 0844 Sakm Length of Longest Siroam 0.350 km Height Ofrthest point 209.816 M Helght of Point of nterest 208.095 M Height Ditof20 811 292M Nature of Sot ‘vg. Bed Level 205.095 M Observed HFL, 206.745 M 4 ‘BR .NO.82 IR KM 39-740 (Khurja HafaPur) Using Improved Rational Formula 0.50 = 0270xCxIxA Where (2.50 = 50 Years Design Food Discharge ‘c= Runeff Coaffiient ' ‘a = Catchment Area Run off coefficient Description of the catchment ‘Sandy Sol Sandy Laony ard Areas ‘Akaviumsityicoastal area Red sol Clayey loan gray or brown aluviun culvated plains Ital erp / wooded arcas Black Cotton clayey soighty covered ight wooded/Pain 8 Barren / sub mountaine & plateau Hily ol /plateaubaron 50 Years Rainfall Intensity lasting forte hour duration where to= time of concentration Formula for © c= azaa(RxF)*02 c= a392(RxF)*O2 C= a4tsRxF)NO2 C= a456(RxF)*02 Cm 0498(R x F)*02 wnere: Re 50 Year 24 hour point rainfall (em) ee ‘Areal Reduction factor depending upon catchment Area & duration rinfalfrom table below Duration of Rental Ctchmant AeainSq.Km. <30Min 20106060 To 100 Min Min <2.589.km or oa: 088 251050 Sq.Km ont 08 oa? Sto 19.0 84. km 07 073 086. 43.0 1025089. Km 088. 078 085 [Note Fanfll Duration shall be equal tothe caculated tc fr the eacthment for estimating the time of concentration) 28 por Bhatnagar forma cs eo - [0.35 x0.35%0.35/2.92] 0% = 0.2331 he. - 0.2331 hr. x60 i 13.9864 Min ‘3000 332 BR NO92 IR KM 39.740 (Khurja HaizPur) Natura of Solis, Sandy Soll/ Sandy Laom/ arid Areas, C= 0.240(RxF)* 0.2 R 300.00 mm F on. CH029x(RxF) — %2 ast (Calculation of Intensity of Rainfall (1) teh Ratio : 0.1416 From Fig. 40fRBF - 16 Ah Ratio= : 094 From Fig. 4 of RBF -18 CoeficiontK === te Ratio Th Rabo : 0.1416, a 7 oats, 50 (24) : 30000 mm REO(1) = R50 (24)x 1 nto 26h Rainfall Ratio e 300x034 : 102.00 mm R60 (te) = KxRSO(1) = ‘ones x102.00 2 42.4659 mm Int ofranfa() = R50) © : 4247 02887 : 182.1743 meine. Design Flood Discharge 50 = O27BxCxxA - xozre — xosst1 =x 1821743 x08 z 1.7045 cumlsee 5001 sa sulle o 333 BR NO.92 IR KM 39:740 (Khurja HofizPur) 5 Checking for adequacy of Waterway Provided a Discharge © Avg, Waterway Requires Proposed Opening © Hott of Water 1 Avg, Bod Love! hin, Formation Required Formation level adopted Provided formation Level Is O.K. 1.7845 cumsee a Vv 17845, 175 1.0197 Sqm 1 12 12 "Toll Wicks 10107 12 08500 m 705.805 BL + Htofwator + free Board 205.8850 0.3500 +0850 2075950 207.5950 Dedicated freight corridor Corporation of India. BR NO.93 IR KM 40.240 (Khurja-HafizPur) Estimation of Design Discharge for Railway Bridge. Topography Catchment Area Length of Longest ream Height Of farthest point Height of Point of Interest Height i of 10.811 Nature of Sil ‘Avg. Bed Level ‘Obcorved HFL. Plain 0.0706 Sa Km 0265 km 208.627 M 205.67 M 326M 208.67 M 208.915 M 5003 335 BR NO-S3 IR KM 40.240 (Khurja-HafizPur) Using Improved Rational Formula 50 = 0270xCx1xA Where (2.50 = 50 Years Design Flood Discharge ‘© = Runcff Coaffcient 1 = 50 Years Rainfal Intent lasting forte hour duration where ‘= Catchment Area time of concentration Run off eoetficient Desorption ofthe catchment Formula for G ‘Saniy Soll Sandy Laon arid Areas c=0240(RxF)*02 ‘Aluviu/sitylcoastal area c=0322(RxF) 02 Red soil /Clayey loan gray or brown aluviuy eultvated et ‘ plains! al eop / wooded aroas Pa OMI RPO Slack Cotton’ clayey sivighty covered ighty wooded/Pain ‘Baron / sub mountane & plateau Cranennxeyea Filly ool /plateaubarron c= a490(RxF)*02 Winer Re {50 Yoar 24 hour point rainfall (em) ‘Areal Reducton factor depending upon catchment Area & duration ranfalffom table below Duration of Rainfall Catchment Area in'Sq. Km. <30Min 30106060 To 100 Min Min <2.58q.Km o7 oat 0.8 2.51050 Sq. Km ons os oar Sto 130 Sq. Km o7 079 086 13.00 250 'Sq. Km 068 078 0.85 ‘Note Rainfall Duration shall be equal athe eacuated te forthe eactyment {or octimating the timo of concentration(t) as por Bhatnagar formula te rey 7 10.285 x 0.285 x0.285 3.26] © 7 0.1688 he. = 0.168 ne. x 60 : 40,0960 min sad 336 BR NO-93 IR KM 40.240 (Khurja-HaflzPur) Nature of Soll is, Sandy Soll Sandy Laon arid Areas, C= 0.209(R.xF)* 02 R 300.09 mm F on. 240 x(RXE) 0? 0.8511 Caloulation of Intensity of Rainfall (1) ten Ratio : 0.1091 From Fig. 40fRBF - 16 th Rato : 034 FromFig. 4ofRBF-18 CoeficietK === te Ratio “th Ratio - 0.1001 Ost : os210 R804) . 300.00 mm Rs0(1) = R50(24)x 1 hte 24 hRainfal Rat - 300x038 i 10200 mm RS0 (te) = KxR0(1) - 0.3210 x10200 2 327401 mm Intofranial() == RSD © = sar4 0.1085 = 1945721 mine. Design Flood Discharge 250 = O2TxCxIxA s xoz7e = xoastt =x 1985721 x00706 : 3.2502 cumsee wR. 337 BR NO.93 IR KM 40.240 (Khurja-HafizPur) 5 Checking for adequacy of Waterway Provided @ Discharge : 2.2502 cursos © Avg. Waterway Requved = a v 5 1.2602 175 = 1.8573 Sam 4 Proposed Opening - 1 12 2 © Hoiht of Water : ‘vg. Waterway. “otal With : 1.8579 12 “| 1.5480 m 1 Avg Bod Level - 208,387 h Min. Formation Required BL + Htofwater + os Board : 205.3670 15400 +08120 = zorzer0 Formation level adopted : 2or270 Provided formation Level Is O.K. g 5006 338 Dedicated freight corridor Corporation of india, [BR NO-94 IR KM 41.003 (Khurja-HaflzPur) Eztimation of Dasign Discharge for Railway Bridgo. Topoarenhy Catchment Area Long of Longest Steam Height OF ortst point Height of Pointof Interest Height if of 10.8 11 Nature of Sol ‘Avg. Bod Lov! Observed HFL Plain (0.0504 SaKm 0.174 Km 208.318 M 205.478 M 2eam 205.478 M 706.085 M 5007 eu¢ 339 BR NO.94 IR KM 41.003 (Khurja HofizPur) 41 Using improved Rational Formula 50 = 0.278xCxIxA Where (0-50 = 50 Years Design Flcod Discharge (© = Runoff Coofiiont 1 = 50 Years Raina Intensity lasting forte hour duration where 1 = Catchment Area 2. Run olf coefficient Description ofthe catchment Formala for © Sandy Soll Sandy Laon ara Areas c=o28gRxF) 02 b_Aluviumisitylcoastal area C= 0322{RxF)*02 Rod eollClayey loan gray or brown alluvium culvated plains tall op / wooded aroae C= a4I5(RxF)*O2 ‘Black Cotton clayey soilighty covered! Fahtly wooded/Piain ‘Barren / sub mountaine & plateau C= 04s6(RxF)*02 © Hil sol/platesufbarren C= a499(R x F)*02 ers {50 Year 24 hour plnt rainfall (ern) ee ‘Areal Reduction factor depending upon catchment Area & duration rinfal from table below Duration of Rintat Catchment Awa in Sq.Km. <30Min 201060600100, Min Min <2.58q. Km o72 oat 088 251050 Sa. Km o71 03 os7 Sto 130 Sq. km o7 079 0.86 13.0% 25.054. km 068 078 0.5 ‘Note Rainfall Duration shall be equal fo the eacuated te forthe cacthment {or estimating the time of concentraton(t) as per Bhatnagar formula wo my - [0.174 x0.174.x 0.174 12.84) S38 . 0.1142 he, = 0.1142 ne. x60 = 6.8505 Min , 5008 X 340 [BR NO-94 IR KM 41.003 (Khurja-HafizPur) Natur of Soll is, Sandy Soll/ Sandy Laom/ arid Areas, C= 0.249(R x F)* 0.2 R 300.00 mm F 072 249x(RXF) oF 0.511 3 Calculation of Intensity of Rainfall (1) oe 0857 Fromfg At REF 16 b thRato= cat From 4ofRF-16 © GuecentK == chao Rate 7 oss? 3 : easae i ree = 000 nm & Reon = R50 (2H).x1 nto 24h Rata Rao, : a0 x03 : 10200 mmm W Rs0¢6) = kaR60(1) : osm s10200 : 257011 men Wy imetrabtarg) = RSD . : 2570 ania : 2251013 mie 4 Design Flood Discharge = 0.50 = O2TeKCaIxA 7 x0278 = x08511 = x225.1013 0.0504 . 3.4697 cumlsee 5009 “341 {BR NO.941R KM 41.003 (Khurja-HafizPur) 5 Checking for adequacy of Waterway Provided a Discharge © Avg, Waterway Required 4 Proposed Opening © Height of Water Avg, Bad Level th Min, Formation Required Formation level adopted Provided formation Level is O.. 9.1687 cumsec a Vv 3.1637 478 4.8078 Sam Avg, Waterway “otal Wh 1.8078 42 15070 m 2osare BL + Htofwator + toe Board 205.4780 15070 108530 207.8380 207.8980 Dedicated freight corridor Corporation of India BR NO-95 IR KM 41.182 (Khurja-HaftzPur) Estimation of Design Discharge for Railway Bridge Topography Catchment Area Length of Longest steam Hight OF farthest point Height of Point of Interest Height Dif of 10811 ‘Nature of Si ‘Avg. Bod Lovel Obsoned HFL Pain 00318 Sq km 0220 km 208.540 M 206278 M 227M 206278 4 206.980 M 5014 BR NO.95IR KM 44.182 (Khurje-HaizPur) 41. Using improved Rational Formula 0.50 = 0278xCxIxA Where (50 = 50 Yours Dosign Flood Dicharge ‘© = Runoff Coofiiont 1 = 50 Years Rainfall Intensity lasting fr tc hour duration where f= Catchment Area 2. Run off coefficient ‘Doserption ofthe catchment Formula for ¢ 8 Sany Sol/ Sandy Laon ard Areas c= o2H9(RxF) 0.2 b- Aluviumisitycoasta area c=osa(RxF)A0.2 od soil Clayey loan gray 0° brown alluvium cultivated plains tal op wooded areas C=04tsRxF)*02 Black Cotton” clayey soiighty covered! ighty wooded/Plan {arr sub mountain & patoau C= 0456 (Rx F)*O2 © Hilly sol plateaubarren c= 04a0(R x F)*02 Ware Re 50 Year 24 hour point antl (cm) a ‘Areal Reduction factor depending upon catchment Area & duration rainfalfrom ' table below Duration of Rainfall Catchment Area in Sq.Km. <20Min —-30t060—-G0To 100. Min Mia <2.589.Km o72 ost ose 2.51080 $9. Km o71 08 087 510 180 Sq.km on 079 086 4301025084. km 068 078 08s, 'Nte:- Rainfall Buation shall be equal othe cacuatod tc forthe eacthmont forestimating the tine of concentraton(s) as per bhatnagar formula we = eH : 10.22x0.22«0.22/227 | 8 . 0.1972. : 0.1572 x60 - 9.4347 Min BR NO-85 IR KM 41.182 (Khurja-HaflzPur) Nature of Sol! is, Sandy Soll/ Sandy Laom arid Areas, C=0.249(R xF)* 02 R 300.00 mm F on 240x(RXE) 0? 0.511 Calculation of intensity of Rafal (1) @ tehRato . 0.1086 FromFig. 401 RBF - 16 bthRatio= . 034 From Fig. 4of RBF 18, © GooficiontK === tehRaio “bRallo = 0.1036 034 _ 0.3048 a 1 R04) = 30000 mm & RS0(1) = R80 (24)x 1 nto 24h Raina Rao, - 3000.38 iz 10200 mm R50) = KxR50(1) : 0.3048 110200 e 31.0868 mm iv mofraifal() = R60 (te) © . 3108 bse _ 197.6958 mn. 4 Design Flood Diecharge = aso = 02TexCxIxA - xozrs — x0sst1 x 187.6958 © x .0315 . 14734 cumisee BR NO-95 IR KM 41.182 (Khurja-HalzPur) 5 Checking for adequacy of Waterway Provided Discharge © Aug, Wetorway Required Proposed Opening © eight of Water 1 Avg. Bod Level h Min, Formation Required Formation level adopted Provided formation Level is OK. 14734 cunlsoc a Vv 1474 175 0.8419 Sam 1 12 12 Avg. We Total Widh ssa 12 07020 m 208.278 BL + Htofwater + fo» Board 208.2780 197020 +08580 207.8380 207-8380 ae Dedicated freight corridor Corporation of India. [BR NO-96 IR KM 41.433 (Khurja-HafizPur) Estimation of Dasign Discharge for Railway Bridge. “Topography (Catchment Area Leng of Longest Steam Height Of farthest point Height of Point of Interest Helgnt Darof 10.811 Nature of Soi Avg: Bed Level (Obeorved HFL Plain 0.0821 Sam 0250 Km 708.996 M 206270 M 266M 200278 M 206,980 M £05015 347 BBR NO.86 IR KM 41.433 (Khurfa-HaftzPur) Using improved Rational Formula 20 Where 0-80 = 50 Years Design Flood Discharge (© = Runoff Coafciant __ 50 Years Rafal Intensity lating forte hour duration where te= time of concentration 270xCxIxA Catchment Area Run off coefficient Description ofthe catchment Formula for © ‘Sandy Sol/ Sandy Lom atid Areas C= 0249RxF) 0.2 ‘Altuviumisitylcoastal area c=osaRxF) 902 Red soll /Clayey loam gray or brown alluvium cultivated comeneae Blains al crop / wooded areas mA NS) 0 Black Cotton’ clayey soiighty covered lightly wooded/Plain 7 8 Barren / sub mountaine & plateau Coasts Hity sol/plateaubarren c= oaaaRxF) 402 Were R= 24 hour point rainfall (cm) : ‘Areal Reduction factor depending upon catchment Area & duration rainfllrom table below Duration of Rainfat Catchment Aeain'Sa.Km. <30Mn 30106060 To 100 Min Min <2589.km o72 ost og, 251050 84.Km o7t 08 oe? 510 19.0 Sq. km 07 078 086 13.010 25.084. Km 068, o78 08s, "Not: Rainfall Duration shall be equal othe caculatad tc forthe cacthment {or estimating the time of concentraton(e) as per bhatnagar formula tern 2 1025%0.25 x0.25/2.66) ° . 0.1699 hr. 7 0.1699 hr. x60 ‘= 10.1961 min

You might also like