You are on page 1of 9

HPW/HOSE DOWN

FULL AREA: 5631

LOCATION AREA HPW % H/D % HPW SQNC H/D SQNC

T/S 820 100 100 1 1


V/S 1275 100 100 1 1
F/B 3536 100 100 1 1

TOTAL (RM)
DOWN
AMOUNT

1148
1785
4950.4

7883.4
BLASTING
FULL AREA: 5631

LOCATION AREA % BLASTING SUM AMOUNT

T/S 820 SA 1 0 0 0
SA 2 0 0 0
SA 2.5 100 820 15580

V/S 1275 SA 1 0 0 0
SA 2 0 0 0
SA 2.5 100 1275 24225

F/B 3536 SA 1 0 0 0
SA 2 0 0 0
SA 2.5 100 1275 24225

TOTAL (RM) 64030


PAINTING
FULL AREA: 5631

LOCATION AREA % PAINTNG COAT. SQNC. SUM AMOUNT

T/S 820 100 3 2460 984


V/S 1275 100 4 5100 2040
F/B 3536 100 4 14144 5657.6

TOTAL (RM)
AMOUNT (HPS ONLY)

5904
12240
33945.6

8681.6
FULL AREA (m2): 5631
HPW & HOSE
7883.4
DOWN (RM)
BLASTING (RM) 64030
PAINTING (RM) 8681.6

TOTAL (RM)=
RM)=
80,595.00
HPW 1
HOSE DOWN 0.4
P/TOOL 12
SAND DOWN 3

SA 1 6
SA 2 16
SA 2.5 19

T/U EPOXY 0.4


F/C EPOXY 0.45
A/F 6
HPS 2.4