SCOPE:

1. Installation of 1 DCDB with circuit breakers (100A,


2x80A, 2x63A, 1x32A, 1x25A)
2. Installation of 10m 70mm sq DC cable (blue&black)
3. Installation of 4pcs Rectifier modules
4. Installation of 3pcs 12V/170AH batteries

Revision Revision Description Date

01 Submission for Review Jan. 2017

Prepared By Signature Date

BARAKA MARO 31.01.2017


Checked By Signature Date

WOLE ONTIRI 30.01.2017


Approved By Signature Date
30.01.2017
FEMA - HTT

Scale 1:50

Drawing Title

ELECTRICAL DIAGRAM
Project ID T-TG-000
Project Name TIGO COLLOCATION
Site ID DAR000
Site Name AAAAA
Coordinates 0.000 S 0.000 E
Drawing No.

HTT-TSS/ASB-DAR000-004