You are on page 1of 1

Load Table of SCC4000(C) Auxiliary Hook—Main Boom+Luffing Jib (LJ) kg(lb)×1000

Central ballast: 40,000kg ( 88,200lb) Main boom length 36m(118'1") Main Boom angle 67°~ 87°

Jib m(ft) 51 (167'4")


Main Boom angle 87° 77° 67°
Counterweight 135,000 155,000 135,000 155,000 135,000 155,000
kg (lb) Radius
m(ft) (297,700) (341,700) (297,700) (341,700) (297,700) (341,700)

24 35 35
(78'9") (77.2) (77.2)
26 35 35
(85'4") (77.2) (77.2)
28 35 35
(91'10") (77.2) (77.2)
30 35 35
(98'5") (77.2) (77.2)
32 35 35
(104'12") (77.2) (77.2)
34 35 35 26 29
(111'7") (77.2) (77.2) (57.3) (63.9)
36 35 35 24.5 28
(118'1") (77.2) (77.2) (54) (61.7)
38 33 35 23 26
(124'8") (72.8) (77.2) (50.7) (57.3)
40 31.5 35 21.5 24.5
(131'3") (69.4) (77.2) (47.4) (54)
44 27.5 31.5 19 21.5
(144'4") (60.6) (69.4) (41.9) (47.4)
48 24.2 28 17 19
(157'6") (53.4) (61.7) (37.5) (41.9)
52 21.5 24.5 15.5 17 14.5 17
(170'7") (47.4) (54) (34.2) (37.5) (32) (37.5)
56 13.8 15 12.8 15
(183'9") (30.4) (33.1) (28.2) (33.1)
60 11.2 13.2
(196'10") (24.7) (29.1)

wind speed 11.1

m/s(mph) (24.8)

10 of 56 LJ Operating Condition

You might also like