Relocate Jazan-Abha Refined Products Pipeline — HD AA Bl# 10-00875 Contract# 6600045122 PAYWELDER DAILY INSPECTION CHECKLIST d/ Equipment No; __ GB 2. — Date Ol=12-).r0, - Location SE — Voy = INSPECTION AREA sat_| sun | won | rue [| weo | tu | err Ok|NO|OKTNOTOK[NO[OK NO] Ok|NO[OKTNOTOKTNO| 1_|Under Frame/chassis ia 2 [Engine Concition [= 3 Engine OF Level = 4 [Transmission & final Drive Condition S 5_ [Transmission 01 Level 8 [Breaks & Ciutches 2 7 |steering System CNP) 8_[tiya. System Condition PTO Z| 9 [ya oi Level 10 |Cab/ConiroistGauges/Seat = 11 [Sheaves and Pins 12 [Emergency Stop System wal 13 [Coolant Level a 14 [Fire Extinguisher 15 [Hoist Conon/counter weights 16 [Wire Rone Condition (wl | 17 [Hook a Z| 18 [Backing Alarm v Ba 18 JO leaks (engine) a 20 [Raciator (water leaks) 21 ler 22 TWetding Cable Conditions 23 |Earth Bonding Connections eal 24 [Signature Comments (List al deficiencies here and describe the crrecive action akan) -Qoeretor wil complete shove inspection of his equipment every morning belo the Sat ote Job. -Form is keop with the operator requirements uni the end ofthe working da Department will keep a consolidated record ofall checklist. Operator Signature: Electrician Supervisor/Foreman: = Verified By: Safety Officer HN * JAPL-F-HE-006 ar SICIM Saudi Arabia =—SILCIIM YAZAN - ABHA REFIND PRODUCTS PIPELINE PROJECT ogesou TW _S==S==H! Bii# 10-00875 Contract# 6600045122 ‘Saudi Aramco HEAVY EQUIPMENT ONBOARDING CHECKLIST EQUIPMENT TYPE/MODEL/MANUFACTURER TeRaeid.9 ( woe ) SUE/PLATEH ea, # ‘CRITERIA YN REMARKS 1 EQUIPMENT HAVING VALID 3° PARTY INSPECTION STICKER AS PER GI 7.030 2 PWAS - INSTALLED AND FUNCTIONING NO DAMAGE ON GLASS AS PER CSM: 2,3,14 Ea NO CURTAINS OBSRUCTING WINDOWS AS PER CSM: 2,3,14 Ez 5 REAR CAMERAS FITTED AS PER ‘SCHEDULE B, ATTACHMENT, EXHIBIT Ii i 6 | OPERATOR IS CERTIFIED BY SAUDI ARAMCO/SPSP HAVING ORIGINAL CERTIFICATE IN POSSESSION zl Ne operatof Dai 7 _| POSITIVE DIS-ENGAGEMENT PRESENT AND FUNCTIONAL 8 EQUIPMENT HAS A DAILY INSPECTION CHECKLIST IN PLACE 9 | OPERATOR SAFETY INDUCTION IS COMPLETED = a 10_| EQUIPMENT MANUFACTURER/MODEL & OPERATOR CERTIFICATION IS MATCHING rm 11_| EQUIPMENT IS FREE OF LEAKS: 22 _| ALL WARNING DEVICES FUNCTION AS DESIGN FOR E.G. BEACON LIGHTS, PWAS, ALARMS as 13 | FIRE EXTINGUSHER FM/UL AVAILABLE WITH INSPECTION UPDATED 14 | OPERATOR RECEIVED SITE ‘SPECIFIC TRAININGS INCLUDING THE COMPLETION OF DAILY INSPECTION CHECKLIST ie 15_| OPERATOR HAS COMPLETE THE REQUIRED QYADATI TRAINING eS ‘CHECKLIST FILLED BY (HSE) aME/SuRNAME: Tose os\ LAr ol- 1-20 DATE & SIGNATURE: JAPL-F-HE-029 ISSUE NO. 1

You might also like