You are on page 1of 1

GENERAL NOTES

1. FOR GENERAL NOTE, SYMBOLS, AND PIPING DETAIL


SEE P&ID NUMBERS 26071-100-M6-000-00001 THROUGH
26071-100-M6-000-00065

NOTES

HOLD LIST

REFERENCE DRAWINGS
NO DRAWING TITLE
PIPING AND INSTRUMENT DIAGRAM PLANTS-4/5/6/7
05-DA-12 REV 7
PROCESS LINK UP DIAGRAM

00A 29 NOV 19 ISSUED FOR REVIEW VF/RY/NF/THH HH/IP/J.H.KIM C.J.LEE/Y.D KIM

REV DATE DESCRIPTION DRAWN CHK'D APP'D

THIS DRAWING EMBODIES PROPRIETARY INFORMATION OF PT PERTAMINA (PERSERO) THIS DRAWING OR THE MATERIAL
DESCRIBED THEREON MAY NOT BE COPIED OR DISCLOSED IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR
OTHER THAN THE PURPOSE FOR IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR OTHER THAN THE PURPOSE
FOR WHICH IT HAS BEEN PROVIDED, IN WHOLE OR IN PART IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED
BY PT PERTAMINA (PERSERO).

PROJECT :

RDMP RU V BALIKPAPAN
CONTRACTOR :

RDMP BALIKPAPAN JO
OWNER :
PT PERTAMINA
PERTAMINA BALIKPAPAN, INDONESIA
TITLE :
PIPING AND INSTRUMENT DIAGRAM
PLANTS-4/5/6/7
PROCESS LINK UP DIAGRAM
PERTAMINA DRAWING NO. REV.
NONE 26071 26071-203-M6-000-01009 1 OF 1
00A
SCALE JOB NO. DOCUMENT NO. SHT NO.

You might also like