SECTION-2

CONSTRUCTION 5 TEPS INVOLVED IN BUILDING CONSTRUCTIONS

2. 1Site clearance.

2. 2Surverng and layout

2. 3Excavotion.

2. 48or binding and positioning of foundation steeL

2. SConcreting.

2. 6.711 construction.

2. 7Beam and Columns.

2. 8Finishing and whitewashing.

j. 151TE CLEARANCE

A no of conditions determine the kind of building that may be erected on a plot of

ground. These conditions determine where on the p.t moy be located. There

are also convenants that are legally binding regulations. These may be setting

height of budding prohibit utility of buildings or ban rooftop network towers etc.

Zoning laws regulate the setbock and other factors that play into equation of

house location a lot. Septic tan. also require specith considerations and a

certificate of occupancy is also required for some loaning and legal processes.

2. 2SURVEYING AND LAYOUT


Survey's the first step done many construction site so as to get the reQuired Ie.
of surface. It is also used in level transferrin dunng construction of retaining wall.