METHODOLOGY:

Step 1: Rollers in Neutral Position Step 3: Plate end Pinching after bed shifting to left side
(Pre Pinching)

Step 2: Feeding of Steel Plate Step 4: Plate Rolling

Step 5: Plate rolling Step 7: Remove Pipe after tack welding

Step 6: Other End Pinching after bed shifting to right side Step 8: Reroll after welding of Long Seam joint and apply
(Pre-Pinching) pressure on straight portion of shell by shifting the bed
in both transverse directions(Post Pinching)