® S ATRAC ENGINEERING PVT LTD BANGALORE ~ 562 132 SUB: Grit Blasting Inspection Report as per PS 750 Ref: SFNO: 28590 ~— Mca 1. Surface cleaning with pressurized air, followed by 3 in 1 solution before grit blast Operation..(To remove oil, grease, dust foreign deposits) 2. Observation after grit blast: Clean & White surface observe and found satisfactory INSPECTED BY DATE: PAINTING INSPECTION REPORT F496 SF no: JA590 Date: G/o[2o27 Type of vehicle? Wall wide Ped — cer, t SL.NO. De ription Observation Remarks Seer Method of inspection ISURFACE PREPARATION IS 8901/BS 7079-0 [Sharp edges removal Visual on. aA |Weld spatter removal Visual Grit blasting 2S #50 Visual Checkodbot_ Jair cleaning Visual alw [Cleaning of Surface Visual aN Zinc spray PS — $49 1 Zinc Spary(90 - 100y) Coat meter 99-964 Primer Coating ISO 2074 i 1 Primer 2 Coats Visual dw 2 _|DFT(130- 140) Coat meter 135 -14oy Putty/Metal Paste Putty & Sandring Visual olY ol Air cleaning Visual IG ISO 2932 Painting (Finishing 2 Coats) Visual ay Viscosity (25 to 30 Seconds) Ba Cup Sofa DF T(180~- 2004) coat meter | 185-2044 Cha teed fauodla t Paint Coverage(Hidden areas) Visual Ol Adhesive Test astm 3359 | Chic lee ok] lAsthetic Visual SATIQAIFISO Ore aiBeoor Rho eae ey Gp 4 | & Niet . ee Ss ATTRAC ENGINEERING PVT LTD BANGALORE ~ 562 132 SUB: Zinc spray as per PS739 Ref:SFNO: 22550 -McCTp 1. Surface cleaning with pressurized air, followed by 3 in 1 solution . 2. Zinc wire used 99.95%, purity , Dia 3.15 used as per IS 209-1992. 3. Thickness measured at 10 locations as follows Locations Areas Observation ik et ES 03 Fink pletfelnn Jopore | GF, 94,95, 96 92 04 | Roar plaliern foparec. a3 94 96 at a 05 > Boas Tnonth LHSdel | 06 [wha PoammGenas Busi ab QC, 98, 9% on | q. o7 {taal ontd Brae Fs 92,94 92 23 9a: So 10 |Voust 09 es wa iit INSPECTED BY : ea -\ DATE:

You might also like