BACKGROUND
Creating a
Methodology"412 CREATING A METHODOLOGY
‘ORITICAL ISSUES.
n of a project management
into conduct a moming thre
project management and the value af an
‘ology (EPM). As par ofthe session, the com
to develop ancl implement an BPM system can be
project management office (PMO) in place to take the lead role. The consultant
also explained that whichever executive gets control of the PMO may become
cexcontives because he or of the
project management intellecwal property. The execs
implication of this and therefore became relucte
rmonagement nati they c
me, project management suffer
red reporting £0
hopefully take the lead in
cluded that thece were five
were done, th
‘been accomplished, The final briefing would be
‘updates and progress reports, The PMO believed
ani sign-off in timely manner would be difficult
‘The first slep that needed! to be done was the es
life-cycle phases. Some people interviewed wanted ten to twelve
‘meant that there wonld be ten to twelve gate review meetings and
‘managers wold spend a great deal of time preparing paperwork
roject. The
the monthly
getting executive support
then matte fo have no more
The s
round
De designed
id policies and procedures or go the more informal route of using
forms, guidelines, checklists, and templates. The PMO felt that project managers
needed some degree of freedom in dealing with clients and therefore the more
informal approach would work best. Also, clients were asking to have the
methodology designed around the
approach would provide the flex
“The thied step was to see what conld be salvaged from the ex
and checklists, The company had & few templates and cheeMlists bat
project managers used them, The decision was made to develop ast
ff documents in aocordance with the information in the PMBOK" Guide. The
project managers could then select whatever forms, guidelines, templates, and
checklists were appropriate for a particular project and client
Questions as
‘The fourth step would be to develop a means fr capuing het practices
sing the EPM system. Cents were now ing in ice RET ha bes oe
tit ona proj ted and shared with th let pic to the ese
ont ofthe poet Mat fhe poplin te MO ballet sculls tns
sing forms or checks athe final poet deufing nto
‘he Ath Hep involved Crining. Te projet managers and
tha would sn the projects would nee to
the we ofthe new methodcogy The PMO batieved that ton
gram would siice andthe fonct
QUESTIONS
1. What ean you determine about
waited this long to cor
Can a PMO secelerate the
he fact that they
the development of an EPM system?
1ses in an EPM system’?
is design an EPM system around flexible or inflexible elements?
Generally, wh EPM system, do companies prefer to use
sign?
{6 Should an EPM system have the capability of capharing best ‘prectices?