You are on page 1of 6
REPUBLIC OF THE PHILIPPINES DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REGION II BATAAN 1ST DISTRICT ENGINEERING OFFICE OFFICE OF THE DISTRICT ENGINEER ROMAN EXPRESSWAY, MULAWIN ORANI, BATAAN C.Y 2020 PROJECT DETAILED ENGINEERING DESIGN PLAN FOR FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF FLOOD CONTROL PROJECT IN DALAO RIVER DINALUPIHAN, BATAAN LOCATION : DINALUPIHAN, BATAAN STATION LIMITS : LEFT SIDE- STA. 0+000 - STA. 0+096; RIGHT SIDE- STA. 0+008 - STA. 0+275.20 NET LENGTH : LEFT SIDE- 96.00 L.M. RIGHT SIDE- 267.20 L.M. TOTAL LENGTH 363.20 L.M. CY 2020 PROJECT DETAILED ENGINEERING DESIGN PLAN FOR FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF FLOOD CONTROL PROJECT IN DALAO RIVER DINALUPIHAN, BATAAN LOCATION, DINALUPIHAN, BATAAN STATION LIMITS : LEFT SIDE- STA. 0+000 - STA. 0+096; RIGHT SIDE- STA. 0+008 - STA, 0275.20 NETLENGTH : LEFT SIDE- 96,00 LM, RIGHT SIDE- 267.20 LM. |rmonsr mie uaa nomior ea LOCATION PLAN ‘SUMMARY OF QUANTITIES GENERAL NOTES TEN NO, DESCRIPTION NT ‘QUANTITY REMARKS PARTA FACILITIES FOR THE ENGINEER erry PROWSION OF suo GPFCE FOR Tee ENGRESTO RENTAC HB KH m0) PARTE. [OTHER GENERAL REQUIREWENTS Bre PARTI FLOOD CONTROL AND DRAINAGE en) eH eH UNL CAVATION ONBUTABE STRUCTURE EXCAVATION COMMON SL) oa aie RENFORGING STEEL, GRE “ean STRUTUPA CONGRETE GAGS (ECR NON TH ara) aa ara DI ESIGN CRITERIA: ran DeSN GUDECNES CATER AND STANDARDS 2015 DESIGN SPECIFICATIONS: Alaina nar On Gales, Cats Sens, VOUME 3 WATER EMINEM ROIS 205 A AL ONEAIONS, LETIONS AO OITRICE ARE ML ETES UNLESS OTHERS EMBANIOAENT: EET STEEL OTs > TREE ira eee at emo ERR eer a ma mare SESE res merece TSS DEER aaven ae Gaon ermatetiaes ieee nem amen oary iahaseunomeummmanar Bo ae a gar ae tees Ew yon Sarre at wae aca we a a ee EESPIP Ser maemo ea ee, Fidei sano si A eSUOTED AT ee PLONE MA owt on Sta Be Sc en 7 cnCREE STAC ADL inaurivenaion saat (ns) okce 2, ERENT VOTH STAI ence Hanes TOG Ue FOR © SLOPE PROTECTINANO PLEO SIAL Macey a Sa ave vn nae Conroe sso Se = {vores ome INDIVIDUAL REMOVAL OF TREES SCHEDULE ma TER Aarons ov] FUR) Sexo tom CLEARING AND GRUBBING TYBICAL SECTION... ae ‘spe eevaron sa) STAIR DETAIL FRONT ELEVATION SHOWING WEEPHOLES END AND INTERMEDIATE PROTECTION DETAIL

You might also like