Professional Documents
Culture Documents
GSSSB Technical Instructor Paper
GSSSB Technical Instructor Paper
50% of the first line, 50% of the second line and 20% of the third line 95 udev was a mao Raed wa guid ade all Ara url Breed Al aud. (A) Slat ae wwe ) arreie (©) eer wg (D) We mr. slFar 1BE-74_B | Scanned by CamScanner 20 [ Contd... \-eo/ The PUTPOSE OF & Choke in a gy gant HP is Wore (A) To decrease the Current (B) To increase the current (C) To decrease the vottage momental¥ PI To increase the voltage momentatilY < i i I relay to render the ot 30°, 60° and 90° connections are made in @ directional relay relay (A) Sufficient torque under fault conditions (B) Zero torque under fault conditions (©) Current grading 0) Time grading aac vel DA AM add, (A) aud - wad Aad B) wWasUt - SVU ©) En - agey (D) risa - 2a \95The maximum effigiency of a distribution transformer is (Aat no lead “B) at 50% full load OD) at 80% full toad ©) at fall load Give Synonym : Rhetoric (A) Grandiloquence @) Interesting talk (C) Magnificent ©) Quiet IBE-74_B | bd Scanned by CamScanneraf Ifthe back emf and pies of DE Motor are doubied, the torque developed je back € : hy the motor J) (B) will reduce to one foul (C) will increase four folds. ie will be doubled. @) Tene sready state stability of the Power sysiem can eo weil remain unchanged ; ith value, (A) using machines of high impedance. o (B) connecting transmission lines in series. {£) connecting tines in pavallel yy ,{D} reducing the excitation of tl SAMML SAI OAL’ AE wera AS ay oo all ASR A Maras siatll 46 (A) 1S (B) 158(2) (C)_, 1586 (DP) 157(7) * ype of backup protection scheme widely used in the field is ) Relay backup (8) Breaker backup We) Remote backup (D) Auxiliary backup I G ame afl agdle UA Hell am acon $8 Bei Mata ef 2 (A) 8a. 1961 BY S24. 1962 (C) B.A. 1963 (D) 8a. 1904 ( Scanned by CamScannerys The bridge used fo Measur em (A) Wier's bridge Sen ot capacitance is ° (p) Wheatstone bridge hh A €) Schering bridge o Hay's bridge (497 In short circuit calculations, the gejected base KVA is equal to (A) That of the largest plant (B) The total plant capacity (C) Any arbitrary value (Dy Can be any one of (A), (B), (C) (Los HS Office Wei sat aud aad ad ? (A) MS Word (B) MS Excel (C)_ MS PowerPoint, py mila at {097 At t= 0+ with zerolinitial condition, which of the following acts as a short circuit, (A) inductor (B) Resistor {© Capacitor (D) Current source 10 AB. cadae. DAET oS 8. E, Bel R518. a, D wig aed wad? (B) Maus (A) ade wih arf (C) ole ” ne Scanned by CamScannermaterial ha, . 1 Two fase wires of the 54° Ve fusing currents of 10 A and 5 A. The 10 A fuse will have (A) Smaller diameter WF Larger diameter (C) Same diameter as the 5 (D) Fusing current does not 4€PENd on the diameter A fuse \ 11 order to reduce the voltage S¥"8es due to current chopping afd capacitive current breaking, we connect (A) A resistor across the CB contacts, (BY A capacitor across the CB contacts, (C) An inductor across the CB contacts, (D) A switch across the CB contacts, A “ast Us UA” sdaael RAK sad vend. (A) MRL HRY ARS > oygudn fd B) acd gr doon2d % 523 © awe oe aa ©) was NUR ctieig Ce Bali i ient pole type Totors are generally used with prime movers of (A) High speed IS Low speed (C) Low and high Speed (D) Medium speed us Give the Verb form f : Dan, ger (A) Di eee (B) Dangerously (©) Endanger eee Scanned by CamScannerhl ise 8, me vag, (A) The motor yin yy ae umn, BF The motor wit aa Tun ay (©) The motor witt rp all a 2 very glow speed: @) The motor will run yg ‘ Very high Spee D.C. generators are i are Installed near the Joad centers to reduce (A) Iron losses ” BY Line losses (©) Sparking (D) Coronal68ses sa AWE WA Syst siRisrd anda AA YB we weed. (A) ARSE LOR () aia wha (© Bea se (DywARadat war \ U9 The effect of ineredse ofitemperature on overhead lines is to (A) Decrease, the)length but 0 increase the stress. \fimDecrease the stress but 1° increase the length. stress and length. nd length (C)’ Decrease the (D) Increase the stress si ga we HBT 120 2A aura weviiel ist! B) asdl @ a @) sisdl (©) waders id [ Contd... IRP14 D1 Searel by CamScanner = a :Sa a of the lightning arrester is near the (A) Generator OT ‘Transformer (D) Circuit breaker (© Bus-bar Wer ‘the cable length increases, its insulation resistance e WA) _ Decreases (B) Remains constant ‘\ (C)_ Increases (D) Becomes zero @ Vs aseal2 Alga YRUd UPAAL HAL Breet adad ~ (A) weet F > SHO) ABUL Oo \ Dy For protection of a large sqt luction motor against single phasing, normally (A) An over is used (B) A diff is we © ctf@hal relay is used egative sequence current sensitive relay is used year da eal Ma gg gy Ded Farr 8 ? 4 adASsw day @y Masada WR m pba ere 1BE-74_B | Scanned by CamScannerAn idea! voy Mave soy, Has te (A) Has termingy Volt B) Has te : (B) Has terminal Volta " rapaeton 10 current IY Has zero j | (ON 2020 intemg,. Ppo ion 10 (D) Has open cireyi, tee Cuil Yo We nearly equal 10 the voltage at full load 12] Fhe are VOlAKE in gig, cuit (Th Phase With the agg, rent (B) Leading the are Current py y 99° (©) Lagging the arc Current by 99° (D) Leading the are curren by 180° breaker is (os)-12-u aussie ld Re werd aru Damid wolone yal eeu of wel dad] Ranged 2 8. (A) gall yay aie By Wel aygy BAR (C) YL cease BAe (D) wrath deygy BA \U29The statutory limitlfor voltage variation at the cousumers termina! is HAT 4.6% Of the’ declared voltage (By) 229% (6F the declared voltage (©) 10% of the declared voltage (D) 4% of the declared voliee conjunction a proper He worked hard. He failed failed (A) He worked hard 8° he Ks hat’ \(Be-ffe failed but he we he failed (C) Though he works! ei nd (D) He worked hard * ” 1 Contd... Scanned by CamScanner | 1130_4oin the sentences withvoll@BE that a PPears across the circuit breaker ney jncti 1Z1 The normal freqve ex is cae the ae contacts after the fit! a (A) Supply voltage ) Restriking voltage ©) Breaki - tage reaking voltage \O Recovery vol IY Used in cei; at The single phase motor genetllY Used in ceiling fans is (A) Capacitor start tyP® (B) Split phase type Of Capacitor start and rua WPS (D) Permanent capacitor type eT aufls aleovri vider Bear gael 44 rudd Baad Ese AM Re-2 sSell Deu ani 8 7 (A) 3. Lavell ay (B) 98. 1 4 50 wml ay (©) a. Lat 20 ema ay | (D) 2. 1am 80 wmedl ay ie US# For increase inthe lneyolage, which ofthe following does not take place ? (A) Increaselin span, @)y Imoreasehin conductor sing SG), Increase in the tower height AD) Increase in clearance from the ground Bt fl aude awed Brau ave pagevill wale a: gle (A) abd @) Rowse © ad oO IBE-74_B J [ Contd... 28 Scanned by CamScanner\ 136 Funting takes place in a 3 syn (A) Supply voltage uct \chrongys motor When the G Reve tele ce ee ‘or is unity, (p) Motor is under loaded (Which of the following isthe essenil sequirement of peak load plant ? (A) It should run at high speed (B) It should produce high vokage (C) It should be small in size DY It should be capable of stating quickly Ce Radel eu wi Rud 82 (1) Breet aebet UPR Vai aimed at salad Oy 2) Rreat aise UHRA wr Bsr Rreciely Bsa Deed yaad Asaad da 8. G3) Race anbert ARAr awe daddy Rs Neel wR Rardl dvd. ‘ (4) Brcett aivedest APRA Mesa est Gear sed aid walaree] Bet Ad a saq a eunillaard Br By Guaaiel 24 Ratt weed ? ) @), @) 8) @),@ © @G@) ‘ @) (1), G) \_ 139 €reeping in @nergy meters can be prevented by providing (A). One hole on the disc Br Two holes on opposite sides of the disc. (C) Extra voltage coil in the meter. (D) Extra current coil in the meter «140 DICTIONARY avert] 1234256789 dat MA, dL ORDINARY avvertl dat 6S aA? \wy-sei26789 (A) 59126789 (©) 57326789 (D) 56126789 1BE-74_B | P { Contd... Scanned by CamScannering i Proy nin Per sy A FF two alternators 4 we Nchronism and the voltage of one 14If two al 3 ae ea suddenly ine machine i i so? ines © A) Both machines 2 1) stoP ¢ will (B) One machin ; y comtiMUe to run as it jg (C) Both machines wil will Be pro _ A) Synchronizing torque Produced to restore further synchronism oe tection ji LUM Which of the following proteenon 's normally not provided on \small . distribution transforme’s ©) Directional proftction (A). Overftuxing protetion D> Buchholzsflay (C) Over current protection LIS woeays AB As ave wd. UM Red BI (A) 34 (BY! RW C) wae (D) da IH Wich ofthe ftoing\arleter can be neglected fora short transmission lhe, ? (A) Resistance By Capacitance (C)y, Induetance (D) Reactance of Change the degree Sleep is not less Necessary than food n (A) Sleep is at least as neceseary 8 food. (B) Sleep is more Decessary than 00d a (©) Food is tes. * Necessary ag sleep (D) None ene mt RI Scanned by CamScanner146-Scott connections are used 1, © Cony, ‘ert (A) Three phase suppl PPIY 10 DC. supply BY Three phase supply to two hase su90l! (©) Three phase supply to four phase supP!Y (D) Three phase supply to single phase suPPY 147 _In an Inverse Definite Minimum Time (DMT) type cover current 1 relay, the’ minimum time feature is achieved because of : {Aj Saturation of the magnetic circuit (B) Proper mechanical design x ™ (©) Appropriate time delay element (D) Electro magnetic damping (LEE Rall BHAT AER, Alt, Auetanbaare, eioarzal, sreaulradiet a shes Guaia eu tad aalaaiar d ? (A) aPsBacttst By Use (©) GsARRin @) waka \-A4F_Lin@which connects the consumer to the distributor is called the : (A) Feeder (B) Distributor Service mains (D) Earth wire: \1s-Sifeeuae a aller 52) Bag DEB ? (A) Sdatde - 2 B) deat oe - argey (©) saul - vissiar ©) “staid - yaaeal mr pt 31 Scanned by CamScanner a