You are on page 1of 4
‘9372020 beta. SAM. gov An offiial website ofthe United States government Here's how you now Authoritative site for Assistance Listings, Wage Determinations, ond Contract Opportunites only JSAMGov = # mm ae Follow Us Army Cops Construction Services for Jetty fE : j aha ae and Wing Wall Repairs in eae Kennebunk and cenertinormaton Kennebunkport, Maine Classification Description Oactve Contract Opportunity Attachments/Links Notice ID Contact information We12WJ20X0025) History Related Notice ® What you think Department/ind. Agency matters! DEPT OF DEFENSE Sub-tier DEPT OF THE ARMY Provide Feedback Major Command USACE Sub Command NAD Office W2SD ENDIST NEW ENGLAND General Information hitpsibeta.sam.govlopp2d¥eb3 165244202a84dabb226121677 view *keywords=seaualls8sort=-relevanceBindex=8is_actve=ttvekpago=4 48 errg72020 beta SAM gov Contract Opportunity Type: Sources Sought (Original) All Dates/Times are: (UTC-04:00) EASTERN STANDARD TIME, NEW YORK, USA Original Published Date: Aug 14, 2020 03:59 pm EDT Original Response Date: Sep 08, 2020 04:00 pm EDT. Ina /e Policy: Manual Original Inactive Date: Oct 08, 2020 Initiative: © None Classification Original Set Aside: Total Small Business Set-Aside (FAR 19.5) Product Service Code: Y1QA - CONSTRUCTION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE) NAICS Code: 237990 - Other Heavy and Civil Engineering Construction Place of Performance: Kennebunk , ME USA Description The U.S. Army Corps of Engineers, New England District is issuing a Sources Sought Announcement for repairs to jetties and wing walls located at the Kennebunk River Federal Navigation Project (FNP) in Kennebunk and Kennebunkport, ME. This announcement is to determine the interest, availability and capability of HUBZone, Service-Disabled Veteran-Owned, Woman-Owned and Small Business concerns as described below. The NAICS code for this procurement is 237990 with a size standard of $39.5M. The project is planned to be issued around March 2021. The construction will occur between summer 2021 and spring 2022 and is expected to take approximately seven months to complete. The estimated construction cost is between $1,000,000.00 and $5,000,000. The Kennebunk River FNP includes a 600-foot long stone jetty on the eastern side of the inlet with a 240-foot long stone wing wall connecting the jetty with the eastern shore in Kennebunkport adjacent to Colony Beach, and a 290-foot long ‘nips:fvota sam govioppi82d90b3 165344202a84dabb226121677!viow kaywords=seawalleBsor=rolevancebindex=8ls_active=tuespagess 91372020 beta SAMgov stone jetty on the western side of the channel with a 270-foot long stone wing wall connecting the jetty with the western shore in Kennebunk adjacent to Gooch’s Beach. The proposed work consists of repairing the east and west jetties and wing walls of the Kennebunk River FNP, which were damaged during recent storms. For the east and west jetties, the work includes dismantling, removing, stockpiling, reworking and reinstalling existing armor stone as well as acquiring and installing approximately 3,400 tons of new 7-11 ton armor stone in the jetty repair areas. The seaward noses of each jetty will be rebuilt with both new armor stone and existing/d displaced stone located along the structures to repair damaged sections along the jetties including restoration of top elevation, width and slopes. Additional stone will also be placed along the eastern face of the east jetty where it meets the beach to protect a 50-foot long area where the retreating. beach has exposed the older inner core stone. Repairs will require substantial moving and rehandling of existing stones to obtain the required interlocking placement and construction tolerances. At the east and west stone wing walls, the fitted stone structures will be dismantled and existing stones stockpiled, reset, and grouting and pinning applied where needed. Adjacent to the east wing wall, the parking lot side of the wall will then be backfilled, compacted and leveled, A total of 3,400 Tons of new armor stone will be placed for the project and about 400 Tons to be reset and/or reused. The work in these areas will require significant coordination around the tide cycles. The tide range between Mean High Water (MHHW) and mean low water (MLW) is about 9.6 feet Given the nature and characteristics of the east and west jetty structures, itis, anticipated that all repair and improvement construction activities will have to be performed from marine based plant. For the east and west wing walls, itis anticipated that construction will be performed by land. Environmental coordination and permitting is being completed by the U.S. Army of Engineers, New England District. Interested firms should submit a capabilities package to include the following: business classification (i.e. HUBZone, etc.), type of equipment the firm is proposing to use on the project, as well as demonstrating qualification and experience with at least two (2) projects performed by the firm in the last six (6) years (including Points of Contact for those projects) involving construction/repair of similar massive stone structures, such as seawalls, rubble mound breakwaters, and jetties, from marine plant, and working with the tides for land based work. Responses should include experience of Foreman and Crane -ntps:foeta sam govlopp/92690b3165344202884dabb226121677Wviow ?kayworss=seawals&sort=-olovancesindex=Bis,_active=tuespage=s ‘312020 beta SAM.g0¥ Operators working on massive stone structures from marine plant. Please indicate the team subcontractor(s) (if any), including their prior experience and qualifications meeting the same qualifications listed above, which will be used to support the offeror’s effort. Firms may use subcontractor experience to demonstrate experience with the requirements, but the role and work performed by each team member (prime and subcontractors) on projects demonstrating that team member's experience shall be the same as the role for that team member for this project. Proof of bonding is required to be submitted. Responses are limited to twenty pages and due electronically, by September 8, 2020, to Guesley.Leger@usace,army.mil. The Government will not pay for any material provided in response to this market survey nor return the data provided. This notice is for information purposes only and is not a request to be placed on a solicitation mailing list nor is it a Request for Proposal (RFP) or an announcement ofa solicitation. The results of this survey will be considered to be in effect for a period of one year from the date of this notice. Government Agency URL: www.nae.usace.arm Government Agency URL Description: New England District, Corps of Engineers Attachments/Links Expownioad Ail Attachments/Link No attachments or links have been added to this opportunity. Contact Information Contracting Office Address KO CONTRACTING DIVISION 696 VIRGINIA ROAD CONCORD , MA 01742-2751 USA Primary Point of Contact hitps:beta sam govloppr92d9eb3165344202a8.4dabb226121877 iow theyworde=soawalls&sort=elovancebindex=dis_actve=tuaspage=t 45

You might also like