You are on page 1of 1
PART-B cor Bich ECT aye Qt. watt short a ip ie questions. 12%2=24 rpfblleLcenan system, LZ POE, peeled utbeaK unter ! tenths & hi ih ealbant — (8) 2 ae oi PEATE (1) ee Phsttys (3) 1 a whale earasitases ete i ace of 4. How a protective rely work Viigo daira BULLE, hated PELL ALFA apatite al fenieHi, sgl Lge tAletiitorm Se APE Ebel obit abn il 5. Whats earth electrode. etna Wed Bie siete Bilin eSih/ Pelistinsd lon i 6, List the tool for estimating. betel? The Tally (3) Tap Measure (2) Map Measure (1) ae Drawing Board & instruments (6) Side tule (5) Architects Scale (4) Pencils and crayons (8) Clamps (7) Megetargen Teh srt (10) Cleaning Liquids (9) 7. Define lsolator, wetayeet af ILD baa Mecltt Fembnde Hie atobiSte.tH bul feel ety aiden tele 8 me. hahahah Aligarh leis Sphiutnute cy figfewiyl tify! ‘ua elt wt Tpeiiusprea ing dep Sted) 8 * 4. White method of polar test by megger. thicket nh crwe iP areralcniiudiqre Me tuedbayte Ahir wet Luscud. syrphotibeoral is triey ip rite Liars ; 40. What is IEE Rule 0-14? oc tf IEE RULE 044 Peep eBAl pM Saab ute Wilt wirtdo™ bald alt aftr rive whut Wigs i dubia Lire 11, What is meant by E,L and N of a 3-pin socket. of eNal, BAAS Wa Oa a ed Shed Le Ape vcpok ilk 42. Write the use of sprinklers. ath; oe Lb, yoB Bee shi d tind siaeneabciter > I tlt tobe sdwrndpwagibicmnts 13 Define depen ft, wit oul Bi ichibee ec WAP de duns sinso Wisk ipl 44, Write name Y bis wtih yeh fi ‘eee pa Oo flee Ww ve 45, ching ple (Behe dehedyacratoyper/ finite) eSpace eh call jae: eis ty ah Zone /proibael 16, Define earthing Rule 87 S). GS mee si Load pViaka rt 47, Define labour anne wi Bi biaeity. ah wdihionhcAehdl ins 9 condition) eich = (2 (TypeotProject) offer” (1) (LabourMarkel) Waluny (3) 48, What are lighting arester. ie ips Lika hesific-nli-h Atyes bul ind dr YoeVaiyra, Re! Titi, fg Lie shi Nedie beat eyo Lula We asta SECTION - Il Note: : Attempt any TWO Questions. 28216 Q.2 How many types of fire alarm. Explain any one fire alarm with circult diagram, aploinfuitidis oh han cholerae Q3 Define step up and step down transformer and how many equipment installed for substation and describe. athianl ver pbestLniabr tee asl aArttlgd byl? (24 Wit necensary stops or preparing cot estimating ofan electrical instalation AAR by PEAK AVIA

You might also like