Ejercicios tipo J del PDF

1) Given the following profile variables, choose the correct answer below after calculating
the maximum hold angle for a build and hold directional well.
Target Displacement = 2500 ft
Target TVD = 10500 ft
Build Up Rate = 3° per 100 ft
Kickoff Point = 6925 ft

Select the correct answer.


a) 120.91°

b) 136°34’

c) 41.18°

d) 26.72°

2) Given the following profile variables, choose the correct answer below after calculating the
end of build TVD for a build and hold directional well:

Target Displacement = 2,500 ft

Target TVD = 10,500 ft

Build Up Rate = 3o per 100 ft

Kickoff Point = 6,925 ft

Maximum Hold Angle = 41.18o


Select the correct answer.

a) 8,297.67 ft

b) 6,783.4 ft

c) 472.41 ft

d) 8,182.5 ft

3) Given the following profile variables, choose the correct answer below after calculating the
end of build (EOB) displacement for a build and hold directional well:

Target TVD = 10500 ft

Build Up Rate = 3° per 100 ft

Kickoff Point = 6925 ft

Maximum hold angle (q ) = 41.18°

Select the correct answer.

a) 1378.84

b) 376.22

c) 472.41
d) 5276.84

4) Given the following profile variables, choose the correct answer below after calculating the
end of build (EOB) measured depth (MD) of a build and hold directional well: ·

Target Displacement = 2,500 ft ·

Target Direction = S28°E ·

Target TVD = 10,500 ft ·

Build Up Rate = 3° per 100 ft ·

Kickoff Point = 6,925 ft ·

Maximum Hold Angle = 41.18°

Select the correct answer.

a) 8,297.67 ft

b) 11,376.84 ft

c) 8,182.5 ft

d) 472.41 ft

5) Given the following profile variables, choose the correct answer below after calculating the
target total measured depth of a build and hold directional well: ·

Target Displacement = 2,500 ft ·

Target Direction = S28°E ·

Target TVD = 10,500 ft ·

Build Up Rate = 3° per 100 ft ·

Kickoff Point = 6,925 ft ·

Maximum Hold Angle = 41.18°


Select the correct answer.

a) 472.41 ft

b) 8,182.5 ft

c) 11,376.84 ft

d) 8,297.67 ft

EJERCICIO #1 POZO TIPO J


Target location = S 1,800´ / W 1,220´
KOP (V1) = 1,800´
Target´s TVD (V3) = 9,000´
Build radius ® = 2,300´
EJERCICIO #2 POZO TIPO J
Target location = S 2,000´ / W 1,250´
KOP (V1) = 1,500´
Target´s TVD (V3) = 8,000´
Build radius ® = 2,000´