1) Given the following profile variables, choose the correct answer below after calculating
the maximum hold angle for a build and hold directional well.
Target Displacement = 2500 ft
Target TVD = 10500 ft
Build Up Rate = 3° per 100 ft
Kickoff Point = 6925 ft
b) 136°34’
c) 41.18°
d) 26.72°
2) Given the following profile variables, choose the correct answer below after calculating the
end of build TVD for a build and hold directional well:
a) 8,297.67 ft
b) 6,783.4 ft
c) 472.41 ft
d) 8,182.5 ft
3) Given the following profile variables, choose the correct answer below after calculating the
end of build (EOB) displacement for a build and hold directional well:
a) 1378.84
b) 376.22
c) 472.41
d) 5276.84
4) Given the following profile variables, choose the correct answer below after calculating the
end of build (EOB) measured depth (MD) of a build and hold directional well: ·
a) 8,297.67 ft
b) 11,376.84 ft
c) 8,182.5 ft
d) 472.41 ft
5) Given the following profile variables, choose the correct answer below after calculating the
target total measured depth of a build and hold directional well: ·
a) 472.41 ft
b) 8,182.5 ft
c) 11,376.84 ft
d) 8,297.67 ft