Subject : Reply to No. 1609 "proposed adjustment of Foundation Pit Excavation and
Protection at pier No. 13 of bridge No. 25
CRDC, after receiving the letter "Suggest Adjusting Excavation Protection at Pier 13
DK82+602.54 Bridge #25”, has investigated and verified the site conditions. According to the
investigation and verification of the site conditions, itis considered that itis
ippropriate to change
the protection of steel sheet piles excavated from 13# pier foundation pit at the original design
location DK82 + 602.54 into bored piles protection. The modified guiding protection scheme is
shown in the figure below. The construction unit is requested to organize the site construction
according to the bored pile protection scheme, strengthen the organization and management, and
ensure the safety of the adjacent roads and smooth drainage of the river.
‘Thank you for your attention and suggestions.PHABRTEA ARDS Aten oe 2
Pata Pa
CHINA RAILWAY DESIGN CORPORATION TON Ponrone (Faxy *62 21 8910070PHARRit el AR Aol Pavia ak Joan on rc
CHINA RAILWAY DESIGN CORPORATION +101 Papin Kay 57. Coma. a
Sincerely,
“Xindian Highway | Station&Yard | Geology uulvert | Tunnel | Subgrade
Chief Engineer of CRDC
CC: HSRCC
epjoPHARRItT eH ARG Pa at ser en R12
so arate Con
CHINA RAILWAY DESIGN CORPORATION ‘Phone (Fax): +62-21-05918870
KF 1609 SF “BUNK 25 SH 13 SWINE” MLR
CROC ZEIKCH) “Suggest Adjusting Excavation Protection at Pier 13 DKB2+602.54 Bridge #25”
TPH, RIL RMLT 7 WARNE, AEG. AGHCULIT DK82+602.54 CEL 134HEIE
SPE AEDT PER HTP ME iG, PLN PEGE IL PL ier
AUG ALAL DD FRANSES i RES BT RAPT AGO
BE XIE MBIL.PHARIRIT RAIA a Pack Aeron oes RK2
CHINA RAILWAY DESIGN CORPORATION API Ponrone Fax) 9022120910070
‘Phono (Fax)
@
‘