You are on page 1of 5
PHAR Hl ARAol at ora cn rca CHINA RAILWAY DESIGN CORPORATION JLDI Penjaitan Kav 5-7, Cawang, Jakarta Phone (Faxy +62-2186018670 Ref. No: CRDC/WIKA/0005/2020 Date: 6 January, 2019 To: PT. Wijaya Karya (Persero) ‘Tbk. JI. D.L Pandjaitan Kav. 9-10 Jakarta, 13340, Indonesia Subject : Reply to No. 1609 "proposed adjustment of Foundation Pit Excavation and Protection at pier No. 13 of bridge No. 25 CRDC, after receiving the letter "Suggest Adjusting Excavation Protection at Pier 13 DK82+602.54 Bridge #25”, has investigated and verified the site conditions. According to the investigation and verification of the site conditions, itis considered that itis ippropriate to change the protection of steel sheet piles excavated from 13# pier foundation pit at the original design location DK82 + 602.54 into bored piles protection. The modified guiding protection scheme is shown in the figure below. The construction unit is requested to organize the site construction according to the bored pile protection scheme, strengthen the organization and management, and ensure the safety of the adjacent roads and smooth drainage of the river. ‘Thank you for your attention and suggestions. PHABRTEA ARDS Aten oe 2 Pata Pa CHINA RAILWAY DESIGN CORPORATION TON Ponrone (Faxy *62 21 8910070 PHARRit el AR Aol Pavia ak Joan on rc CHINA RAILWAY DESIGN CORPORATION +101 Papin Kay 57. Coma. a Sincerely, “Xindian Highway | Station&Yard | Geology uulvert | Tunnel | Subgrade Chief Engineer of CRDC CC: HSRCC epjo PHARRItT eH ARG Pa at ser en R12 so arate Con CHINA RAILWAY DESIGN CORPORATION ‘Phone (Fax): +62-21-05918870 KF 1609 SF “BUNK 25 SH 13 SWINE” MLR CROC ZEIKCH) “Suggest Adjusting Excavation Protection at Pier 13 DKB2+602.54 Bridge #25” TPH, RIL RMLT 7 WARNE, AEG. AGHCULIT DK82+602.54 CEL 134HEIE SPE AEDT PER HTP ME iG, PLN PEGE IL PL ier AUG ALAL DD FRANSES i RES BT RAPT AGO BE XIE MBIL. PHARIRIT RAIA a Pack Aeron oes RK2 CHINA RAILWAY DESIGN CORPORATION API Ponrone Fax) 9022120910070 ‘Phono (Fax) @ ‘

You might also like