Date:
Company: Te.
Adress: Fax
Email
Contact person Internet:
Project
Pace of aeemey:
‘Conveying materia
copaety: myn ner om
Blk density emt Quantity Pe
Granvltion mm outlet: mm
Temperature < uantiny: Pe
uly % Design: AISI3I60 AN 3080
Operation year bya Coroonstesl 523518 O
Vortage Vote he Protectio
‘Avex Zone inside: outside:
Specific feature:
Special requirements at the tube chain conveyor: provontion oferess Grain destruction
minimum of product:
residue
Please describe the line direction o send ws a drawing.
(CAD drawing via DIG Fie, STEP- or SolidWorks Fie)
Feeder existing a ves ‘whieh once:
No, please offer acitionally
You wie
Vist on side and technical mesting
Vist at aur testing fallty
Conveying test at our testing faclty
Conveying tston side
Reference vit
General reference let
ooc0coe