M30 / M35 2 Finishing / Corners 3 Shrinkage / Cracks observed 4 Satisfactory Curing 5 Honeycombing Observed after de- shuttering 6 Formwork line / Level after pouring 7 Steel Exposure on surface 8 Hacking if required 9 Concrete Strength 7 Day 10 Concrete Strength 28 Day 11 Proper de-shuttering 12 Bottom level of beam more than 5.0 meter length 13 Bulging of concrete surface 14 slab top R.L. Conclusion by Civil4M Representative - Activities Are Satisfactory / Not satisfactory