Civil4M Solutions LLP

Forum Project
Post Concrete Inspection Works

Name of Structure : Date :

Reference Drawings : Location:

Sr. Particulars Yes / No / Remarks


No. N.A.

1 Grade of Concrete - M15 / M20 / M25 /


M30 / M35
2 Finishing / Corners
3 Shrinkage / Cracks observed
4 Satisfactory Curing
5 Honeycombing Observed after de-
shuttering
6 Formwork line / Level after pouring
7 Steel Exposure on surface
8 Hacking if required
9 Concrete Strength 7 Day
10 Concrete Strength 28 Day
11 Proper de-shuttering
12 Bottom level of beam more than 5.0 meter
length
13 Bulging of concrete surface
14 slab top R.L.
Conclusion by Civil4M Representative - Activities Are Satisfactory / Not satisfactory

Contractor's Representative Civil4M Representative

Signature Signature