Construction Progress
Construction Progress
25.00%
21.29%
20.00%
17.90%
15.00%
10.00%
5.14%
5.00% 4.70%
3.48%
2.52
0.00%
Excavation (m3) Concrete (m3) Formwork (m2)
3.48%
2.52
0.00%
Excavation (m3) Concrete (m3) Formwork (m2)
Construction Progress Todate
PLANNED ACTUAL
9.28%
3.85%
3.48%
3.02%
2.52%
1.81%
1.16%
11.02%
9.28%
Backfilling (m3)
Backfilling (m3)