You are on page 1of 3
North Central Railway Head Quarter office Engineering branch Prayagraj No.219-W/18/Misc/Pt-VI Date: 09.07.2020 |. CAO/NCR/PRYJ CPM/RVNLICNB, JHS, GWL, AGC . CPM/DFCCIL/Meerut, Tundla, ALD East, ALD West Sr.DEN/Co-ord/PRYJ, JHS & AGC . CWM/CPOH/NCR/SFG . Dy.CE/TMC/Line/NCR/JHS . XEN/CSP/NCR/Subedarganj . Principal/IRTMTC/ Subedarganj . Dy.CE/Br.Line/NCR/PRYJ, JHS, AGC 10. Prineipal/CETA/ Kanpur 11. All Engineering Officers/NCR/HQ/Prayagraj een anew Sub: Adoption of redrafted Indian Railways Permanent Way Manual (IRPWM) Ref: Railway Board's letter no.2013/CE-II/TK/IRPWM dated 24.06.2020, 07.07.2020 (copy enclosed) In connection with above subject new redrafted IRPWM has been approved by Railway Board and you are advised to download the redrafted IRPWM from the IRICEN website, for all future references. Provisions contained in the redrafted IRPWM shall supersede all provisions of existing IRPWM and LWR manual. pores DA: As above. cal per (Anil Kumar Dadarya) Chief Track Engineer RT LAT (GOVERNMENT OF INDIA) nN elt it, oli RCT entsTRY OF RAILWAYS) eg aa STS (RAILWAY BOARD) caer” No.2013/CE-II/TK/IRPWM New Delhi, dt. 07/07/2020 Principal Chief Engineers, Chief Administrative Officers (C) All Zonal Railways All Zonal Railways Sub: Adoption of redrafted Indian Railways Permanent Way Manual (IRPWM] Ref: Board’s letter of even no. dated 24.06.2020. “Indian Railways Permanent Way Manual” was published in the year 1986 with its second and third reprint in 1999 and 2019 respectively. With substantial revision of practices of inspection, monitoring and maintenance of track alongwith modernization of track structure, provisions of this manual needed updation. Accordingly, with the approval of Board (ME), the existing IRPWM has been redrafted duly incorporating the provisions of LWR manual. Henceforth there shall be no separate LWR manual Vide above reference, IRICEN has been advised for taking necessary action for printing of redrafted IRPWM. Meanwhile, the redrafted IRPWM has been uploaded on the IRICEN website. The new manual contains provisions for Broad Gauge only, hence, provisions contained in existing [RPWM/LWR manual for MG/NG shall continue to be applicable. Railways are advised to download the redrafted IRPWM for all future references. Provisions contained in the redrafted IRPWM shall supersede all provisions of existing IRPWM and LWR manual. Copy to- Ny a9 ie veaent pl Director Civil Engg. (P) Railway Board Annexure ‘No.2013/CE-I/TK/IRPWM ‘The General Manager/CORE/Allahabad. Principal Financial Advisor, All Indian Railways The General Managers (Engg) — ICF/Chennai, RCF/Kapurthla. CLW/Chittranjan, Rail Wheel F DLW/Varanasi, The Director Gerieral (Track), RDSO/Alambagh, Lucknow Chief Commissioner of Railway Safety, Lucknow. Managing Director, IRCON, New Dell Managing Director, RITES, RITES (RITES BHAWAN) NBo.| Sector-29 Gurgaon-122001 Managing Director, DMRC, Metro Bhawan, Barakhamba lane, New Delhi Managing Director, CONCOR, New Delhi. Managing Director, RVNL, August Kranti Bhawan, Bhikaji Cama Place, New Delhi Managing Director, DFCCIL, Pragati Maidan, Metro Station, New Delhi. Managing Director, PIPAVAV Railway Corp. Ltd, 14th Floor, B-Wing, Statesman House 148, Barakhamba Road, Canaught Place New Delhi Central Delhi Managing Director, MRVC, Church Gate station Building 2nd Floor, Mumbai ~ 400020 Managing Director, RLDA, IRCON Office Compound, Next to Safdarjang Rly. station, Motibagh-I, New Delhi. Managing Director, Konkan Railway Corporation Ltd, Belapur Bhawan, Sector-11, CBD Belapur. Mumbai. Pin - 400614. Director. IRICEN, Pune. Director. IRIEEN. Nasik. Director, IRISET, Secunderabad. Director, IRIMEE, Jamalpur. Director. [RITM, Vill. Kanausi, Hardoi, Manik Nagar, Lucknow. Railway Staff College, Vadodara. Director General, ‘AIRF, NFIR, IRPOF, FROA, AIRPFA, DAI (Railways) Rail Bhawan, New Genl. Secretaries, Delhi. Copy t0:- Sr. PPS/PS to CRB, FC, ME, MRS, MS, MT, M(Tr.).M (S& T), MM, Secretary ‘AM(CE). AM(Works), AM(Budget), AMElect.), AM(Fin.), AM(Sig). AM(Plz.), AMGiafl), ‘AM(Mech. Enge.). AM(PU.), AM(Tele,), AM(TT), PED(Bridge), PED(Vigilance), PED(Stn.Dey.Engg.) PED(Safety), AM(C8AS), AM(T&C), AM(Comm!.). PEDCE(P), EDTK(MC), EDCE(G), PED(Bridge), ED(L&A)I, — ED(Works), ED(Project Monitoring), ED(Safety), EDF(X)I, EDF(X)I, DTK(MC), DTK(M), DTK(P), DCEB&S), DCE(B&S)IL Dir, Works(Plg.). DVE+1 & DVE-II, EDV). Dir(Works)-I, Dir(Works)-II, ED/C&IS - for uploading on Railway Board website.

You might also like