North Central Railway
Head Quarter office
Engineering branch
Prayagraj
No.219-W/18/Misc/Pt-VI Date: 09.07.2020
|. CAO/NCR/PRYJ
CPM/RVNLICNB, JHS, GWL, AGC
. CPM/DFCCIL/Meerut, Tundla, ALD East, ALD West
Sr.DEN/Co-ord/PRYJ, JHS & AGC
. CWM/CPOH/NCR/SFG
. Dy.CE/TMC/Line/NCR/JHS
. XEN/CSP/NCR/Subedarganj
. Principal/IRTMTC/ Subedarganj
. Dy.CE/Br.Line/NCR/PRYJ, JHS, AGC
10. Prineipal/CETA/ Kanpur
11. All Engineering Officers/NCR/HQ/Prayagraj
een anew
Sub: Adoption of redrafted Indian Railways Permanent Way Manual (IRPWM)
Ref: Railway Board's letter no.2013/CE-II/TK/IRPWM dated 24.06.2020, 07.07.2020
(copy enclosed)
In connection with above subject new redrafted IRPWM has been approved by
Railway Board and you are advised to download the redrafted IRPWM from the IRICEN
website, for all future references. Provisions contained in the redrafted IRPWM shall
supersede all provisions of existing IRPWM and LWR manual.
pores
DA: As above. cal per
(Anil Kumar Dadarya)
Chief Track EngineerRT LAT (GOVERNMENT OF INDIA)
nN elt it, oli RCT entsTRY OF RAILWAYS)
eg
aa STS (RAILWAY BOARD)
caer”
No.2013/CE-II/TK/IRPWM New Delhi, dt. 07/07/2020
Principal Chief Engineers, Chief Administrative Officers (C)
All Zonal Railways All Zonal Railways
Sub: Adoption of redrafted Indian Railways Permanent Way
Manual (IRPWM]
Ref: Board’s letter of even no. dated 24.06.2020.
“Indian Railways Permanent Way Manual” was published in the year
1986 with its second and third reprint in 1999 and 2019 respectively. With
substantial revision of practices of inspection, monitoring and maintenance of
track alongwith modernization of track structure, provisions of this manual
needed updation.
Accordingly, with the approval of Board (ME), the existing IRPWM has
been redrafted duly incorporating the provisions of LWR manual. Henceforth
there shall be no separate LWR manual
Vide above reference, IRICEN has been advised for taking necessary
action for printing of redrafted IRPWM. Meanwhile, the redrafted IRPWM has
been uploaded on the IRICEN website. The new manual contains provisions for
Broad Gauge only, hence, provisions contained in existing [RPWM/LWR
manual for MG/NG shall continue to be applicable.
Railways are advised to download the redrafted IRPWM for all future
references. Provisions contained in the redrafted IRPWM shall supersede all
provisions of existing IRPWM and LWR manual.
Copy to- Ny a9
ie veaent pl
Director Civil Engg. (P)
Railway BoardAnnexure
‘No.2013/CE-I/TK/IRPWM
‘The General Manager/CORE/Allahabad.
Principal Financial Advisor, All Indian Railways
The General Managers (Engg) — ICF/Chennai, RCF/Kapurthla.
CLW/Chittranjan, Rail Wheel F
DLW/Varanasi,
The Director Gerieral (Track), RDSO/Alambagh, Lucknow
Chief Commissioner of Railway Safety, Lucknow.
Managing Director, IRCON, New Dell
Managing Director, RITES, RITES (RITES BHAWAN) NBo.| Sector-29 Gurgaon-122001
Managing Director, DMRC, Metro Bhawan, Barakhamba lane, New Delhi
Managing Director, CONCOR, New Delhi.
Managing Director, RVNL, August Kranti Bhawan, Bhikaji Cama Place, New Delhi
Managing Director, DFCCIL, Pragati Maidan, Metro Station, New Delhi.
Managing Director, PIPAVAV Railway Corp. Ltd, 14th Floor, B-Wing, Statesman House 148,
Barakhamba Road, Canaught Place New Delhi Central Delhi
Managing Director, MRVC, Church Gate station Building 2nd Floor, Mumbai ~ 400020
Managing Director, RLDA, IRCON Office Compound, Next to Safdarjang Rly. station,
Motibagh-I, New Delhi.
Managing Director, Konkan Railway Corporation Ltd, Belapur Bhawan, Sector-11, CBD
Belapur. Mumbai. Pin - 400614.
Director. IRICEN, Pune.
Director. IRIEEN. Nasik.
Director, IRISET, Secunderabad.
Director, IRIMEE, Jamalpur.
Director. [RITM, Vill. Kanausi, Hardoi, Manik Nagar, Lucknow.
Railway Staff College, Vadodara.
Director General,
‘AIRF, NFIR, IRPOF, FROA, AIRPFA, DAI (Railways) Rail Bhawan, New
Genl. Secretaries,
Delhi.
Copy t0:-
Sr. PPS/PS to CRB, FC, ME, MRS, MS, MT, M(Tr.).M (S& T), MM, Secretary
‘AM(CE). AM(Works), AM(Budget), AMElect.), AM(Fin.), AM(Sig). AM(Plz.), AMGiafl),
‘AM(Mech. Enge.). AM(PU.), AM(Tele,), AM(TT), PED(Bridge), PED(Vigilance),
PED(Stn.Dey.Engg.) PED(Safety), AM(C8AS), AM(T&C), AM(Comm!.).
PEDCE(P), EDTK(MC), EDCE(G), PED(Bridge), ED(L&A)I, — ED(Works),
ED(Project Monitoring), ED(Safety), EDF(X)I, EDF(X)I,
DTK(MC), DTK(M), DTK(P), DCEB&S), DCE(B&S)IL
Dir, Works(Plg.). DVE+1 & DVE-II,
EDV).
Dir(Works)-I, Dir(Works)-II,
ED/C&IS - for uploading on Railway Board website.