You are on page 1of 2

MGB341 Assessment 2 CRA – 40%

Criteria High Distinction (7) Distinction (6) Credit (5) Pass (4) Fail (3 or below)

100% – 85% 84% – 75% 74% – 65% 64% – 50% 49% – 0%

Assurance of Learning Goal KS1.2: Apply technical and technological skills appropriate and effective for real world business purposes and contexts (i.e. use of an industry standard - AS/NZS:5050)

Accurate use of the The risk management plan The risk management plan mostly The risk management plan The risk management plan The risk management plan shows
AS/NZS:5050 to support demonstrates a systematic demonstrates a systematic applies a range of risk applies risk management little or no application of the
your plan. application of risk principles and application of the of risk principles and the business terminology and appears to link AS/NZS:5050.
the business continuity standard principles and the business continuity standard (as outlined to the concepts detailed in the
Mark out of 10 (as outlined in the AS/NZS:5050). continuity standard (as outlined in the AS/NZS:5050). business continuity standard There is little demonstrated
in the AS/NZS:5050). (AS/NZS:5050). understanding of the objectives of
The accurate identification and Project objectives, benefits, the project, its intended benefits,
justification of project objectives, Project objectives, benefits, hazards and unknown factors Project objectives, benefits, hazards, and unknown factors.
benefits, hazards and unknown hazards and unknown factors are have been listed, although are hazards and unknown factors
factors demonstrates an detailed and justified, and link to sometimes lacking justification have been listed, although there The proposed plan fails to provide
articulate understanding of how the organisation’s goals and or linking to the organisation’s is little justification and/or linking a clear process for identifying,
the project interfaces with the stakeholder environment. goals and/or stakeholder to the organisation’s goals and/or analyzing, evaluating and treating
organisation’s goals and environment. stakeholder environment. threats.
stakeholder environment. Identification and articulating of
appropriate levels of The frequency of The frequency of administrative The proposed plan fails to provide
Identification and articulating of administrative reviews, and administrative reviews, and reviews, and levels of managerial a process for identifying an
appropriate levels of management response to the levels of managerial response response required for the appropriate level of managerial
administrative reviews, and different levels of risk possible for required for the differing levels differing levels of risk possible for response for treating threats.
management response to the the project have been detailed of risk possible for the project the project have been detailed to
The proposed plan fails to detail
different levels of risk possible for alongside the risk matrix defined have been detailed to support support the risk matrix, however
administrative review processes
the project have been tailored to for the project. A risk appetite the risk matrix, although it’s the risk appetite of the
for reviewing, updating and
the risk appetite of the statement has also been difficult to understand the risk organization has not been
assigning responsibility for known
organization. provided, however the link appetite of the organization or discussed.
threats for the Threat Register.
between response levels and risk how this links to the response
appetite could be improved. levels you’ve defined.

Assurance of Learning Goal HO2.1: Investigate real world business issues and situations through the effective analysis, evaluation and synthesis of theory and practice

Tailoring of processes and Your use of evidence-based Evidence/sources have been used The proposed plan draws upon The proposed plan draws upon a Critical risk principles/ models/
frameworks to the justification, with clear to document and justify a small but informative range range of sources as its evidence- frameworks are missing from your
organisation’s context in documentation of your extensive assertions. Logical assumptions of sources as its evidence-base. base, however these have been discussion. There is limited to no
your Risk Management Plan investigation and underlying have also been identified and Your logic and assumptions are from questionable sources, use of sources to support your
assumptions combine to risk used to support your discussion documented, although are which reduces the validity or assertions.
Mark out of 10 management structure that is and decisions for the structure of sometimes not easy to follow in support of your discussion. Your
underpinned by an infallible logic your proposed plan. your discussion. logic and assumptions are Assumptions and logic are not
that makes it difficult to documented, although some of documented, which limits the
challenge your proposed plan. An evidence-based approach to these are not always consistent ability of future analysts to
formulating your risk understand or work with your
Senior managers would Your risk management plan is management plan, but is with accepted norms in risk proposed structure. There is little
commend you for your report unlikely to be challenged by incomplete and likely to be management. to no evidence supporting your
and and readily incorporate your senior managers. challenged by senior managers. proposed plan and
recommendations into the Due to the limited evidence-base recommendations.
operating framework of the supporting your analysis, senior
project. managers would likely require Accordingly, senior managers
you to revise your plan before would require the report and
accepting your proposed plan corporate threat register entry to
and recommendations. be started from scratch.

Assurance of Learning Goal SE 5.2: Demonstrate and apply knowledge of socially responsible behaviour in analysing and addressing business issues in national and international business contexts.

Formulating and justifying Comprehensive consideration Clear consideration and Risk principles and the business Risk principles and the business Little / no identification of
your recommendations for and application of risk principles application of risk principles and continuity standard have been continuity standard have been stakeholder interests or application
treating the project’s and business continuity standard business continuity standard in used to structure much of the referred to in the formulating of risk principles and/or business
current risk rating in formulating and justifying your formulating recommendations. discussion in formulating and and/or justification of continuity standard in formulating
recommendations. The There is some imbalance justifying the recommendations recommendations, however the recommendations for the risk
recommendations demonstrate a between the strategic goals and provided in the report. there is limited depth of management plan.
Mark out of 10 clear commitment to protecting societal interests that have been Discussion for how the discussion identifying how the
strategic goals while also highlighted in your recommendations enable the recommendations meet the
protecting societal interests (i.e. recommendations. organization to meet its organisation’s strategic goals
preservation of life, sustainability strategic goals is provided, as is and/or the societal interests at
concerns, etc.) discussion for how the stake with respect to managing
recommendations appreciate the risk.
or impact societal interests.

Assurance of Learning Goal PC 3.1: Use information literacy skills, and communicate effectively and professionally in written forms and using media appropriate for diverse purposes and contexts.

Structure and writing style The overall presentation of the The overall presentation of the The report is well organised The report is organised but there Document is not logically organised
of the report and use of document is equivalent to a document is almost equivalent to with only minor errors or may be some aspects of the task or the writing style shows little
APA referencing professional consultancy report. a professional consultancy report. omissions. Writing style is where the requirements are not regard given for professional
The report is logically organised The report is logically organised mostly professional although met (i.e. missing an executive presentation. There is a lack of
Mark out of 10 and addresses all aspects of the and addresses all aspects of the there are some lapses in summary; etc.). Writing style is acknowledgement of sources and
task. Writing style is concise, task. Writing style is concise, conciseness and purpose. Most somewhat professional although use of APA referencing is not
purposeful and highly uses the technical language of sources are acknowledged and the use of technical language is evident or is inaccurate.
professional. All sources are risk and mostly fit for purpose. All there are only minor inaccurate at times. There are
accurately and appropriately sources are appropriately inaccuracies in the use of APA omissions in source
acknowledged and the use of acknowledged and there is a high referencing. acknowledgement and some
APA referencing is flawless. level of accuracy in the use of inaccuracies in use of APA
APA referencing. referencing.

You might also like