Professional Documents
Culture Documents
JIP
Design is done by
JIP. L&T told
several times in
meating to reduce
the plint depth , JIP
refused.
it is as per design.
there is no
increase in area
with respect to
tender
Based on the tender layout Qty.
L&T
has not increase any area. Qty
will not change, design is Done
by JIP. they has to do
optimization
increased as per
client requirement.
rate is high ,
increased as per
Clinet requirement
it is lumpsum
basis, sanwitch
wall panel read get
redused.
KNPC requirement
client requirement
it is as per contract
and KNPC
stanrdards. as per KNPC
standars
acceptable.
to be decided by management.
since there is no chnage in area,
and Sturctural weight is increased
as JIP not designed the buildign as
epr KNPC wind load.
Need backup, as
per tender qty , it
will not increase
and design is done it is as per contract.
by JIP.