design is done by

JIP
Design is done by
JIP. L&T told
several times in
meating to reduce
the plint depth , JIP
refused.

it is as per design.
there is no
increase in area
with respect to
tender
Based on the tender layout Qty.
L&T
has not increase any area. Qty
will not change, design is Done
by JIP. they has to do
optimization
increased as per
client requirement.

rate is high ,
increased as per
Clinet requirement

it is lumpsum
basis, sanwitch
wall panel read get
redused.

KNPC requirement
client requirement

it is as per contract
and KNPC
stanrdards. as per KNPC
standars

these changes will


be nullified in other
room size change
Already mentioned
in the dwg.

acceptable.

to be decided by management.
since there is no chnage in area,
and Sturctural weight is increased
as JIP not designed the buildign as
epr KNPC wind load.

Need backup, as
per tender qty , it
will not increase
and design is done it is as per contract.
by JIP.