WARANTY MONTHLY PREVENTIVE MAL
Wi
Doc No.: SF- 2165 |Rev. No.: 06[Page 1 of 5 |Product Code: ‘SIA.
MEI633- Code:
NA
Title: MONTHLY MAINTENANCE SCHEDULE FOR MEI633
5 |
Station Name: PALI TATRY. Dwision: _KHURDA ROAD CE COR)
‘Attended on Date: 19 - 12-2020 ‘Service Engineer: Micie
|
‘ction taken / Range of
| Description amtaken Range ot | opservaton | Remarks
‘Both channels Event and Faut | a ic
oe fogs dala dowmioading should “
: saci Tos Eesmormanmens | BecKep
___| Downloaded data in CD/DVD
Ensure the MT PC is always ON and LENT |
2 | MTRC —[conmuncantna eninge |e rename [Tink
|e Behan Ao orovetne SORT SSuy unas gy
eee aan ta snd DL dapay tno. ued on.
[check ne ve working [Orbine
3 rine YOU emit tous MT (om Ny nn DU exe
Ensure DLs in working
ta Lgper | Ener DLs oye ON and Ota conn prspeed
4 “and [backed uP a
Data Logger PC | Ensure DL PC is aways ON Ensure DLPC sin working |HO*ENB,
condition (If PC is provided)
Check he Voiage levels a 2307 IPS STATE [ir esta ta
6 | Psroom |Get wotapetorRac modues_|"0¥ 9275¥ Es els pronies
Masha fu
Bote bank Votage attuly | STATCONE Meche
ater Room Messing Cal Baten lobe 8 Chad conaton shoul Be Tee Kesagevon
6 Nessie Gay level macnonce ax | rvedconducn see | ‘Swit of
er Railways Battery checklist [aaa a Mains and take
the readings
Ciean the Dust ites, Exhaust fon Doak
1 ese oe ae es ope twetromaust |
3 Clean the El Equipments Tobe fee fom dust ee
> | coupe Rey /Crecktecommuniaton tse | Relat Communicate ant Commenicalion
aument/Reley | EI Modues and ing Modems [edssnoudbe Gowran | evmnd ex
ann. | Check al Healt Status LED .¢ sith iebs
0 Saag hea nda rd VCOR | LED shoul be Gown axe | ~
pow LED ndenion gens
Hi Eneure any OC FMC falindcation or | Very al FMC working PNG
Euezersousoteome.|eondon working
2 Ensure OC-DC Modules Fall ‘Al Heath and power ON Health
indleation shoul not Glow tnaeatone should lw 5
isvally examine all ho SA cards ore : “Walitness
ta | Equpment/Roay|Yoneseroory anc agen ne (enmremeonnens tte | |
Room and End | corresponding Screws ae
‘cabins: cd + iF —
7 sone” | DBsomnect ype se ago (Pua Fes
1“ Checkthw ek wagofiseldcatore — |[Daeerrectime egrets | ibhaat abun
Clean surface ofthe Earth olecvode
6 Slams face sutace shou be Fert lemme d |
[Measure the Resistance ofthe Rina. | pesisance Should be
16 Cernit possible, water inthe Earth | Resp .
Pits to keep low sol resistance sn 0:36--
Earthing.. | Check the Indication LED ‘Au SPOS
a7 | TAREE [Crwckne SPD vce fran sre ot St of SF SPD cates | cove
| iyeical degre FAIL then replace it) do TKiny
Check Lightning Arrestor connection at connections I tne:
8 Goan ings ancl [Alticomedine tote |
fhe cennestoneemnations nn as
9 SMROOM | Ensure VDU PC ONand ‘Check the Indications on VOU | Beth Gloire)
omeuneation inks Healthy forboth | PC and Monitor i
CH-Aand CHB. Mound working
Roterence Template number SF-0802 (8) 1/1Doc No. SF-2165 |Rev. No. 06 SIA
Code:
NA
|[Title: MONTHLY MAINTENANCE SCHEDULE FOR MEI633 I
| | Action taken / Range of
Sino | Location | Description ae | observation | Remarks
= e el ‘Applicable for
Ensure change ovr VOU! to VOU2 or | Commanded VOU shoul ake
| =| Ete tare cry OULD WON | Conmaniet oLaoue ever’ [BURL YU
Sacha inaconnomonr | pecgdlou
‘Conmandod operating Paral _ -—
F mous charge oer voUe Panes (SOS creme cean [LNA — | pop
} | (GeiP) orice: Versa. fensnoudoenndonen | Deer [vDUsPs
| rede vo |
aamiaien ere | Recendd
teins runing in yard
re |
septeabon nade eb
Indeaton mode bie
3. Now close VDU application
‘4 Glick on Start menu —
Run ype Temp and cick Qeth voo |
ox ;
Siow solectalfies and operation
prose ditto rove al
{orp tes vou Chocked
‘Suns type Recent and | Applicaton
Ensure that temporary fies ae tobe
2 | vourc chec OK Sroud work
deleted from VOUT VOU2PC's 7 Now select all fies and | normaly ater enc)
Frese doetotoremove at |re.openng a
tomp fe.
Once ater cern a mp
& recent file. Once again re=
‘open VOU application and
| ‘make VDU az command
| mode and do some
‘porations to ensure the
functionally. |
Note: Repeat same process |
forvou2PC. |
\Voltage Observations at Equipment End :
| sino. Description |. Range of Votage Levels Observed voltage | _Rétiarks
| + | check the Votage at CIU CH-A 23:5 to 26, 6V DC to be observed 24.84v
| 2 _| checkin voage at cl CHS za5t0265v oCwbecdseved — | 24. GEV.
| 3 | check te Vaiage at OC OHA B50 2sVOCIbeobsenes | 5-34
| Check he Volage at OC CH-8 235 0 26.5V DC tobe observed OS UY
5 | Check te votage at OC FIC 235 10 24 DC tobe observed 23.320
| Check the Vaiage at OC INT 2510 2650 DC tobe obsened Ou.sev
7 | Check the Votage at PIVDUCH-A _|235 10 26.5V DC tobe observed DANY
@ [eneakine vtage a PPVDUCHS _|29.5102665V DC be observed 24.04
[> [crete tan at PIN PP [219 av DC etm osenes ei pear |
| 10 | check ne Votage at VOU PC 2410 27V OC tobe observed o7.52V
nr [eceteyatogeat voure-2—[aewzrvoctotwotanes | 95-98
12 loheckine Votage at MTPC 2410 27V DC tobe observed 26-36V
so [Game ona atveon cou |25 zr 0 we otzened 93.£0
|LED Observations in CiU:
FRoterence Template number SF-0802 (8) 1/1Doc No.: SF- 2165 [Rev. No.: 06]
Page 3 of 5 [Product Code: SIA
MEI633 Code:
NA
Title: MONTHLY MAINTENANCE SCHEDULE FOR MEI633
LED Name LeD Colour _|
poweR ANGER
ovo |___