PROVISION OF ENGINEERING, PROCUREMENT, CONSTRUCTION AND

COMMISSIONING (EPCC) OF GAS DEHYDRATION PLANT AND DRY GAS PIPELINE


FOR PETRONAS CARIGALI IRAQ HOLDING B.V

INSPECTION TEST RECORD


Line-UP Inspection Checklist QC-PL-0005
Project No. PCIHBV/2016/P&E/1469 Location/Facilities
Information
System ITP No.
Sub System RFI No.
Ref. Drawing No. Record No.
Inspection Date
INSPECTION / TEST
Inspection Conclusion
NO. Activity Remark
Ok N/A PL No
1 Ensure the pipe size is correct before lining up.
Internal surface of pipes shall be free of any mud, sand, etc. The external
and internal of pipes near the groove shall be free of any
2
rust and oil, etc. before lining up.

3 Damaged and unsatisfied pipe ends shall be repaired as per the


specifications.

4 Pipes shall be lifted and assembled with the approved special lifting
equipment.

COMMENT(S) AND ADDITIONAL INFORMATION

COMPLETED BY VERIFIED BY ACCEPTED BY

Designation SCOP-PEG TPI PCIHBV


Name

Signature

Date