STAGE OF COMPLETION

Account:

DESCRIPTION 30% 60% 90% 100%


I. STRUCTURAL FRAMING
FOUNDATION 100.00% 100.00% 100.00% 100.00%
COLUMNS 50.00% 100.00% 100.00% 100.00%
BEAMS 50.00% 100.00% 100.00% 100.00%
SLAB ON FILL 0.00% 100.00% 100.00% 100.00%
SUSPENDED SLAB 100.00% 100.00% 100.00% 100.00%
II. ROOFING 0.00% 100.00% 100.00% 100.00%
III. CEILING 0.00% 0.00% 100.00% 100.00%
IV. FLOOR FINISHES 0.00% 0.00% 100.00% 100.00%
V. EXTERIOR/INTERIOR CHB WALLS 60.00% 100.00% 100.00% 100.00%
VI. PLASTERING 30.00% 50.00% 100.00% 100.00%
VII. DOORS AND WINDOWS 0.00% 0.00% 30.00% 100.00%
VIII. PAINTING 0.00% 0.00% 50.00% 100.00%
IX. ELECTRICAL 10.00% 20.00% 70.00% 100.00%
X. PLUMBING 20.00% 30.00% 80.00% 100.00%
TOTAL