Dikendar Estiment NOS KG

1 2'' pipe 325 mtr 200000


2 7.5 HP power pack 55000
3 6 lack .kilo.calary burner ( Tharmic fyudic hittar) 600000
4 labour 100000
5 penal 21000
6 7.5 Hp Moter 17000
7 300 LTR pump 12000
8 Cylender 3 Nos Stok 500 mm 30000
9 Sim less pipe 72 nos 500mtr 150000
10 2''flange 40 nos 12000 40
11 2'' U Band 60 nos 20000 60
12 50 x 50 x 5 Angle 10 228
13 150 x 75 C chenal 10 1008
14 200 x 75 C chenal 2 270
15 40 x 40 x 5 mm thk Angle 5 90
16 75 x 40 C chenal 5 214
17 100 x 50 C chenal 5 300
18 1500 x 6300 x 5 mm thk 7 2700
19 1500 x 6300 X 3 mm thk 2 450
20 100 x100 x8 mm thk Angle 6 440
21 2'' pipe angle band 11000 30
22 2'' Twoway wal 5000 2
23 Hydrolic pipe 1'' 16000
24 Power pack 55000
25 MISE 704000 300
6000
1.5'' pipe in side
2'' pipe out side
Drum size 550 or 650

Per hour 5 ton


1430000
1100000

6000 x 90 = 540000 MS