Access.
the course you want, if selected..... Full Form of RFI ? Full Form of TOS ? Full Form of F.F.L ? Full Form of S.S.L ? Full Form of RHS ? Describe the various types of slump test indications ? Steel Connection name ? Full Form of BIMCan
? you list out the various steps involved in the concreting
Whatprocess?
are some of the common roof types? Select out the potential risk factors for workers on the construction site. What is the maximum allowable fresh concrete temperature until used as per ASTM ? How to calculate number of Reinforcement bars
Weight
? of 18 number of cement bags
Number
? of cement bags in 13 cubic meter ? Crank length in crank bar is 0.42D, what is D in 0.42D ? Density of cement in kgs per cubic feet ? Name of this building ? Unistrut can be used as ............? BIM is a software or a process ?
8/11/2021 11:40:52 19 / 20 shazeb noman Quantity Survey request for information top of steel finish floor level structural slab level rectangular hollow sections All Of The Above p1026 building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 32 (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.8 Column & Beam process
8/14/2021 15:55:15 16 / 20 Imtiyaz ali Curtain Walls In Revit request for information terms of service finish floor level structural slab level rectengular hollow sections All Of The Above bolted connection Building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.8 matrimandir Column & Beam process
8/15/2021 13:46:23 16 / 20 Vinit Patel ETABS request for information top of steel finish floor level structure surface level rectangular hollow section All Of The Above bolted connection building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.8 matrimandir Column & Beam process
8/15/2021 13:54:56 16 / 20 Syed Mubasheer Ul huq ETABS request for information top of steel finished floor level structural slab level rectangular hollow section All Of The Above 90° connection building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7°C - 35°C (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.77matri matrimandir Column & Beam process
8/15/2021 16:10:12 16 / 20 suraj bhujel Quantity Survey request for information theory of structure finished floor level structural slab level rectangular hollow sections All Of The Above bolted seated steel been connection building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 95f/35c (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.8 matrimandir Column & Beam process
8/19/2021 21:51:19 16 / 20 Arya Tayal ETABS request for information top of slab finished floor level structural slab level rectangular hollow sections All Of The Above bolted beam connection building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.8 matrimandir None process
8/14/2021 12:56:14 15 / 20 Manikanta ETABS request for information top of slab finished floor level structural slab level rectangular hollow sections All Of The Above corner angle building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 95f (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 94 matrimandir Column & Beam process
8/14/2021 21:09:54 15 / 20 Lohakare Pravin Vijay Quantity Survey request for information theory of structure, term of service, top of steel, top of slab finished floor level structural slab level rectangular hollow section All Of The Above unistrut 2 hole 90 degree corner angle fitting building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.8 matrimandir (meditation center) Column & Beam process
8/14/2021 22:36:24 15 / 20 Mujtaba hasan ETABS request for information top of slab finished floor level structural slab level rectangular hollow sections All Of The Above stiffened bolted seat connection building information modelling Batching,mixing, transportation,compaction,curing None Of The Above All Of The Above 35 (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.8 matrimandir Column & Beam process
8/14/2021 23:42:39 15 / 20 Prajwal Dive Quantity Survey request for information top of slab finished floor level structural slab level rectangular hollow sections All Of The Above bolted connection building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 23.7 (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.776 matrimandir Column & Beam software
8/15/2021 10:18:14 15 / 20 ASHU KUMAR KUSHWAHA Quantity Survey request for information top of slab finish floor level structural slab level rectangular hollow section All Of The Above bolted connection building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.8 matrimandir Column & Beam software
8/15/2021 14:24:31 15 / 20 SUBRAHMANYA BHAT ETABS request for information terms of service finished floor level structural slab level right angle hypotenus side All Of The Above Shear connection building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 32 (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.77 matrimandir Column process
8/16/2021 1:10:47 15 / 20 Sourav singh Quantity Survey request for information terms of services finished floor level structural slab level right hollow section All Of The Above Bolted framed structure building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35c (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440 matrimandir Column & Beam process
8/17/2021 5:48:33 15 / 20 Arnab Khanra ETABS request for information terms of service finish floor level structural slab level rectangular hollow section All Of The Above seated connection building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.8 auroville matrimandir Column & Beam process
8/17/2021 9:04:42 15 / 20 Himanshu Gupta Quantity Survey request for information top of slab/ top of steel finished floor level structural slab level rectangular hollow section All Of The Above bolted connection building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.8 matrimandir None process
8/17/2021 20:55:19 15 / 20 Samiksha Shirbhate Quantity Survey request for information theory of structure finished floor level structural slab level rectangular hollow sections All Of The Above l section building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7-35 (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 39.6 matrimandir Column & Beam Process
8/19/2021 12:03:26 15 / 20 Vaibhav Thombare ETABS request for information theorey of structure finished floor level structure surface level rectangular hallow section All Of The Above unistruct general fitting building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.8 matrimandir Column & Beam process
8/19/2021 23:36:40 15 / 20 Md Saba Faiz Quantity Survey request for information top of steel finish floor level structure surface level rectangular hollow section All Of The Above unistrut angle bracket building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 95 (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top Cover 40.8 matrimandir Column & Beam process
8/14/2021 11:57:47 14 / 20 HRUTIK KARNIK GAIKWAD ETABS request for information terms of service finish floor level structural slab level rectangular hollow sections All Of The Above bolted connect building information modeling
Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above between 26.7°C and 35°C (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 0.028 matrimandir Column & Beam process
8/14/2021 12:30:25 14 / 20 ganesh todkar ETABS request for information top of steel finished floor level structure slab level rectangular hollow section All Of The Above two hole 90 degree angle building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7°C and 35°C (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440kg/m3 matrimandir Column & Beam process
8/14/2021 12:38:22 14 / 20 Parvez Akhtar Quantity Survey request for information terms of services finish floor level structural slab level rectangular hollow section All Of The Above bolted framed connection building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.7 matrimandir Beam process
8/14/2021 12:44:23 14 / 20 K Gowtham Quantity Survey Request for information Terms of service Finished floor level Structural slab level Rectangular hollow sections All Of The Above Butt joint Building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35degree celsius (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top Cover, Depth of Slab or Beam Minus Bottom Cover 1440 Golden golbe Column & Beam Process
8/14/2021 12:49:51 14 / 20 KEVIN C MATHEW ETABS request for information theory of structure finished floor level structural slab level rectangular hollow sections All Of The Above Cleat angle bolted connection building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above between 26.7 and 35 (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 42.6 Matrimandir Column process
8/14/2021 12:51:00 14 / 20 Rajesh Pradhan Quantity Survey request for information top of steel / slab finished floor level structure surface level rectangular hollow sections All Of The Above unistrut building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7°C - 35°C (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1.2 matrimandir Column & Beam process
8/14/2021 13:18:13 14 / 20 Sohail Majeed Quantity Survey request for information theory of structure finished floor level structural slab level rectangular hollow sections All Of The Above rivet building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 32 (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1.23 golden ball building None process
8/14/2021 13:19:51 14 / 20 Avinandan Jana Quantity Survey request for information top of slab finish floor level structural slab level rectangular hollow section All Of The Above double web angle connection (unistrut) building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.77 Mantrimandir, dome shaped Column & Beam process
8/14/2021 13:21:36 14 / 20 Akshay kumar Quantity Survey request for information top of slab finish floor level structural slab level rectangular hollow section All Of The Above welded connection building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35°c (Opposite length/spacing) + 1 900 kg 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.8 auroville dome Column & Beam process
8/14/2021 13:43:50 14 / 20 DEVENDRA KUMAR SHAW Quantity Survey request for information theory of structure finish floor level structural slab level rectangular hollow section All Of The Above beam to column connection building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 27 (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 50853.6 matrimandir Beam process
8/14/2021 13:48:34 14 / 20 NITISH KUMAR Quantity Survey request for information top of sleeve finish floor level structural slab level rectangular hollow section All Of The Above Bolted connection building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 50883.39kg/ft^3 matrimandir Column & Beam software
8/14/2021 13:58:58 14 / 20 Arshad Quantity Survey Don't know top of slab finish floor level structural slab level Don't know All Of The Above angle building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 32 (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1450 Don't know Column & Beam Process
8/14/2021 13:59:08 14 / 20 Akash kumar chaudhary Quantity Survey request for information top of steel finished floor level structural slab level rectangular hollow sections All Of The Above rivit joint building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 32 (Length/spacing) + 1 900 375 BAGS Diameter 1.2 Globe Column & Beam process
8/14/2021 14:12:32 14 / 20 Chiranjit Biswas Quantity Survey request for information top of slab/steel finish floor level structure surface level rectangular hollow sections All Of The Above seat connection building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above between 26.7 to 35 degree celsius (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.8 matrimandir Column & Beam a process
8/14/2021 14:20:19 14 / 20 Lalit Patil ETABS request for information theory of structures finish floor level structure surface level rectangular hollow sections All Of The Above bolted building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1.226 matrimandir Column & Beam process
8/14/2021 15:18:23 14 / 20 KAMANI GAURANG ETABS request for information top of steel finished floor level Structural slab level Rectangular holle section All Of The Above moment resisting connection building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above between 26.7 degree C and 35 degree C (Opposite length/spacing) + 1 900 kg 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 0.02 matrimandir Column & Beam process
8/14/2021 15:32:43 14 / 20 Shivaji raja Quantity Survey Request for information Top of steel Finish floor level Structural slab level Rectangular hollow sections All Of The Above Beam to column Building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Opposite length/spacing) + 1 900 375 BAGS Diameter 1440 Auroville golden globe Column Process
8/14/2021 15:37:03 14 / 20 Kumud Kumar Curtain Walls In Revit request for information theory of structure finish floor level structural slab level rectangular hollow section All Of The Above cleat angle building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 50846.4 Matrimandir Column & Beam process
8/14/2021 17:15:57 14 / 20 Venkata Naresh ETABS request for information terms of service finish floor level structural slab level rectangular hollow sections All Of The Above framed seated cleat angle connection building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 27 to 35 degree celsius (Opposite length/spacing) + 1 900 374 BAGS Diameter 40.7 matrimandir None process
8/14/2021 20:20:02 14 / 20 Kiran Kr Sau Quantity Survey request for information top of steel finished floor level structural slab level rectangular hollow section All Of The Above shear connection building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440 Dome Column & Beam software
8/14/2021 21:03:47 14 / 20 Priyank Shah ETABS request for information top of slab finished floor level structural slab level rectangular hollow section All Of The Above web angle connection building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35° (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 50,853 matrimandir Column & Beam process
8/14/2021 23:01:07 14 / 20 Shailendra Singh ETABS request for information top of steel finish floor level structural slab level rectangular hollow section All Of The Above cleat angle building information modelling
batching,mixing,transportation,placement,compaction and Gable
curing
Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440 matrimandir Column & Beam process
8/15/2021 0:27:57 14 / 20 Krutika Deore Quantity Survey request for information top of slab finish floor level structural slab level rectangular hollow sections All Of The Above welded connection building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above a maximum temperature for fresh concrete temperature is 80 to 95 degree fahrenheit (Opposite length/spacing) + 1 774 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 68 matrimandir Column & Beam process
8/15/2021 2:51:54 14 / 20 MANSING MORE Quantity Survey request for information top of slab finish floor level structural slab level rectangular hollow section All Of The Above two hole end angle building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 36 (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.77 matrimandir None process
8/15/2021 10:02:17 14 / 20 Rajdeepak Quantity Survey request for information top of slab finished floor level structural slab level rectangular hollow section All Of The Above unistrut p1036 2 hole 90°fitting Building information modelling
Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 35 (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.7 matrimandir Column & Beam Process
8/15/2021 15:54:12 14 / 20 Vishvraj Pisal ETABS request for information theory of structures finish floor level structural slab level rectangular hollow section All Of The Above bolted connection building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above in between 26.7 and 35 (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1.2 auroville golden globe Column & Beam process
8/15/2021 16:26:53 14 / 20 Mayur Rathod Quantity Survey request for information theory of structure finish floor level structural slab level rectangular hollow section All Of The Above tacking building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 27℃ (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 42.6 matrimandir Beam process
8/15/2021 16:28:49 14 / 20 Saiesh Sunil Shetgaonkar Quantity Survey request for information top of sleeve finish floor level structural slab level rectangular hollow sections All Of The Above cleat angle building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7C-35C (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1.226 golden ball building Column & Beam process
8/15/2021 19:34:58 14 / 20 Ashida Begum Quantity Survey request for information top of slab finished floor level structural slab level rectangular hollow sections All Of The Above unistrut building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 degrees (Length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.8 auroville golden globe None process
8/16/2021 10:53:16 14 / 20 Nurulmustafa Shaikh ETABS request for information top of steel finished floor level structural slab level rectangular hollow section All Of The Above Bolted framed connection building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1.2 matrimandir None process
8/17/2021 16:51:01 14 / 20 Suresh Pisal Quantity Survey request for information theory of structure finish floor level structural slab level rectangular hollow section All Of The Above bolted connection building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above in between 26.7 and 35 (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1.2 auroville golden globe Column & Beam process
8/19/2021 11:37:44 14 / 20 Sayali Kadam Quantity Survey request for information theory of structures finished floor level structural slab level rectangular hollow sections All Of The Above bolted connection building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 160 (Length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.77 matrimandir Column & Beam a process
8/19/2021 13:51:15 14 / 20 Barsa Paul Quantity Survey request for information top of slab finish floor level structural slab level rectangular hollow section All Of The Above connecting angles building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above - (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.8 auroville None process
8/19/2021 20:04:55 14 / 20 Biswajit Addhya Quantity Survey request for information terms of service finished floor level structural slab level rectangular hollow sections All Of The Above cleat angle building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Length/spacing) + 1 864 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.8 matrimandir Column process
8/11/2021 13:49:12 13 / 20 MD ASADUDDIN Curtain Walls In Revit request for information top of steel finish floor level structure slab level rectangular hollow section All Of The Above cleat angle building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26 to 35 (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 68 matrimandir Beam process
8/14/2021 11:32:17 13 / 20 Suraj Kumar Quantity Survey Request for information Top of steel Finished floor level Structural slab level Rectangular hollow section All Of The Above Bolted steel connection Building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Duck Framed Roof, Indigo Roof, Belli Roof All Of The Above 37 (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.78 Na Column & Beam Process
8/14/2021 11:36:22 13 / 20 BALAJI ETABS request for information top of slab finish floor level structural slab level rectangular hollow section All Of The Above unistrut p1026 building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Opposite length/spacing) + 1 900 375 BAGS Diameter 1440 matrimandir Column & Beam process
8/14/2021 11:49:41 13 / 20 Prashant shankarrao fating Quantity Survey request for information top of steel finish floor level structure surface level rectangular hollow sections All Of The Above bolted connection building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1.2 matrimandir Column & Beam Software
8/14/2021 11:51:40 13 / 20 SOURAV MANDAL ETABS request for information theory of structures finished floor level structure surface level rectangular hollow section All Of The Above stiffened bolted seat connection building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 89.8 matrimandir Column & Beam process
8/14/2021 12:16:32 13 / 20 Shende Aniket Narayan ETABS request for information terms of service finish floor level structural slab level rectangular hollow section All Of The Above bolted connection building information modelling
Batching,Mixing,Transporting,Compaction and Levelling,Curing
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7 to 35 (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top Cover 40.776 matrimandir Column & Beam process
8/14/2021 12:20:31 13 / 20 Pritam Saha Quantity Survey request for information theory of structure finish floor level structural slab level rectangular hollow sections All Of The Above welded connection building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above between 26.7°C and 35°C (Length/spacing) + 1 900 375 BAGS Diameter 1440 matrimandir None process
8/14/2021 12:34:50 13 / 20 SAPARIYA RAJ ASHISHBHAI Quantity Survey request for information top slab/steel finished floor level secure socket layer rectangular hollow section All Of The Above double web angle connection building information modelling batching, mixing, transporting,compacting,curingGable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7 and 35 (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.7 matrimandir Column & Beam process
8/14/2021 12:35:35 13 / 20 Naveen Kumar Neeli Quantity Survey request for information Top of steel/slab Finished floor level Structural surface level Rectangular hollow section All Of The Above Beam to column connection Building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7C - 35 C (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 94 Matrimandir Column & Beam Process
8/14/2021 12:38:53 13 / 20 Damarigidda Saritha Mudiraj Quantity Survey request for information theory of structure finished floor level structural floor level rectangular hollow sections All Of The Above bolt connection building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440 matrimandir Column process
8/14/2021 12:43:44 13 / 20 Arpita Acharyya ETABS request for information terms of service finished floor level structural slab level rectangular hollow section All Of The Above beam to column end plate connection building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.7 matrimandir bim is
Column
a process
& Beam
not a software program. bim is a process that is enabled by technology and software.
8/14/2021 12:50:54 13 / 20 Devansh Chauhan Quantity Survey Request for information Top of steel/slab Finish floor level Structural slab level Rectangular hollow sections All Of The Above Bolted connection Building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above It is between 26.7 to 35 degrees Celsius (Opposite length/width) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover, Diameter 1440 Maitri mandir ,Aurovile Column & Beam Process
8/14/2021 12:51:45 13 / 20 Chaitrali Anil Pardeshi Quantity Survey request for information top of slab finished floor level structural slab level rectangular hollow sections All Of The Above rivet building information modelling
Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 26.7°C - 35°C. (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top Cover 1440 Matrimandir Column & Beam process
8/14/2021 12:52:40 13 / 20 Tanuj narendra narad Quantity Survey request for information theory of structure finished floor level structural slab level rectangular hallow section All Of The Above angle section building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.8 gold sphere Column & Beam process
8/14/2021 12:55:36 13 / 20 Som Verma Quantity Survey request for information terms of service FINISH FLOOR LEVEL structure surface level rectangular hollow sections All Of The Above double web angle connection Building Information Modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440 matrimandir None process
8/14/2021 13:00:31 13 / 20 Akhilesh Gautam Quantity Survey request for information term of service finish floor level structural slab level rectangular hollow section All Of The Above horizontal building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7 to 35 (Opposite length/spacing) + 1 900 375 BAGS Diameter 1440 Matrimandir Column & Beam process
8/14/2021 13:02:22 13 / 20 Bal Ram Ghimire Curtain Walls In Revit request for information top of steel finished floor level Structure slab level rectangular hollow sections All Of The Above connecting angles building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7°-35° (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1.2 auroville gold golden dome Column & Beam software
8/14/2021 13:08:34 13 / 20 Suraj Kumar Yadav Quantity Survey request for information top of steel floor finish level structural slab level rectangular hollow sections All Of The Above end moment connection building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7 to 35 (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1.226 al dar headquarters None Process
8/14/2021 13:08:39 13 / 20 MD ABID AHMAD Quantity Survey request for information top of slab finish floor level structural slab level rectangular hollow section All Of The Above welded building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35c° (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 94 Global structure Column process
8/14/2021 13:09:18 13 / 20 Sanket Shahaji Patil ETABS request for information top of slab finish floor level structure surface level rectangular hollow section All Of The Above bolted framed steel beam connection building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7-35 (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover, Diameter 40.8 matrimandir Column & Beam process
8/14/2021 13:10:05 13 / 20 ATUL AGRAWAL Quantity Survey request for information top of slab/steel finish floor level structural slab level rectangular hollow section All Of The Above bolted connection building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7 - 35°c (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 42.6 gunzghao Column & Beam process
8/14/2021 13:11:58 13 / 20 Ali Shaikh Quantity Survey Request for information Top of slab Finish floor level Structural slab level Rectangular hollow section All Of The Above 90 degree angle connector bracket Building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1.226 matrimandir Column & Beam Software
8/14/2021 13:12:26 13 / 20 SHAH FAISAL JAMAL ETABS request for information top of slab Finished floor level structural slab level rectangular hollow sections All Of The Above frame beam connection building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Duck Framed Roof, Indigo Roof, Belli Roof All Of The Above 45-50 degree (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440 Oven gold building Beam Process
8/14/2021 13:16:04 13 / 20 Anish Kumar Quantity Survey request for information construction finished floor level structural slab level rectangular hollow section All Of The Above bolte connection building information molding
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 27-35 (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top Cover 400 matrimandir Column & Beam process
8/14/2021 13:16:55 13 / 20 MD ABID AHMAD Quantity Survey request for information top of slab finish floor level structural slab level rectangular hollow section All Of The Above welded building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35c° (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 94 global structure Column process
8/14/2021 13:23:58 13 / 20 Srivalli Lankisetti Quantity Survey request for information top of steel finish floor level structural surface level rectangular hollow section All Of The Above bolt connection building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Bottom Cover 42.6 matrimandir Column & Beam process
8/14/2021 13:26:34 13 / 20 ADARSH M Quantity Survey request for information top of slab finished floor level structural slab level rectangular hollow section All Of The Above seat angle connection building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.7 matrimandir Column & Beam software
8/14/2021 13:29:23 13 / 20 Vishwajeet Kashyap ETABS request for information theory of structures floor finish level structure surface level rectangular hollow sections All Of The Above unistrut 90 degree bracket building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.8 matrimandir Column & Beam process
8/14/2021 13:30:30 13 / 20 Dhanraj Kumar Quantity Survey request for information top of concrete finish floor level structural slab level rectangular hollow section All Of The Above seat angle connection building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 c (Opposite length/spacing) + 1 900 374 BAGS Diameter 40.8 Matrimandir Column & Beam process
8/14/2021 13:31:57 13 / 20 Himanshu Patil Quantity Survey request for information top of steel/slab finish floor level structure surface level rectangular hollow sections All Of The Above unistrut building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above maximum limit between 26.7°C and 35°C (Opposite length/width) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1.2 matrimandir Column & Beam bim is a software
8/14/2021 13:35:48 13 / 20 GANESH KARMAKAR Quantity Survey request for information Top of slab finish floor level structural slab level rectangular hollow section All Of The Above Seat connection building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.8 auroville mothers earth temple Column & Beam process
8/14/2021 13:36:16 13 / 20 HEMIN D PATEL Quantity Survey request for information top of steel finish floor level structural slab level rectangular hollow section All Of The Above bolted seated steel beam connection building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35°c (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1.226 Matrimandir Column & Beam software
8/14/2021 13:39:59 13 / 20 Parth nilkanth auti Quantity Survey request for information theory of structure finish floor level structural slab level rectangular hollow sections All Of The Above flange connection building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 94 matrumandir Beam process
8/14/2021 13:42:55 13 / 20 Rajesh Pradhan Quantity Survey request for information top of steel / slab finished floor level structure surface level rectangular hollow sections All Of The Above unistrut building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7°C - 35°C (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1.2 matrimandir Column & Beam a process
8/14/2021 13:53:02 13 / 20 Aftab Alam Ansari ETABS request for information theory of structure floor finishing level structural slab level rectangular hollow section All Of The Above bolted connection Building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26 to 35 (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 35.314 dome shape building Column & Beam process
8/14/2021 13:54:56 13 / 20 Aman Kumar Quantity Survey request for information top of slab finish floor level structural slab level rectangular hollow section All Of The Above 90 degree fitting building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above between 26.7°C to 35°C (Length/spacing) + 1 900 kg 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.7 matrimandir Column & Beam process
8/14/2021 13:57:58 13 / 20 BHANU PRATAP YADAV Quantity Survey request for information term of service finished floor level structural slab level rectangular hollow section All Of The Above seat angle Building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 89.8 matrimandir Column process
8/14/2021 13:58:32 13 / 20 Vaibhav Quantity Survey request for information terms of service finished floor level structure surface level rectangular hollow sections All Of The Above bolted seated steel beam connection (seat angle) building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Opposite length/spacing) + 1 774 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1.226 matrimandir None process
8/14/2021 14:03:10 13 / 20 Ganesh Raghunath Narayankar Quantity Survey request for information top of steel or slab finish floor level structure surface level rectangular hollow sections All Of The Above unistrut building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 85-90 (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.7 auroville mothers earth temple None process
8/14/2021 14:12:27 13 / 20 SHUBHAJIT BISWAS Quantity Survey request for information top of slab finish floor level structure surface level rectangular hollow sections All Of The Above seat connection building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above between 26.7 to 35 degree celsius (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.6 matrimandir Column & Beam a process
8/14/2021 14:32:45 13 / 20 Gautam Chaurasia ETABS request for information top of steel finished floor level structure surface level rectangular hollow sections All Of The Above bolted connection Building Information Modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.1 no idea Beam process
8/14/2021 14:44:02 13 / 20 Sarfaraz Beskar Curtain Walls In Revit Request for information Theory of structure Finish floor level Structural slab level Rectangular hollow section All Of The Above 2 hole 90° fitting Building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26° C to 35°C (Opposite length/spacing) + 1 900kg 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.7 Auroville Golden Globe Column & Beam Process
8/14/2021 14:45:13 13 / 20 Saurin Khanolkar Quantity Survey request for information top of structure or top of steel finish floor level structural slab level rectangular hollow section All Of The Above single plate angle connection building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 degree celsius (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.7 the big golden ball, auroville None process
8/14/2021 14:55:59 13 / 20 DANISH NIHAL ETABS request for information top of slab finished floor level structural slab level rectangular hollow section All Of The Above beam to column connection building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 degree Celsius (Length/spacing) + 1 900kg 374 BAGS Depth of Slab or Beam Minus Bottom Cover 40.8 matrimandir Column & Beam Process
8/14/2021 14:58:50 13 / 20 Raja Sambare Quantity Survey request for information top of steel finished floor level structural slab level rectangular hollow sections All Of The Above two hole 90 degree fitting bracket building information modelingBatching, Mixing, Placement, Batching and CompactingGable Roof, Gambrel Roof, Shed Roof All Of The Above 35 c (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440 matrimandir auroville Column process
8/14/2021 15:13:14 13 / 20 Sanjay Kamdar Quantity Survey Request for information Terms of service Finished floor level Structural slab level Rectangular hollow section All Of The Above Cleat angle Building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.781 Round None Process
8/14/2021 15:15:10 13 / 20 shaik Ghouse ETABS request for information top of steel finished floor level structure surface level rectangular hollow sections All Of The Above bolted connection building information modelling finishing Gable Roof, Gambrel Roof, Shed Roof All Of The Above 30 120 (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1.26 matrimandir Column process
8/14/2021 15:17:47 13 / 20 Seikh Nazir Hossain ETABS request for information theory of structure finished floor level structural slab level rectangular hollow sections All Of The Above stiffened seat connection building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 29 (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.8 matrimandir None software
8/14/2021 15:28:02 13 / 20 Aman Thakur Quantity Survey request for information terms of service finished Floor level structural slab level rectangular hollow section All Of The Above Unistrut building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7 to 35 (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440 matrimandir None process
8/14/2021 15:32:08 13 / 20 NIKHIL ANAWADIYA Quantity Survey request for information theory of structures finish floor level structural slab level rectangular hollow sections All Of The Above unstiffened bolted seat connection building Information modeling
Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 35°c (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1.2 no Column & Beam process
8/14/2021 15:36:42 13 / 20 irshad hussain kakati ETABS request for information top of slab finished floor level structural slab level rectangular hollow section All Of The Above rivet joint building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Opposite length/spacing) + 1 900 375 BAGS Diameter 1506 museum Column & Beam process
8/14/2021 16:11:57 13 / 20 Sajjad Alam Quantity Survey request for information terms of service finish floor level structural slab level rectangular hollow section All Of The Above beam to column connection building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 2400 Not known Column & Beam process
8/14/2021 16:17:18 13 / 20 Kiran R S Quantity Survey request for information top of steel/top of slab finished floor level structure surface layer rectangular hollow sections All Of The Above seat connection building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above between 26.7°C to 33°C (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440 matrimandir Column process
8/14/2021 17:01:11 13 / 20 Vipulkumar Quantity Survey request for information top of steel finished floor level structural slab level rectangular hollow sections All Of The Above Tie building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7 to 35 (Length/spacing) + 1 900 375 BAGS Diameter 1440 matrimandir None process
8/14/2021 17:03:33 13 / 20 ASHWINI MARUTI POKHARKAR Quantity Survey Request for information Top of steel finished floor level Structural slab level Rectangular hollow section All Of The Above Connection plate Building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above Between 26°c and 35°c (Length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 94 Auroville matri mandir None Process
8/14/2021 17:21:23 13 / 20 Shubhranshu Sekhar Biswal Quantity Survey request for information tof of steel finished floor level structural slab level rectangular hollow sections All Of The Above bolted connection building information modelling batching, mixing, transportation, compaction, curing
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35degree celcius (Length/spacing) + 1 900kg 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 42.7 matrimandir Column & Beam process
8/14/2021 17:21:36 13 / 20 Kamal Kishore ETABS request for information top of slab finished floor level structural slab level rectangular hollow section All Of The Above Bolted connection building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35°C (Length/spacing) + 1 900
8/18/2021 10:26:21 12 / 20 Sadan Sattar ETABS request for information terms of service federal firearms license secure sockets layer right hand side All Of The Above unistrut p1026 90° angle bracket building information modeling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above between 26.7 and 35 (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 42.6 matrimandir Column & Beam software
8/18/2021 12:11:30 12 / 20 Maaz Hussain Quantity Survey request for information theory of structure finish floor level structure slab level rectangular hollow section All Of The Above unistrut building information modeling
Batching, Mixing, Transporting, Placement and CompactingDuck Framed Roof, Indigo Roof, Belli Roof All Of The Above 35 (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440 matrimandir Column & Beam software
8/18/2021 12:21:57 12 / 20 Abdul aamer ETABS request for information top of slab or steel finished floor level structure surface level rectangular hallow section All Of The Above bolted connection building information modeling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.7 gold dome building None process
8/18/2021 12:28:53 12 / 20 Mitesh thakkar ETABS Request for information Top of slab Finish floor level Structure surface level Rectangular hollow section All Of The Above Beam to column connection Building information modelling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 celcius (Opposite length/spacing) + 1 900 kg 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.7 Auroville golden globe tamilnadu Column & Beam Process
8/18/2021 14:15:36 12 / 20 Pravin Ray Quantity Survey request for information top of steel, top of slab, top of structure, theory of structure finished floor level structure slab level rectangular hollow section All Of The Above unistrut p1026 90° angle bracket building information modelling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35°c (Opposite length/spacing) + 1 900kg 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.7 auroville matrimandir Column & Beam process
8/18/2021 15:13:16 12 / 20 Ravi Prakash Quantity Survey Request for information Top of steel/slab Finish floor level Structure surface level Rectangular hollow sections All Of The Above Bolt connection Building information Modelling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7 to 35 degree celcious (Opposite length/spacing) + 1 900 kg 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440 Auroville Column & Beam Process
8/18/2021 20:10:12 12 / 20 Mohd Nouman Quantity Survey request for information top of slab finish floor level structural slab level rectangular hollow section All Of The Above Bolted connection Building information modeling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 70°C (Opposite length/spacing) + 1 900 374 BAGS Diameter 40.7 matrimandir Column process
8/18/2021 20:33:27 12 / 20 Swagata Ghosh Quantity Survey request for information theory of structure finished floor level structure surface level rectangular hollow section All Of The Above simple column to beam shear steel connection with cleat angle building information modeling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26-35 (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1 matrimandir Beam process
8/19/2021 11:05:58 12 / 20 Emran ahmed Quantity Survey request for information Top of slab finish floor level structural slab level rectangular hollow section All Of The Above Right angle steel corner connection building information modelling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7 °c-35°c (Opposite length/spacing) + 1 900kg 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.8 kg/ft3 golden dome building None process
8/19/2021 11:12:33 12 / 20 Mritunjay sharma ETABS Request for information Theory of structure Finished floor level Structural slab level Rectangular hollow section All Of The Above Bolted seated connection Building information modelling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26°C to 35°C (Length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 35.31 Golden ball building,matrimandir Column & Beam Process for creating construction project
8/19/2021 11:48:46 12 / 20 Ashutosh ETABS request for information theory of structure finish floor level structural floor level rectangular hollow section All Of The Above fixed building information modeling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.7 dome shaped Column & Beam process
8/19/2021 12:20:19 12 / 20 Dillip bhujabala ETABS request for information terms of service Finish floor level Structure slab level Right hand side All Of The Above Unistrut Building information modeling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26°c and 35°c (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 94 Captionaless Column & Beam process
8/19/2021 13:34:21 12 / 20 MOAAZ BIN ASHFAQUE Quantity Survey request for information theory of structure finish floor level structural slab level rectangular hollow section All Of The Above unistrut building information modeling
Batching, Mixing, Transporting, Placement and CompactingDuck Framed Roof, Indigo Roof, Belli Roof All Of The Above 35 (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440 mantrimandir Column & Beam software
8/19/2021 13:41:06 12 / 20 Yoginder Quantity Survey request for information table of specification finished floor level structural slab level rectangular hollow sections All Of The Above unistrut p1026 building information modeling
Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 35 (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 68.03 matrimandir None software
8/19/2021 13:43:52 12 / 20 Sahil Ilyas Ahmad Quantity Survey request for information theory of structure finish floor level structural slab level rectangular hollow section All Of The Above a1026- 2 hole 90° fitting building information modeling
Batching, Mixing, Transporting, Placement and CompactingDuck Framed Roof, Indigo Roof, Belli Roof All Of The Above 95°f (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1.226 Matrimandir Column & Beam process
8/19/2021 14:12:35 12 / 20 Yogesh Gajanan Bedre ETABS Request for information Theory of structure Finished floor level Structural slab level Rectangular hollow section All Of The Above Seat angle Building Information Modelling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 160°F (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1.226 BIM or Building Information Modelling
Assemblyisbuilding
a process for creating and managing informationColumn
on a construction
& Beam project across the project lifecycle. One of the key outputs of this process is the Building Information Model, the digital description of every aspect of the built asset.
8/19/2021 14:16:15 12 / 20 Abhishek Pisal Quantity Survey request for information top of slab finish floor level structural slab level rectangular hollow section All Of The Above unistrut p1026eg building information modeling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 70 (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440 matri mandir meditation center None process
8/19/2021 16:43:05 12 / 20 Nachiket Yadnik Quantity Survey request for information top of steel or slab finish floor level structure surface level rectangular hollow sections All Of The Above bolted connection building information modeling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 10℃ to 32℃ (Length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 69.16 matrimandir, aurovile Beam process
8/19/2021 17:49:35 12 / 20 Biswajit Addhya Quantity Survey request for information terms of service finished floor level structural floor level rectangular hollow section All Of The Above cleat angle building information modeling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Opposite length/spacing) + 1 864 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.7 matrimandir Column process
8/19/2021 19:33:49 12 / 20 Abdul mubeen ETABS request for information top of slab or steel finished floor level structure surface level rectangular hallow section All Of The Above Bolt connection building information modeling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.7 gold dome building Beam process
8/19/2021 19:55:33 12 / 20 MALIGIREDDY MOHAN REDDY ETABS request for information top of structure finished floor level structure surface level rectangular hollow section All Of The Above braced connection building information modelling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7-35 (Opposite length/spacing) + 1 8825.98 375 BAGS Depth of Slab or Beam Minus Top Cover 40.8 closed structure Column & Beam process
8/19/2021 21:01:47 12 / 20 Sandeep Dey ETABS request for information theory of structure finished floor level structural slab level rectangular hollow section All Of The Above unistrut 90 p1026 building information modeling
Batching, Mixing, Transporting, Placement and Compacting Sawer Roof, Skillet Roof, Domer Roof All Of The Above 35 (Length/spacing) + 1 900 375 BAGS Diameter 40.7 matrimandir Column & Beam process
8/14/2021 11:23:16 11 / 20 Arshad Kalim ETABS request for information theory of structure finished floor level structure surface level rectangular hollow sections All Of The Above bolted connection building information modeling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 19 c (Opposite length/width) + 1 900 375 BAGS Diameter 1506 Golden round temple Column & Beam Process
8/14/2021 11:28:03 11 / 20 ravi shrivastava ETABS request for information theory of structure finish floor level structural slab level rectangular hollow section All Of The Above bolted connection building information modeling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Length/spacing) + 1 900 375 BAGS Diameter 50846.4 matrimandir Column process
8/14/2021 11:31:18 11 / 20 Himanshu Gorle ETABS request for information terms of service fedral firearms license secure sockets layer right hand side All Of The Above bolted framed steel beam connection building information modelling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 27° to 35°c (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440 Lotus temple Column & Beam It is process
8/14/2021 11:33:51 11 / 20 Shubham Curtain Walls In Revit request for information theory of structure finished floor level structure surface level rectangular hollow sections All Of The Above unstiffened seated connection building information modeling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above between 26.7c and 35c (Length/spacing) + 1 900kg Depth
374 BAGS
of Slab or Beam Minus Top Cover, Depth of Slab or Beam Minus Top & Bottom Cover, Depth of Slab or Beam Minus Bottom
1.226 Cover, Diameter matrimandir Column & Beam process
8/14/2021 11:35:08 11 / 20 Khan Mohammed siraj ETABS Request for information Top of steel Finish floor level Structure slab level Rectangular hollow section All Of The Above Angle bolt joint Building information modelling
Batching, Mixing, Transporting, Placement and CompactingDuck Framed Roof, Indigo Roof, Belli Roof All Of The Above 32 degree (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 35.31 Doom building Column Process
8/14/2021 11:38:26 11 / 20 Ritesh Patle Quantity Survey request for information top of slab finish floor level structure surface level rectangular hollo section All Of The Above 2 hole 90 degree fitting building information modeling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1.2 auroville golden globe Column & Beam process
8/14/2021 11:40:59 11 / 20 Navneet Kallapalli Quantity Survey request for information theory of structure finish floor level structural slab level rectangular hollow section All Of The Above bolted connection building information modelling batching, mixing, transporting, placement, curingGable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440 auroville golden globe Beam process
8/14/2021 11:47:11 11 / 20 Amod Kumar Yadav ETABS request for information terms of service Federal Firearms License secure sockets layer right-hand side All Of The Above bolted framed steel connection building information modelling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35° (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440 matrimandir building information modelling
Noneis a process for creating and managing information on a construction project across the project lifecycle
8/14/2021 11:49:48 11 / 20 Abdul Karim Curtain Walls In Revit Request for information Terms of service Floor finishing level Structure surface level Rectangular hollow section All Of The Above Angel Building information management
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 27 (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 94 No Column & Beam Process
8/14/2021 11:58:22 11 / 20 Satyam kumar Quantity Survey request for information top of steel finished floor level structure surface level rectangular hollow section All Of The Above l joint building information modeling
Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 30 (Length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440 matrimandir None process
8/14/2021 12:02:31 11 / 20 Ashutosh Kumar ETABS request for information top of sleeve finish floor level structural floor level rectangular hollow section All Of The Above beam to column building information modeling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 42.6 Matrimandir Column & Beam process
8/14/2021 12:04:24 11 / 20 Angshuman Debnath ETABS request for information terms of service finished floor level structure surface level rectangular hollow sections All Of The Above welded connection building information modelling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.78 Dome Column software
8/14/2021 12:04:26 11 / 20 Parth parmar ETABS request for information top of steel/slab finish floor level structural slab level rectangular hollow section All Of The Above bolted connection building information modeling
Batching, mixing, transporting, placement, compacting,GablecuringRoof, Gambrel Roof, Shed Roof All Of The Above 35°C (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.8 The Matrimandir process None
for creating and managing information on a construction project across the project lifecycle
8/14/2021 12:04:27 11 / 20 Lakshmi Menon ETABS request for information theory of structures finish floor level structure slab level rectangular hollow sections All Of The Above bolted cleat connection building information modellingbatching , mixing , transportation, compacting, curing Gable Roof, Gambrel Roof, Shed Roof Scaffold and Trench collapse 35°c (Opposite length/spacing) + 1 120 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.8 matrimandir None software
8/14/2021 12:08:04 11 / 20 Vivek Pratap Singh Quantity Survey Request for information Top of structure Finish floor level Structural slab level Rectugular hollow section All Of The Above Unistrut Building information modeling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7 to 35 (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 35.31 Matrimandir None Software
8/14/2021 12:10:47 11 / 20 Syed Sameer Quantity Survey request for information top of steel/slab finish floor level structure surfaces level rectangular hollow section All Of The Above bolted connection building information modelling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7°cand 35°c (Length/spacing) + 1 900kg 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1506 kg per cubic meter matrimandir
bim is a process supported by various tools, technologies
Column &andBeamcontracts involving the generation and management of digital representations of physical and functional characteristics of places
8/14/2021 12:13:19 11 / 20 vishal pandit Quantity Survey Request for information Top of slab Finish floor level Structure surface level Rectangular hollow section All Of The Above Unistrut Building information modeling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.5- 35 (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top Cover 1.26 Matrimandir Column & Beam Process
8/14/2021 12:16:31 11 / 20 Shubham ade ETABS request for information theory of structure finish floor level structural slab level rectangular hallow section All Of The Above bolted connection building information modelling Batching, Mixing, Transporting, Compacting , curing Gable Roof, Gambrel Roof, Shed Roof All Of The Above 27 to 35 (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 89.99 Auroville mother temple hill Column Process
8/14/2021 12:18:52 11 / 20 Mohit Yadav ETABS Request for information Terms of service Finished floor level Structural slab level Rectangular hollow sections All Of The Above Bolted steel beam connection Building information modelling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof Scaffold and Trench collapse ASTM C 1064-86 set a maximum limil between 26.7degree Celsius and 35 degree Celsius (Opposite length/spacing) + 2 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440kgs/m3 Matrimandir Beam Building information modelling is a process
8/14/2021 12:23:30 11 / 20 Ajay p gaikwad Quantity Survey Request for information Theory of structure Finish floor level Structural slab level Rectangular hollow section All Of The Above T channel connection with bolt Building information modeling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Length/spacing) + 1 900 402 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 35.31 Thermal plant Column & Beam Process
8/14/2021 12:24:47 11 / 20 Tushar Patil Quantity Survey Request For Information Top of Steel Finished floor level Structural Slab Level Rectangular Hollow Sections All Of The Above 2 hole 90degree angle Building information modeling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above between 26.7°C and 35°C (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440kgs/m3 Matrimandir Column & Beam Process
8/14/2021 12:44:08 11 / 20 Hamza Usman Quantity Survey Request for information Theory of structure Finish floor level Sub soil level Rectangular hollow section All Of The Above Flange Building information modelingFl
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 32 (Opposite length/spacing) + 1 900 kg 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 35.3147⁵ Auroville Temple Column & Beam Software
8/14/2021 12:44:43 11 / 20 GURDEEP Quantity Survey request for information top of slab finish floor level structural slab level rectangular hollow section All Of The Above bolted frame connection building information modelling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7°c to 35°c (Length/spacing) + 1 900 375 BAGS Diameter 1.25cft auroville Beam process
8/14/2021 12:46:09 11 / 20 Sonam sahani Quantity Survey rest for information fir term of service finished floor level secure scokets layer hypotheses All Of The Above bolt connection building information modelling
Compacting, Mixing, Placement, Batching and Transporting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 70-80 (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1 Global celebs Column & Beam Process
8/14/2021 12:46:18 11 / 20 Ankush singh negi Quantity Survey Request for information Theory of structure Finish floor level Structure surface level Rectangular hollow section All Of The Above Unistrut Buildings information modelling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26 degree to 35 degree (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 34.328 Auroville Mothers Earth Temple Column & Beam Process
8/14/2021 12:50:05 11 / 20 Bhavya Patel ETABS Request for information Top of slab Finished floor level Structure surface level Rectangular hollow sections True Slump Bolted frame connection Building Information and modeling
Batching, Mixing, Placement, Batching and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 35.3 Matrimandir Column & Beam Process
8/14/2021 12:54:06 11 / 20 Archana Motilal Fulbariya Quantity Survey request for information top of slab finished floor level structural slab level rectangular hollow section All Of The Above bolted connection building information modelling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Length/spacing) + 1 900 400 BAGS Depth of Slab or Beam Minus Bottom Cover 1440 auroville mother's earth temple Column & Beam process
8/14/2021 12:54:34 11 / 20 Akshay Singh Quantity Survey request for information top of steel/slab finished floor level structural slab level or structure surface level rectangular hollow section All Of The Above 90° fitting unistrut building information modeling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7° to 30° celcius (Opposite length/spacing) + 1 900kg 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1.226 cft matrimandir None process
8/14/2021 12:55:56 11 / 20 Chaitanya Sujit naik Quantity Survey Request for information Top of steel/slab Finish floor level Structural slab level Rectangular hollow section All Of The Above Gusset plates Building information modelBatching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 27 degree to 35 degree (Length/spacing) + 1 900 375 BAGS Diameter 35.3 cubic feet matrimandir None process
8/14/2021 13:00:55 11 / 20 Sumit Gole Quantity Survey request for information theory of structure finished floor level Structural slab level rectangle hollow section All Of The Above Bolted building information modelling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 70 degree (Opposite length/spacing) + 1 900 kg 375 BAGS Depth of Slab or Beam Minus Top Cover 1440kgs/m3 matrimandir Column Software
8/14/2021 13:01:26 11 / 20 Saurabh Gajanan Modak Curtain Walls In Revit request for information theory of structural first floor level structural slab level rectangular hollow section All Of The Above bolt connection building information modeling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 32 (Opposite length/spacing) + 1 900 375 BAGS Diameter 40.8 matrimandir Column BIM is a process
8/14/2021 13:05:07 11 / 20 Kajol Chauhan Quantity Survey request for information Term of service finished floor level structural slab level rectangular hollow section All Of The Above Bolted connection building information modelling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7 to 35 (Opposite length/spacing) + 1 0.6246 375 BAGS Diameter 1.2 Matrimandir Column Process
8/14/2021 13:06:34 11 / 20 Arnab Das Quantity Survey Request for information Top of slab First floor level Structural slab level Rectangular hollow section All Of The Above Riveting Building information modeling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 degree centigrade (Opposite length/spacing) + 1 900 kgs 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440 No idea Column & Beam Process
8/14/2021 13:08:25 11 / 20 Rahil Chougle ETABS request for information theory of structure finish floor level structural slab level rectangular hollow section All Of The Above cleat angle building information modeling
batching, mixing, transporting, placement, compacting and curing None Of The Above All Of The Above 35 (Length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.7 matrimandir Column & Beam process
8/14/2021 13:11:26 11 / 20 Pankaj Sarkar Curtain Walls In Revit request for information top of steel finish floor level structure surface level rectangular hollow section All Of The Above v shape joint building information modeling
Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above C94 (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 41 Building information modeling
Aurovilleisgolden
a process
globe
for creating and managing information on a construction
None project across the project lifecycle.one the key out puts of the process is the building information modeling,the digital description of every aspect of the build asset .
8/14/2021 13:14:41 11 / 20 Niranajan Jadhav Quantity Survey request for information theory of structure finish floor level Structural slab level rectangular hollow section All Of The Above Bolted welded connection Building information modeling
Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 35 (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.7 gold ball structure None process
8/14/2021 13:15:09 11 / 20 Shoaib Quantity Survey request for information top of steel finish floor level structure surface level rectangle hollow section All Of The Above strut joint building information modelling
Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 95° F (Opposite length/spacing) + 1 900 375 BAGS Diameter 35.31 matrimandir Column Software
8/14/2021 13:17:28 11 / 20 Nitish kumar gupta Quantity Survey request for information top of slab finished floor level Structure surface level rectangular hollow section All Of The Above riveted joint building information modelling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7to 35 (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 35.31 maatri mandir None process
8/14/2021 13:19:34 11 / 20 Shubham Quantity Survey request for information top of steel/slab finish floor levelffl structural floor levelsfl rectangular hollow sections All Of The Above bolted connection building information modelling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 32 (Length/spacing) + 1 900kg 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 35.3 sorry building information Column
modelling
& Beam
is a process for creating and managing information on a construction project across the project lifecycle
8/14/2021 13:21:10 11 / 20 Biranchi Swain Quantity Survey Preliminary documents used by company Top of steel Finish floor level Structure surface level Rectangular hallow section All Of The Above Butt joint Building information modeling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440 Doughnut Column & Beam Software
8/14/2021 13:23:15 11 / 20 ARUN KUMAR AGARWAL Quantity Survey request for information theory of structure finished floor level structure surface level rectangular hollow sections All Of The Above revited connections Building Information Modeling
Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 60 (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 35.3 circular Column Process
8/14/2021 13:24:09 11 / 20 Amit kumar Quantity Survey request for information Top of steel Finish floor level Structural slab level Rectangular hollow section All Of The Above Bolted frame connection building information modelling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7 degree Celsius to 35 degree celcius (Length/spacing) + 1 900kg 375 BAGS Diameter 94lb/ft3 Golden DOM building Column & Beam Software
8/14/2021 13:24:40 11 / 20 Prabhakar kumar Quantity Survey Request for information Theory of structure Finish floor level Structural slab level Rectangular hollow section All Of The Above Welding Building information modelling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 27 (Length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Bottom Cover 35 Dom Column & Beam Training
8/14/2021 13:24:45 11 / 20 Rajat Chandrakar Quantity Survey request for information top of steel finished floor level structural surface level rectangular hollow sections All Of The Above bolted frame steel connections building information modelingbatching, mixing, transporting, compacting, leveling, curing
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover, Depth of Slab or Beam Minus Bottom Cover 40.8 Matrimandir None process
8/14/2021 13:25:17 11 / 20 Avik Seal Quantity Survey Request for information Terms for Service Federal Firemarms License Hyper texr transfer protocol Rectangular gollow section All Of The Above Angle Building information modelling Tempering , curing Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7c - 35 c (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 35.317 The Matrimandir in auroville Column & Beam Process
8/14/2021 13:26:16 11 / 20 Hamed khan Quantity Survey Request for information Top of steel Floor finish level Structure surface level Rectangular hollow section All Of The Above Cleat angle Building information modeling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 95F (Opposite length/spacing) + 1 900kg 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1.2cft Don't no Column & Beam Process
8/14/2021 13:27:51 11 / 20 Swapnil Zalte ETABS request of information terms of services finished floor level structure surface level rectangular hollow section All Of The Above bolted connection building information modelling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above between 26.7°c to 35°c (Opposite length/spacing) + 1 900kg 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 39.6 kg per cubic feet matrimandir None process
8/14/2021 13:28:37 11 / 20 Vaibhav borane Quantity Survey request for information theory of structure finish floor level structural slab level rectangular hollow section All Of The Above seat angle building information modeling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440kg Auroville Matrimandir None software
8/14/2021 13:34:04 11 / 20 G Dhananjayulu Quantity Survey request for information top of slab finished floor level structural slab level right hand side All Of The Above plate welded joint building information modeling
Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 10 to 32 (Opposite length/spacing) + 1 900 375 BAGS Diameter 40.32 golden circular building Column & Beam process
8/14/2021 13:35:15 11 / 20 Hare Ram Sah Quantity Survey request for information tape operating system federal firearms licence secure sockets layer right angle hypotenuse-side All Of The Above welded connection building information modelling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7-35 (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440 auroville mother's earth temple Column & Beam process
8/14/2021 13:38:57 11 / 20 Avik Seal Quantity Survey request for information terms of service federal firemas license sequre socket layer rectangular hollw section All Of The Above angle building information modelling
tempering ,curing , shuttering , vibreting , covering , admixing
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7-35 (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 35.317 Matrumandir in aurville Column & Beam process
8/14/2021 13:42:06 11 / 20 Md Mustakim Khan ETABS request for information thoracic outlet syndrome federal firearms license secure sockets layer royal horticultural society All Of The Above single moment connection building information modeling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 36 (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440 golden temple Column & Beam process
8/14/2021 13:42:40 11 / 20 Shah Faisal Quantity Survey request for information theory of structure and top of slab finish floor level structural slab level rectangular hollow section All Of The Above cleat angle connection building information modelling
batching mixing transportation compaction levelling curing
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 27 and 35degree (Length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440 golden ball building tamil nadu auroville Column & Beam software
8/14/2021 13:45:49 11 / 20 RAVI RANJAN SINGH Quantity Survey request for information top of slab finished floor level structural slab level rectangular hollow section All Of The Above unistrut 90 degree angle fitting with 2 hole building information modelling Batching, mixing,transportation, compaction,curing Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7°c and 35°c (Opposite length/spacing) + 2 90 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1.2 Auroville mothers earth temple Column & Beam process
8/14/2021 13:46:05 11 / 20 SUNNY KUMAR Quantity Survey request for information top of slab finished floor level structural slab level rectangular hollow section All Of The Above Unistrut 90 degree angle fitting with 2 holes building information modelling Batching,mixing, transportation,compaction,curing Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7°c and 35°c (Opposite length/spacing) + 2 90 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1.2 Auroville mothers earth temple Column & Beam process
8/14/2021 13:46:14 11 / 20 Raja Gupta ETABS Request for information Top of steel Finish floor level Structure surface level Rectangular hollow section All Of The Above L-joint Building information modeling
Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 26.7° (Opposite length/spacing) + 1 900kg 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 0.04077 Auroville pondicherry Column & Beam Process
8/14/2021 13:50:06 11 / 20 Santosh Kumar Singh Quantity Survey request for information terms of service finish floor level structure surface level rectangular hollow sections All Of The Above seat angle building information building
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above between 26.7°C and 35°C (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1.226 Matrimandir None software
8/14/2021 13:50:25 11 / 20 Shruti Rajendra Khakse ETABS request for information terms of service federal firearms license secure sockets layer rectangular hollow sections All Of The Above bolt connection building information modeling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 degree Celsius (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1.226 the matrimandir in auroville,tamil nadu None Process
8/14/2021 13:54:25 11 / 20 Damendra Shrivas Quantity Survey request for information top of steel Finished floor level Structure slab level Rolled hollow section All Of The Above Bolted angle connection Building information modeling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 10 to 30 (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440 Golden dome Beam Process
8/14/2021 13:55:00 11 / 20 Abhinav kamble ETABS reflective foil laminate heory of structure finish floor level structural slab level rectangular hollow structure All Of The Above coloumn beam connection building information modelling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 10 to 30 (Length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Bottom Cover 94 Don't know Column & Beam process
8/14/2021 13:59:20 11 / 20 Yogesh Chaudhari Quantity Survey request for information top of steel / slab finish floor level structural floor level rectangular hollow sections All Of The Above Can't say building information modelling
Batching, Mixing, Transporting, Placement and CompactingDuck Framed Roof, Indigo Roof, Belli Roof All Of The Above 26.7° to 35° (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Bottom Cover 432.6 Can't say Column & Beam Process
8/14/2021 14:00:05 11 / 20 Vishwajeet Kashyap ETABS request for information theory of structures floor finish level structure surface level rectangular hollow section All Of The Above Unistrut 90 degree bracket building information modeling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.8 matrimandir None process
8/14/2021 14:03:40 11 / 20 Chaitra Naik Quantity Survey request for information top of slab finish floor level structure surface level rectangular hollow sections All Of The Above Bolted connection building information modelBatching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 35.315 gold dome building Beam software
8/14/2021 14:11:08 11 / 20 Ayush Jain ETABS request for information top of slab finished floor level structural slab level rectangular hollow section All Of The Above column to beam (web) building information modelling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7°C to 35°C (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top Cover 1440 auroville golden globe None process
8/14/2021 14:12:26 11 / 20 BANDLA HARIKRISHNA ETABS request for information top of steel finished floor level structure surface level rectangular hollow section All Of The Above bolted framed steel building information modelling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 27 to 35 (Opposite length/spacing) + 2 900 375 BAGS Depth of Slab or Beam Minus Top Cover 1506 mantrimandir None process
8/14/2021 14:15:01 11 / 20 Sree Prasad ETABS request for information top of slab finish floor level structure surface level rectangular hollow section All Of The Above angular connection building information modeling
Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 32 (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Bottom Cover, Diameter 1440 don't know Column & Beam process
8/14/2021 14:22:49 11 / 20 Jaffar Rashid ETABS request for information theory of structure finished floor level structure surface level rectangular hollow section All Of The Above unistrut building information mod6Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.5 degree to 35 degree celsius (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.7 don't know None process
8/14/2021 14:24:27 11 / 20 Manoj prasad Quantity Survey Request for information Theory of structure Finish floor level Structure surface level Rectangular hollow section All Of The Above Bolted connection Building information modelling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26 (Length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 50000 Golden ball Column & Beam Software
8/14/2021 14:24:39 11 / 20 SATYAJIT ROY Quantity Survey request for information theory of structure finished floor level structure surface level rectangular hollow section All Of The Above angle building information modelling
Batching, Mixing, Transporting, Placement and CompactingDuck Framed Roof, Indigo Roof, Belli Roof All Of The Above 35 c (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Bottom Cover 94 matrimandir Column & Beam Software
8/14/2021 14:25:33 11 / 20 Smita sambare Quantity Survey request for information theory of structure finished floor level secure socket layer rectangular hollow section All Of The Above hole 90 degree angle connector bracket Building information modellingBatching, Mixing, Placement, Batching and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7°C - 35°C (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440 auroville mothers earth temple Column Process
8/14/2021 14:27:25 11 / 20 Abhik Chowdhury Quantity Survey Request For Top
Information
Of Slab Construction, Drawing, Design Top Of Steel Construction, Drawings,
Finished
Piping Floor Level Structural Slab Level Structure Surface Level Rectangular hollow sections All Of The Above seat angle cleat angle, Butt joint Building Information Modelling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7°C and 35°C. (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 42.64 kg - kilo Auroville Mothers Earth Temple Column & Beam process
8/14/2021 14:27:39 11 / 20 Subandhu Dwivedi Quantity Survey Request for information theory of structures floor finish level Structure surface level rectangular hollow section All Of The Above Unistrut building information modelling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 degree celcius (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1.4 Auroville Golden globe None Process
8/14/2021 14:35:16 11 / 20 RITESH KHALOTE Quantity Survey request for information top of sleeve floor finish level structure slab level rectangular hollow section All Of The Above bolted connection building information modeling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 35.3 gold dome building Column & Beam process
8/14/2021 14:38:33 11 / 20 Vinod Kumar Quantity Survey Request for information Theory of structure Finished floor level Structural slab level Regular hollow section All Of The Above Bracket connection with lug angle Building information modelling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 25-27 (Opposite length/spacing) + 1 900 kg 402 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1700 Golden Dom Column Process
8/14/2021 14:39:06 11 / 20 Himanshu Ojha Quantity Survey request for information top of sleeve finish floor level structure slab level rectangular hollow section All Of The Above bolted seated connection building information modelling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 42.6 Matrimandir Beam both software and process
8/14/2021 14:39:27 11 / 20 Nitin chaurasia ETABS Request for information Top of steel Finish floor level Structural slab level Rectangular hollow section All Of The Above Bolted farmed connection Building information modelling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof Falls from heights 26.7°C and 35°C (Opposite length/spacing) + 1 900 kg 375 BAGS Depth of Slab or Beam Minus Bottom Cover 1440kgs/m3 Matrimandir None Process
8/14/2021 14:44:48 11 / 20 Sk sameena begum Quantity Survey request for information top of steel/slab finished floor level structure surface level rectangular hollow sections All Of The Above bolted connection building information modelling finishing Gable Roof, Gambrel Roof, Shed Roof All Of The Above 30°-120° (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover, Diameter 1.226 Matrimandir Column & Beam process
8/14/2021 14:45:24 11 / 20 Akshay vilas alankar Quantity Survey Request for information Top of slab Finished floor level Structural slab level Rectangular hollow section All Of The Above L PATTI Building information modeling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Opposite length/spacing) + 2 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440 Matrimandir None Process
8/14/2021 14:46:50 11 / 20 Sayan Roy Curtain Walls In Revit request for information top of steel finish floor level structure surface level rectangular hollow sections All Of The Above Bolted Connection building information modelling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above between 26.7°C and 35°C (Length/spacing) + 1 900 kg 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440kg/meter^3 Auroville Golden Globe Beam a process
8/14/2021 14:47:37 11 / 20 Sudhanshu Kumar Quantity Survey Request for information Top of steel Finish floor level Structural slab level Rectangular hollow sections All Of The Above Plate joint Building information modeling of
Batching, Mixing, Transporting, Placement and CompactingGable Roof, Gambrel Roof, Shed Roof All Of The Above 95 degree freinhight (Length/spacing) + 1 900 kg 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 0.034722 Golden structural None Cad
8/14/2021 14:48:28 11 / 20 Abdul Aamir ETABS request for information top of slab finished floor level structure surface level rectangular hallow section All Of The Above bolted connection building information modeling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26° to 35° (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.7 gold dome None process
8/14/2021 14:53:23 11 / 20 MD WASHIQUE REZA Quantity Survey Request for information Top of slab Finish floor level Structure slab level Rectangle hollow section All Of The Above Bolted connection Building information modeling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35°C (Length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.87 Circular building Column & Beam Process
8/14/2021 15:00:59 11 / 20 Hitesh Dubey ETABS request for informatiom top of slab finished floor level structure surface level rectangular hollow section All Of The Above bolted connection building information modelling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440 the matrimandir None process
8/14/2021 15:06:27 11 / 20 Amit kumar patel Quantity Survey Request for information Top of sterl Floor finish level Structure surface level Rectangular hollow sections All Of The Above Bolted building information modeling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440 Matrimandir Column
creating
& Beam
and managing information on a construction project across the project lifecycle
8/14/2021 15:09:18 11 / 20 Vinay shukla Quantity Survey request for information top of slab finished floor level structural surface level rectangular hollow section All Of The Above revit connection building information modeling
Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 26.7 (Opposite length/spacing) + 1 900 375 BAGS Diameter 1440 matrimandir Column & Beam process
8/14/2021 15:12:22 11 / 20 Nikhil Santosh Jadhav ETABS Request for information Top of steel/slab Finished floor level Structural slab level Rectangular hollow sections All Of The Above Beam to column moment steel connection Building information modeling
Batching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7°C-35°C (Opposite length/spac
8/14/2021 13:07:59 10 / 20 Suryakant Bhagat Quantity Survey request for information top of steel finished floor level structure surface level rectangular hollow section All Of The Above gusset connection plate Building information modelingBatching, Mixing, Transporting, Placement and Compacting
Duck Framed Roof, Indigo Roof, Belli Roof Falls from heights 35 (Length/spacing) + 1 900 374 BAGS Diameter 1440 matrimandir Column & Beam process
8/14/2021 13:08:36 10 / 20 Rishabh kumar Quantity Survey request for information top of steel finished floor level structure surface level rectangular hollow section All Of The Above Gusset connection plate building information modelingBatching, Mixing, Transporting, Placement and Compacting
Sawer Roof, Skillet Roof, Domer Roof All Of The Above 35 (Length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top Cover 89.8 Matri mandir Column & Beam Process
8/14/2021 13:09:03 10 / 20 Aslam khan Quantity Survey request for information top of slab finished floor level structure surface level rectangular hollow section All Of The Above bolted connection Building Information Modelling
Batching, Mixing, Transporting, Placement and Compacting
Duck Framed Roof, Indigo Roof, Belli Roof All Of The Above 35°C (Opposite length/spacing) + 1 900 kg 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.77626 matrimandir Beam process
8/14/2021 13:09:40 10 / 20 VIJAY P CHAUDHARI ETABS Reflective foil laminate Theory of structure Finished floor level structural slab level rectangular hollow section All Of The Above Bolted connection building information modeling
Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 27 to 35 (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440 Don't know None Process
8/14/2021 13:11:36 10 / 20 Surya kanta Pattanayak Quantity Survey request for information top of steel floor finish level structure slab level rectangular hollow section All Of The Above bolted framed steel connection building information modelingBatching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 degree celcius (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1.226 Matrimandir None process
8/14/2021 13:12:15 10 / 20 Digvijay Jadhav Quantity Survey request for information theory of structure finished floor level structural slab level right hand side All Of The Above Cleat joint building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35° (Opposite length/spacing) + 1 900 kg 374 BAGS Diameter 0.035 m^3 Don't know None process
8/14/2021 13:14:27 10 / 20 Jayesh Gavali Quantity Survey request for information terms of service floored finish level structural slab level right hand side All Of The Above corner building information modeling
Batching, Mixing, Transporting, Placement and Compacting,curing
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 30 (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Bottom Cover 35.3 matrimandir Beam Process
8/14/2021 13:15:25 10 / 20 MALLIKARJUN ETABS request for information top of slab finish floor level structure Surface Level rectangular hollow sections All Of The Above nut bolt system building information modelingBatching, Mixing, Transporting, Placement and Compacting
Duck Framed Roof, Indigo Roof, Belli Roof All Of The Above 26.7 (Length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.77 Auroville Golden globe Column & Beam software
8/14/2021 13:16:21 10 / 20 Pratik Prafulbhai Makwana Quantity Survey request for information top of slab floor finish level structure surface level rectangular hollow section All Of The Above bolted connection building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7°C to 35°C (Opposite length/spacing) + 1 900kg 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.78 circular building Column & Beam process
8/14/2021 13:17:29 10 / 20 N.Sridhana santosh kumar Quantity Survey Request for information Total oxidant status Fineshed floor level structure surface level Rectangular hollow section All Of The Above Steel grinders building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7 and 35 (Length/spacing) + 1 900kg 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440 Matrimandir Column & Beam Process
8/14/2021 13:17:38 10 / 20 MEDISHETTY SRUJANA ETABS request for information top of steel free flow speed structure surface level rectangular hollow section All Of The Above beam to column connection building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7°-35° (Opposite length/spacing) + 1 774 kg 374 BAGS Depth of Slab or Beam Minus Top Cover 1.2 Matri mandir Column
for creating
& Beamand managing information on a construction project across the project lifecycle
8/14/2021 13:17:51 10 / 20 ANWAR HUSSAIN Quantity Survey request for information top of steel floor finish level structure surface level rectangular hollow section All Of The Above angle connection building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26- 35 (Length/spacing) + 1 900 374 BAGS Diameter 40.8 Dont know None process
8/14/2021 13:19:29 10 / 20 Dhananjay Sachin Waghchaure Quantity Survey request for information therory of structutes full flood level sturcture surface level rectangular hollow section All Of The Above single angle bolted connection building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof Scaffold and Trench collapse between 26.7 and 35 C (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1.226 NA Column Process
8/14/2021 13:19:51 10 / 20 Vishal Quantity Survey Request for information Top of slab Finished floor level Structural slab level Rectangular hollow section All Of The Above Sheat angle Building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7·C and 35·C (Length/spacing) + 1 900kg 375 BAGS Diameter 90 lb/ft3 Auroville Matri mandir Column Process
8/14/2021 13:21:06 10 / 20 Ankit Rawat Quantity Survey request for information terms of service federal firearms license secure sockets layer right angle hypotenuse side All Of The Above 2 hole 90°fitting building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Duck Framed Roof, Indigo Roof, Belli Roof All Of The Above 35°c (Opposite length/spacing) + 2 900 375 BAGS Depth of Slab or Beam Minus Bottom Cover 40.8 matrimandir Column & Beam process
8/14/2021 13:21:19 10 / 20 KESHAV KUMAR MAHATO Quantity Survey request for information term of service finish floor level structure surface level rectangular hollow section All Of The Above unistrut building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Opposite length/spacing) + 1 900 374 BAGS Diameter 35.3 Auroville Golden Globe Column process
8/14/2021 13:22:23 10 / 20 Syed Yusuf Quantity Survey request for information top of steel finishes floor level structure surface level rectangular hollow section All Of The Above cleat angle building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Length/spacing) + 1 900 374 BAGS Diameter 5.8 matrimandir Column process
8/14/2021 13:23:51 10 / 20 Sakshi rajendra Khakse Quantity Survey Request for information Table of specifications Finished floor level Secure sockets layer Rectangular hollow section All Of The Above Revit connection Building information modelingBatching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7°c (Opposite length/spacing) + 1 900kg 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1.226cft Matrimandir in auroville, tamil nadu None Process
8/14/2021 13:24:55 10 / 20 Avinash Rodagi Quantity Survey Request for information Terms of service Finish floor level Structural slab level Rectangular hollow section All Of The Above Welded Building information modelingBatching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 27 to 35 c (Opposite length/spacing) + 1 900kg 375 BAGS Diameter 42.6 kg/ft³ Matri mandira Column & Beam A process
8/14/2021 13:25:13 10 / 20 Mamta Raju Borikar Quantity Survey Request for information Top of structure Finished floor level structural slab level Rectangular hollow section All Of The Above Welded connection Building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 50° -75° (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top Cover, Diameter 1440kg/m3 Dome structure None It is a process not software
8/14/2021 13:25:31 10 / 20 Tarun Kumar Quantity Survey request for information term of service federal firearms license secure socket layer right angle hypotenuse side All Of The Above bolted connection building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above between 26.7°C and 35°C. (Opposite length/spacing) + 1 900kg/ 9quintal 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440kgs/m3 auroville golden globe Column & Beam software
8/14/2021 13:25:49 10 / 20 Akshay Pramod Chakote ETABS request for information theory of structure finish floor level structural slab level rectangular hollow section All Of The Above angle section building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35⁰c (Length/spacing) + 1 900 375 BAGS Diameter 1506 the matrimandir None bim is a process of building information modelling
8/14/2021 13:27:41 10 / 20 Vishakha ETABS request for information top of slap or steel finished floor level structure surface level rectangular hollow section All Of The Above Tee joint building information modeling
Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 26.7 to 35 (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.77 Auroville Column & Beam Software
8/14/2021 13:27:59 10 / 20 Rajesh naiyar Quantity Survey request for information tearm of service fisnish floor level structure surface level rectangular hollow section All Of The Above welded frame connection building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 35.31 dont know None process
8/14/2021 13:28:54 10 / 20 Aman pandey Quantity Survey request for information top of slab floor finish level structural slab level rectangular hollow section All Of The Above Bolted building information modelingBatching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 30 f to 120 f (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1.2 dont know Column & Beam Process
8/14/2021 13:30:37 10 / 20 Karan Dinesh Changla Quantity Survey request for information top of steel/slab Don't know structure surface level rectangular hollow section All Of The Above beam to column connection building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1.226 Don't know None process
8/14/2021 13:30:40 10 / 20 Mou Ghosh Quantity Survey request for information top of steel / slab finish floor level structure surface level rectangular hollow sections All Of The Above Revet building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 degree c (Length/spacing) + 1 900kg 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1.2cft Ghggg None Software
8/14/2021 13:31:37 10 / 20 Ankit Kumar Quantity Survey request for information top of slab floor finish level structure slab level rectangular hollow section All Of The Above unistrut 2 hole 90 angle fitting building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440 mantrimandir Beam process
8/14/2021 13:33:15 10 / 20 Deepak pal Quantity Survey Request for information Top of steel/slap Finish floor level Structure surface level Rectangular hollow sections All Of The Above Ninety degree angle fitting Building information modelingBatching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26 and 35 (Length/spacing) + 1 22 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440 Auroville mothers earth temple Column & Beam Software
8/14/2021 13:34:39 10 / 20 Saumya sahu Quantity Survey Request for information Theory of structure Finished floor level Structure slab level Rectangular hollow section All Of The Above Cleat angle Building information modelBatching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 95 (Opposite length/width) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.78 No None Process
8/14/2021 13:37:27 10 / 20 Sabir Alam Curtain Walls In Revit request for information top of slab finished floor level structural slab level rectangular hollow sections All Of The Above Bolted Seated Steel Beam Connection building information modelling
Batching,Mixing,Transporting,Compaction & Levelling,Curing
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7°C and 35°C. (Opposite length/spacing) + 1 0.624996m3 375 BAGS Depth of Slab or Beam Minus Bottom Cover 1440 building Information modelling
AurovilleisMatri
a process
Mandirfor creating and managing information on a construction
Beam project across the project lifecycle. one of the key outputs of this process is the building information model, the digital description of every aspect of the suilt asset.
8/14/2021 13:37:56 10 / 20 Sankalp Manik Patil Quantity Survey request for information theory of structure floor finish level structure surface level rectangular hollow sections All Of The Above bolted seated connection building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26° to 32° (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1.226 don't know None software
8/14/2021 13:38:43 10 / 20 KESHAV KUMAR MAHATO Quantity Survey request for information term of service finish floor level structure surface level rectangular hollow section All Of The Above unistrut building information modelingBatching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Opposite length/spacing) + 1 900 374 BAGS Diameter 35.3 Auroville Golden Globe Column process
8/14/2021 13:38:59 10 / 20 Avinash Raj Anand Quantity Survey Request for information Top of steel/Slab Finished floor level Structure surface level Rectangular hollow section All Of The Above Cleat angle Building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 degree Celsius (Opposite length/spacing) + 1 50 375 BAGS Depth of Slab or Beam Minus Bottom Cover 1.226 Lotus temple None Process
8/14/2021 13:40:40 10 / 20 Anand Kumar Quantity Survey request for information top of steel/slab Finished floor level structural slab level Rectangular hollow section All Of The Above Bolted framed connection Building information modelingBatching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7°-35° (Opposite length/spacing) + 1 900kg 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover approx 40.775kg/cubic feet matri mandir, meditation Column software
8/14/2021 13:44:34 10 / 20 Vishal koul Quantity Survey request for information top of slab finished floor level structural slab level rectangular hollow sections All Of The Above l joint bracket building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above Between 26 and 35 (Opposite length/spacing) + 1 650kg 375 BAGS Diameter 35.31 Matrimandir None It is a process in which we give total information of building or a model
8/14/2021 13:45:15 10 / 20 SHAIK FEROZ ETABS request for information top of steel finished floor level structural floor level rectangular Hallow section All Of The Above bolt connection building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above Between 80° and 95°F (Length/spacing) + 1 900 kg's 375 BAGS Depth of Slab or Beam Minus Top Cover, Depth of Slab or Beam Minus Top & Bottom Cover 1440 Matrimandir Column & Beam process
8/14/2021 13:51:27 10 / 20 Ajit Kumar Yadav ETABS request for information terms of service federal firearms license secure sockets layer right angle hypotenuse side congruence All Of The Above angle building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof Falls from heights 26.7°c and 35°c (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 35.3147 cubi feet matrimandir Column & Beam enabled by technology
8/14/2021 13:53:46 10 / 20 Akash Ahlawat Quantity Survey Request for information Top of steel /slab Finished floor level Structure Surface Level Rectangular hollow section All Of The Above Bolted connection Building Information Modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 degree Celsius (Length/spacing) + 1 900kg 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1.22cft Lotus temple Column & Beam process
8/14/2021 13:54:37 10 / 20 Fahad bhagewadi Quantity Survey reduce floor index theory of structure finish floor level structure surface level rectangular hollow sections All Of The Above welding building information modellingBatching, Mixing, Placement, Batching and CompactingSawer Roof, Skillet Roof, Domer Roof All Of The Above 32 (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1.226 golden building None process
8/14/2021 14:02:27 10 / 20 Vijeta Verma Quantity Survey request for information terms of service federal firearms license stand for secure sockets layer right hand side All Of The Above bolt connection building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7°c and 35°c (Opposite length/spacing) + 1 900 402 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 88.3 Gold None Process
8/14/2021 14:02:33 10 / 20 NANDAKUMAR Quantity Survey request for information top of surface (or) top of structure floor finish level structure slab level rectangular hollow section All Of The Above Welded connection building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.8 Dome None process
8/14/2021 14:03:36 10 / 20 Shailesh Dhondiba Helave ETABS request for information Term of service FINISH FLOOR LEVEL Structure Surface Level or structure slab level Rectangular Hollow Sections All Of The Above Seat angle Building information modelingBatching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above between 26.7°C and 35°C. (Length/spacing) + 1 900 kg 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.7762591 gold dome building Column & Beam Process
8/14/2021 14:03:52 10 / 20 Raja Gupta Quantity Survey Request for information Top of steel Finish floor level Structure surface level Rectangular hollow section All Of The Above Unistrut Building information modelingBatching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 26.7° (Opposite length/spacing) + 2 900 402 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 0.0245 Auroville golden globe Column & Beam Process
8/14/2021 14:05:54 10 / 20 SUMAN KALYAN JANA Quantity Survey request for information terms of service finished floor level structure surface level rectangular hollow sections All Of The Above a l joint building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above between 26.7°C and 35°C (Length/spacing) + 1 900 375 BAGS Diameter 1440kgs/m3 Golden circle house Column & Beam 3D design and modeling software
8/14/2021 14:06:46 10 / 20 Varad Jikamde ETABS request for information testing operation system first floor level secure sockets layer rectangular hollow section All Of The Above ninety degree fitting unistrut building information management
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7°C - 35°C (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1.2cft Auroville Mothers Earth Temple Column & Beam process
8/14/2021 14:10:20 10 / 20 Saddam shakil ETABS Request for information Top of steel Finished floor line Structural slab level Rectangular hollow section All Of The Above Bolt connection Building information modelingCompacting, Mixing, Placement, Batching and Transporting None Of The Above All Of The Above Between 80 and 95 F (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440 I dont know Column & Beam Process
8/14/2021 14:16:28 10 / 20 Munigala Ravichander Quantity Survey request for information theory of structure finished floor level structural surface level rectangular hallow section All Of The Above seat angle (stiffened bolted seat connection) building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 32 degrees Celsius (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440kg/m3 matrimandir ashram gold auroville golden dome Column & Beam building information modeling
8/14/2021 14:20:53 10 / 20 Pallab Bora ETABS request for information terms of service floor finish level structural surface level rectangular hollow section All Of The Above moment connection building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Length/spacing) + 1 900 374 BAGS Diameter 40.8 sphere building None process
8/14/2021 14:26:50 10 / 20 Altaf Ansari ETABS request for information theory of structure finish floor level structural slab level rectangular hollow section All Of The Above 2 hope, 90° Fitting building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7° and 35° (Length/spacing) + 1 900kg 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 42.633 Matrimandir None process
8/14/2021 14:27:27 10 / 20 Bhagat Singh Baghel Curtain Walls In Revit request for information theory of structural finished floor level secure socket layer rectangular hollow sections All Of The Above Bolted Framed Steel Beam Connections building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above between 26.7°C and 35°C (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Bottom Cover 1.226 cft The Matrimandir a processNone for creating and managing information on a construction project across the project lifecycle.
8/14/2021 14:34:47 10 / 20 Amit kumar yadav Quantity Survey request for information Top is steel/slab Finished floor level Structure surface level Rectangular hollow section All Of The Above Unistrut Building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.5 and 35 dgree centigrade (Length/spacing) + 1 650 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.7 Auroville golden globe Column & Beam Building information modelling
8/14/2021 14:35:06 10 / 20 Mohammed Aweaz Quantity Survey request for information top of steel or slab finish floor level structural slab level rectangular hallow sections All Of The Above unistrut p1026 2 hole 90 degree fitting building information modelingbatching mixing transporting placement compacting curing
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7 to 35 (Length/spacing) + 1 900 400 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.7 matrimandir Beam process
8/14/2021 14:36:44 10 / 20 Hrushikesh Anil Londhe Quantity Survey request for information top of steel finished floor level structure surface level rectangular hollow section All Of The Above bracket building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Length/spacing) + 1 900 374 BAGS Diameter 40.7 Matrimandir Column & Beam software
8/14/2021 14:37:15 10 / 20 sultan Quantity Survey roof floor index top of steel finish floor level structural slab level rectangular hollow section All Of The Above weld building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 degree celcius (Length/spacing) + 1 900kg 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440kg/mcube no idea None process
8/14/2021 14:37:19 10 / 20 Mohd Abdul Nayeem Quantity Survey request for information terms of service finish floor level structure surface level rectangular hollow sections All Of The Above connecting plates Building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Length/spacing) + 1 900 375 BAGS Diameter 1 Golden ball Column Software
8/14/2021 14:46:15 10 / 20 Vicky Kumar Das ETABS Resquest for information Theory of Structure Finished floor level Structure surface level Rectangular hollow section All Of The Above seat angle bolted connection Building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 95°F (Opposite length/spacing) + 1 900kg 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440 Na Beam process
8/14/2021 14:50:46 10 / 20 Neha Tanaji Karande ETABS request for information top of slab, theory of structure finished floor level structure surface level rectangular hollow section All Of The Above rivet connection building information
batching,
modeling
mixing, transporting and placing, compaction and placing,Gable
curingRoof,
and finishing
Gambrel Roof, Shed Roof All Of The Above between 26.7°C and 35°C (Opposite length/spacing) + 1 50×18= 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1.23 auroville golden globe matrimandir Column & Beam Process
8/14/2021 14:56:25 10 / 20 RAJ PRAJAPATI Quantity Survey reflective foil laminate top of steel finish floor level structural slab level rectangular hollow section All Of The Above beam to column building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26 c- 35 c (Length/spacing) + 1 900 kg 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1.2 Elliptical building Column process
8/14/2021 15:04:55 10 / 20 Adhimula madhu Curtain Walls In Revit request for information top of steel / slab finished floor level structural slab level rectangular hollow section All Of The Above Bolted connection Building information modelling Batching ,mixing,transportation,compaction,curing Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7℃ and 35℃ (Opposite length/width) + 1 900kg 375 BAGS Depth of Slab or Beam Minus Bottom Cover 1650 matrimandir bim is aColumn
process&for Beam
creating and managing information on a construction project across the project lifecycle
8/14/2021 15:07:02 10 / 20 BIRENDRA SHAW Quantity Survey request for information tetralogy of fallout federal firearms license secure sockets layer rectangular hollow sections All Of The Above bolted connestion building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 degree centigrade (Opposite length/spacing) + 1 900kg 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.8 prolate spheroid building It is usedBeam
for creating and managing information on a construction project across the project lifecycle
8/14/2021 15:09:51 10 / 20 Er.Dibyaranjan sahoo Quantity Survey request for information top of steel /slab fnished floor level structure surface level rectangular hollow section All Of The Above unfinished bolted seat connection building information modelling
Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 26.7 and 35 (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440 gold dome building, Column & Beam process
8/14/2021 15:10:16 10 / 20 Ekramul Haque Ansari Quantity Survey Request for information Top of steel or slab Finish floor level Structure surface level Rectangular hollow section All Of The Above Angle Bracket Building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Length/spacing) + 1 900 375 BAGS Diameter 35.315 Matrimandir None Process
8/14/2021 15:12:42 10 / 20 Aftab Alam Ansari Quantity Survey Request for inspection Top of sleive Finish floor level Structural slab level Rectangular hollow section All Of The Above Lap joint Building information modelingBatching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35°c (Opposite length/spacing) + 1 900kg 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.7762 Rotunda Column & Beam Software
8/14/2021 15:14:48 10 / 20 Muhammad Asad ETABS request for information top of slab finished floor level structure surface level rectangular hollow section All Of The Above bearing plate building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 80 c (Length/spacing) + 1 900 kg 374 BAGS Diameter 40.7 matrimandir Column & Beam both
8/14/2021 15:15:42 10 / 20 Mudit Rastogi Quantity Survey request for information terms of service finished floor level structure surface level Rectangular hollow section All Of The Above Single cover butt joint building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 degree celsius (Length/spacing) + 1 900 kg 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440kg/m3 Dome Bim isColumn
more of & aBeam
process than it is software.Bim is a process that is enbled by technology and software
8/14/2021 15:16:40 10 / 20 Kirti prasad mohanty Quantity Survey request for information top of slab finish floor level structure surface level right hand site/ rectangular hollow section All Of The Above l bend building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Length/spacing) + 1 900 375 BAGS Diameter 1506 Auroville mother earth temple Column & Beam process
8/14/2021 15:19:46 10 / 20 Anusaya bahirat Quantity Survey request for information theory of structure finish floor level structure surface level rectangular hollow sections All Of The Above beam to column building information modelling
batching,mixing,transportation, compaction,curing,placement
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7°c - 35°c (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Bottom Cover 52 - 103 Dont know Column Process
8/14/2021 15:21:56 10 / 20 Sandeep ravi Curtain Walls In Revit Request for information Top of slab Finish floor level Structural slab level Rectangular hollow circle All Of The Above L section Building information modelingBatching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35° (Length/spacing) + 1 900 kg 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440 Matrimandir Column & Beam Software
8/14/2021 15:23:26 10 / 20 Karan Parmeshwar Pujari Quantity Survey Request for information Theory of structure Finish Floor level Structure surface level Rectangular Hollow section All Of The Above Bolted connection Building Information modelingBatching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.776 Matrimandir Column & Beam Process
8/14/2021 15:27:46 10 / 20 Thirumalesh M Quantity Survey request for information top of slab/steel finished floor level Structure surface level rectangular hollow section All Of The Above bolted connection building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 23±2°c (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1.226 Business building Column & Beam 3d design and modelling software
8/14/2021 15:33:07 10 / 20 Md zuber Quantity Survey request for information top of steel finished floor level structural salab level rectangular hollow section All Of The Above fetting building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above between 26.7 and 35 degree (Length/spacing) + 1 4000 374 BAGS Depth of Slab or Beam Minus Bottom Cover 1.226 Matrimandir Column It &
is Beam
a process for creating and mannaging information on s construction project
8/14/2021 15:36:07 10 / 20 AFROZ ANSARI Quantity Survey Request for information Top of steel Finish floor level Structure surface level Rectangular hollow section All Of The Above Ninety degree fitting Building information modelling
Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 26degree to 37degree (Opposite length/spacing) + 1 900 402 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440kg/m3 Matrimandir None
model-based process for designing and managing buildings and infrastructures
8/14/2021 15:52:00 10 / 20 Md Mohtashim Shaik ETABS Request for information Top of steel Finish floor level Structural slab level Rectangular hallow section All Of The Above L angle Building information modelling
Compacting, Mixing, Placement, Batching and Transporting None Of The Above Falls from heights 40 (Opposite length/spacing) + 1 900 402 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.8 Globe building Column Software
8/14/2021 16:05:02 10 / 20 Manisha Sharma Quantity Survey Request for information Theory of structure Finish floor level Structural slab level Rectangular hollow section All Of The Above angle Building information modelingBatching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 30 (Length/spacing) + 1 900 374 BAGS Diameter 40.7 Matrimandir Column Process
8/14/2021 16:12:17 10 / 20 Murali Durga Pavan Tedlapu Quantity Survey request for information top of slab finished floor level structural slab level rectangular hollow section All Of The Above angle section building information modeling Batching , Mixing, Transporting, Compaction, CuringGable Roof, Gambrel Roof, Shed Roof All Of The Above between 26.7°c and 35°c (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 42.6 dome Column process
8/14/2021 16:14:43 10 / 20 santosh matangulu ETABS request for information theory of structure finished floor level structure slab level rectangular hollow section All Of The Above bolted frame connection building information modelling
Compacting, Mixing, Placement, Batching and Transporting None Of The Above All Of The Above up to 35 (Length/spacing) + 1 900 375 BAGS Diameter 79.2872 matrimandir Column & Beam process
8/14/2021 16:16:08 10 / 20 Dinesh Suresh Mane Quantity Survey request for information theory of structure floor finish level structure surface level right hand side All Of The Above Unistiffened bolted connection building information modelingBatching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof Falls from heights 30 (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.82 matrimandir Column & Beam software
8/14/2021 16:20:26 10 / 20 Vishal kumar pandey Quantity Survey request for information theory of structure finished floor level structural slab level rectangular hollow section All Of The Above angle joint building information Modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35degree c (Length/spacing) + 1 50kg 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 35.31 Circular section Column Process
8/14/2021 16:21:45 10 / 20 Ankita Das ETABS request for information terms of service federal firearms license secure sockets layer rectangular hollow section All Of The Above feat connection building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Opposite length/spacing) + 1 900 374 BAGS Diameter 1.2 Sri Aurobindo Ashram Column process
8/14/2021 16:22:31 10 / 20 Sarfaraj Ali Quantity Survey request for information testing operation system finished floor level structural slab level rectangular hollow section All Of The Above L shaped angle steel building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7°C and 35°C (Length/spacing) + 1 900 kg 375 BAGS Diameter 65 kgs per cubic foot Gold dome Column & Beam process
8/14/2021 16:22:48 10 / 20 Aatif Shaikh ETABS request for information top of sleeve floor finish level structure slab level rectangular hollow sections All Of The Above unistrut building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Length/spacing) + 1 90 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.776 matrimandir Column bim & Beam
is a process for creating and managing information on a construction project
8/14/2021 16:27:13 10 / 20 Lovish baru Quantity Survey Request for information terms of service Finished floor level Structured slab level Right hand side All Of The Above Angle bracket Building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Duck Framed Roof, Indigo Roof, Belli Roof All Of The Above 30°c (Opposite length/spacing) + 1 900 375 BAGS Diameter 89.8 Auroville golden globe Beam Process
8/14/2021 16:27:24 10 / 20 Krishanu Ghosh ETABS request for information terms of service federal firearms license secure sockets layer right-hand side All Of The Above feat connection building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Opposite length/spacing) + 1 900 374 BAGS Diameter 1.2 sri aurobindo ashram Column process
8/14/2021 16:30:49 10 / 20 Saleem khan ETABS request for information theory of structure finished floor level structure slab level Rectangular hollow section All Of The Above beam to column building information moduleBatching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Length/spacing) + 1 900 400 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 35.3 matrimandir None process
8/14/2021 16:32:39 10 / 20 Yogita Jadhav ETABS request for information top of slab finished floor level structural slab level rectangular hollow section All Of The Above unistrut P1026 building information modeling.
Batching, Mixing,Transporting ,placement, compacting and Gable
curing.
Roof, Gambrel Roof, Shed Roof All Of The Above ASTM C 1064-86 set a maximum limit between 26.7°C and 35°C (Opposite length/spacing) + 1 900kg of cement 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1.226cft Matrimandir None process
8/14/2021 16:46:12 10 / 20 Rany Chakraborty ETABS request for information theory of structure finish floor level structural slab level rectangular hollow section All Of The Above cleat angle building information modeling
batching, mixing, transporting, placement, compacting,curing
Gable Roof, Gambrel Roof, Shed Roof All Of The Above between 26.7°C and 35°C (Length/spacing) + 1 400kg 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.77 matrimandir meditation centre, tamilnadu Column & Beam process
8/14/2021 16:49:16 10 / 20 Abhay Singh Quantity Survey request for information theory of structure finish floor level structure surface level rectangular hollow section All Of The Above Bolted connection building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7°C and 35°C. (Opposite length/spacing) + 1 900kg 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.79kg/ft3 Matrimandir Column process
8/14/2021 17:12:23 10 / 20 RAKESH KUMAWAT Quantity Survey request for information top of slab finish floor level structure surface level rectangular hollow section All Of The Above seated connection building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 degree celcius (Opposite length/spacing) + 1 900kg 374 BAGS Diameter 40.8 Nhi pta Column Process
8/14/2021 17:18:37 10 / 20 Ganesh Narayankar ETABS request for information top of steel or slab finish floor lab structure surface level rectangular hollow sections All Of The Above unistrut building information modelingBatching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 85-90 (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Bottom Cover 40.7 auroville mothers earth temple None process
8/14/2021 17:21:19 10 / 20 Rushiraj Khedekar Quantity Survey request for information top of slab or top of steel finished floor level structural floor level rectangular hollow section All Of The Above unistrut building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Opposite length/spacing) + 1 900 375 BAGS Diameter 89.8 auroville golden globe Column & Beam a process
8/14/2021 17:28:37 10 / 20 Kamlesh sonwane ETABS Request for information Top of steel finish floor level structural slab level Rectangular hollow section All Of The Above Moment connection Buiding information modellingBatching, Mixing, Transporting, Placement and Compacting
Sawer Roof, Skillet Roof, Domer Roof All Of The Above 26 to 34 (Length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440 Matrimandir temple None Softwear
8/14/2021 17:39:48 10 / 20 Abdur rehman Quantity Survey Request for information Terms of service Finished floor level Structure surface level Rectangular hollow secton All Of The Above Corner angle bracket Building information modelingBatching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35°C in hot weather (ASTM C 1064-86 (Opposite length/spacing) + 1 900kg 375 BAGS Diameter 40.8 Matrimandir,auroville Column & Beam Software
8/14/2021 17:51:58 10 / 20 Narendra yaduwanshi Quantity Survey request for information top of steel or slab finish floor level structure surface level rectangular hollow section All Of The Above seat angle building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Length/spacing) + 1 900 375 BAGS Diameter 42.6 Matrimandir Column & Beam software
8/14/2021 18:03:28 10 / 20 Saurabh Kumar Quantity Survey request for information top of steel finished floor level structure surface level rectangular hollow section All Of The Above Angel building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35°c (Length/spacing) + 1 900 kg 375 BAGS Depth of Slab or Beam Minus Top Cover 150 lb/ft3 don't know Column & Beam process
8/14/2021 18:03:29 10 / 20 Arun kumar Quantity Survey request for information terms of service finish floor level structure surface level rectangular hollow sections All Of The Above butt joint building information modeling
Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 26.7 to 35 (Length/spacing) + 1 900 375 BAGS Diameter 1440 matrimandir None process
8/14/2021 18:04:29 10 / 20 MOHAMMED ISMAIL UL HAQ ETABS request for information terms of service finished floor level Structure surface level rectangle hollow surface All Of The Above bolted connection building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440 Matrimandir None process
8/14/2021 18:06:04 10 / 20 Azim Shaikh Quantity Survey request for information top of structure finish floor level Structural Slab Level right hand side All Of The Above Bolted Building Information Modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35°C (Length/spacing) + 1 900kg 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1.226 Matrimandir (Auroville) Column & Beam Process
8/14/2021 18:24:29 10 / 20 Kanchan Manu valvi Quantity Survey request for information terms of service finish floor level structural surface level remot shell All Of The Above l shape angle building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof Scaffold and Trench collapse astm c94 set no temperature limit on fresh concrete (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 94.02 cubic ft No Column & Beam enable by technology and software
8/14/2021 18:26:23 10 / 20 RANUJ KONWAR Quantity Survey request for information top of steel floor finished level structure slab level Rectangular hollow sections All Of The Above Cleat angle building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Sawer Roof, Skillet Roof, Domer Roof All Of The Above 35 (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Bottom Cover 1.226 Don't know Column & Beam Process
8/14/2021 18:38:34 10 / 20 Civiltest21 ETABS Request for information Theory of structure Finished floor level Structural surface level Right hand side All Of The Above Bolt connection Building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26 to 35 (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Bottom Cover 1440 Assembly Column & Beam Software
8/14/2021 18:40:37 10 / 20 Mdtarequeaiddiqui Quantity Survey Request for information Terms of service finished floor level Structural slab level Rectangular hollow section All Of The Above Seat angle Building information modelingBatching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 26.7 to 35 (Opposite length/spacing) + 1 900 375 BAGS Diameter 1440kgs/m3 Idk None Process
8/14/2021 18:44:50 10 / 20 Govindsingh A TANWAR Quantity Survey request for information terms of service Federal Firearms License secure sockets laye Right hand side All Of The Above Angle fitting Building Information Modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above between 26.7°C and 35°C (Length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440 Auroville mothers earth temple Column & Beam process
8/14/2021 18:49:48 10 / 20 Younus ETABS request for information top of slab or steel finished floor level structure surface level rectangular hallow section All Of The Above bolt connection building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35° (Length/spacing) + 1 900kgs 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.7kgs/cft gold dome Column & Beam process
8/14/2021 18:52:44 10 / 20 Mohammad Imran Khan Quantity Survey Request for information Top of steel / slab Finish floor level Structural slab level Rectangular Hollow section All Of The Above Bolted joint Building information modelingBatching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 28°C-35°C (Length/spacing) + 1 900kg 375 BAGS Diameter 1440 kgs/m^3 Auroville Column & Beam Process
8/14/2021 19:14:17 10 / 20 Surajit Dey Quantity Survey request for information theory of structure finish floor level structure surface level rectangular hollow section All Of The Above beam to column connection building information modelingBatching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.8 rick house Column software
8/14/2021 19:38:17 10 / 20 Saimullah Quantity Survey request for information top of steel or slab finished floor level Structural slab level rectangular hollow section All Of The Above unistrut building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above between 26.7°C and 35°C (Length/spacing) + 1 900 kgs 374 BAGS Diameter 40.7762 kgs per cubic feet Matrimandir Column & Beam process
8/14/2021 19:50:43 10 / 20 Syed Arshad Uddin Quantity Survey request for information terms of service finish floor level structural slab level right angle hypotenuse side All Of The Above bolted connection building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 27 (Length/spacing) + 1 400 375 BAGS Diameter 1440 auroville Beam Process
8/14/2021 19:54:09 10 / 20 Pratiksha Prakash Salve Quantity Survey request for information terms of service finish floor level structure surface level rectangular hollow section True Slump cleat angle building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 30 (Length/spacing) + 1 900 374 BAGS Diameter 40.7 matrimandir None process
8/14/2021 19:55:00 10 / 20 Simant kumar Quantity Survey Request for information Term of service Finish floor level Structural floor level Rectangular hollow section All Of The Above Ninety degrees fitting Building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof Falls from heights 35°C (Opposite length/spacing) + 1 900kg 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 35.3 Matrimandir None Process
8/14/2021 19:55:40 10 / 20 Subhadip Ghosh
8/14/2021 13:22:07 9 / 20 Rahul kumar pandey Quantity Survey request for information term of service federal firearms liscence secure sockets layer right angle hypotanuse side All Of The Above bolt connection building information modellingBatching, Mixing, Transporting, Placement and CompactingGable Roof, Gambrel Roof, Shed Roof All Of The Above 27 degree to 35 degree celcius (Length/spacing) + 1 774kg 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440kgs Auroville None process
8/14/2021 13:23:28 9 / 20 Lekhram sahu Quantity Survey request for information terms of service federal firearms license secure sockets layer right hand side All Of The Above unstiffened bolted seat connection building information modelling batching, mixing, compaction Gable Roof, Gambrel Roof, Shed Roof All Of The Above between 26.7-35 (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 35.3 parliament of budapest None process
8/14/2021 13:23:36 9 / 20 Amit behura ETABS Request of information Theory of structure Finish floor level Structural slab level Rectangular hollow section All Of The Above Bolted framed connection Building information modeling Batching, Mixing, Transporting, Placement and CompactingSawer Roof, Skillet Roof, Domer Roof All Of The Above Don't know (Length/spacing) + 1 900 kg (one bag 50kg ) 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440 kg/m³ Auroville city Column & Beam Process
8/14/2021 13:25:30 9 / 20 Shaikh bilal Quantity Survey Floor area retio Table of specifications Finish floor level Structure surface level Rectangular hollow section All Of The Above cleat angle Building information modeling Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 32 (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1.226 Not know Column & Beam software
8/14/2021 13:29:12 9 / 20 Aslam Patel Quantity Survey Request for information Top of steel Finished floor level Structure surface level Rectangular hollow sections All Of The Above . Building information modelingBatching, Mixing, Placement, Batching and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7 degree C and 35 degree C (Opposite length/spacing) + 1 50kg 375 BAGS Depth of Slab or Beam Minus Top Cover 1440kgs/m3 BIM or Building Information
Parliament
Modellingofisbudapest
a process for creating and managing information on aNone
construction project across the project lifecycle. One of the key outputs of this process is the Building Information Model, the digital description of every aspect of the built asset.
8/14/2021 13:30:05 9 / 20 Rahul ETABS request for information top of slab floor finish level slab serface level rrgf All Of The Above boult connection building information modeling Batching, Mixing, Transporting, Placement and Compacting
Duck Framed Roof, Indigo Roof, Belli Roof All Of The Above 28 (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40 nnn Column process
8/14/2021 13:31:30 9 / 20 Aditi Kadam ETABS Request for information Term of service Finished floor level Structural slab level Rectangular hollow section All Of The Above Bolted seated Building Information modelling Batching, Mixing, Transporting, Placement and CompactingGable Roof, Gambrel Roof, Shed Roof All Of The Above Temp between 26 to 35⁰c (Length/spacing) + 1 900kg 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1.226 Don't know None Software
8/14/2021 13:31:54 9 / 20 Jayesh Dhangar Quantity Survey request for inspection top of steel finished floor level structure surface level rectangular hollow section All Of The Above seat angle building information angleBatching, Mixing, Transporting, Placement and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above between 26 to 35 (Length/spacing) + 1 900kg 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 35.31 Lotus Column & Beam software
8/14/2021 13:33:15 9 / 20 Pawara Sachin Quantity Survey request for information theory of structure finish floor level structural slab level rectangular hollow section All Of The Above - building information modeling Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 35´C (Length/spacing) + 1 900 400 BAGS Depth of Slab or Beam Minus Bottom Cover 0.0457 matrimandir Column & Beam softwear
8/14/2021 13:33:54 9 / 20 Afzal Sirajuddin Khan ETABS request for information terms of service finished floor level secure sockets layer rectangular hollow section All Of The Above angel connection building information modellingCompacting, Mixing, Placement, Batching and TransportingSawer Roof, Skillet Roof, Domer Roof Falls from heights 40 degree (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440 Don't know Column process
8/14/2021 13:34:45 9 / 20 Nihar Prasanna Shah Quantity Survey request for information terms of service finish floor level structure surface level right hand side All Of The Above bolted building information modellingBatching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 50°c (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Bottom Cover 94 golden oval Column process
8/14/2021 13:35:33 9 / 20 Mervin Quantity Survey request for information terms of service finish floor level structural slab level rectangular hollow section All Of The Above l joint building information modeling Batching, Mixing, Transporting, Placement and Compacting
Duck Framed Roof, Indigo Roof, Belli Roof All Of The Above ten minutes (Length/spacing) + 1 900 375 BAGS Diameter 1440 Nil None process
8/14/2021 13:39:35 9 / 20 Bhuvneshwer Singh Quantity Survey request for information term of service federal firearms license secure socket layer right hand side All Of The Above bolted connection with cleats building information modellingBatching, Mixing, Transporting, Placement and CompactingGable Roof, Gambrel Roof, Shed Roof All Of The Above 30 degree Fahrenheit to 120 degree Fahrenheit (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 94 Matur mandir Column software
8/14/2021 13:40:49 9 / 20 VIJAYARAJ Quantity Survey requesting for information top of slab finished floor level structural surface level rectangular hallow section All Of The Above gusset building information modellingBatching, Mixing, Transporting, Placement and CompactingGable Roof, Gambrel Roof, Shed Roof All Of The Above 30 (Length/spacing) + 1 900kgs 375 BAGS Depth of Slab or Beam Minus Bottom Cover 140 kg Library Column & Beam process
8/14/2021 13:41:38 9 / 20 Ravindra singh kushwah Quantity Survey request for information top of steel/slab finished floor level structure surface level rectangular hollow section All Of The Above Bolts/riveted connection building information modeling Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 30°- 120° (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 24000 Matrimandir Column & Beam Both
8/14/2021 13:41:47 9 / 20 Firoz ahmad Quantity Survey Request for information Top of steel Finish floor level Structure surface level Rectangular hollow section All Of The Above L connection Building information modelling Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 50 to 60 f (Opposite length/width) + 1 900 375 BAGS Diameter 1440kg/m3 Commercial building None 3D design and modeling software
8/14/2021 13:42:17 9 / 20 Ashutosh payasi Quantity Survey request for information top of slab finished floor level structure surface level rectangular hollow section All Of The Above Bolted frame steel connection Building
Batchinginformation
, Mixing , transporting
modeling and placing , compacting and placing , compacting and placing, None OfCuring
The Above
and finsih All Of The Above 26.7 - 35 degree celcius (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440 Auroville Column & Beam Process
8/14/2021 13:52:55 9 / 20 Vikram Vikas Ghadge Quantity Survey request for information top of steel finish floor levelffl structure surface level rectangular hollow sections All Of The Above bolted framed steel beam connection building information modeling Batching, mixing, transporting, compacting, curing None Of The Above All Of The Above 27°c and 35°c (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40 Matrimandir None process
8/14/2021 13:55:08 9 / 20 Mandeep Kumar Quantity Survey Request for information Terms of service Finish floor level Structural floor level Rectangular Hollow Sections All Of The Above "2 Hole, 90° Fitting" Building Information Modelling Batching, Mixing, Transporting, Placement and CompactingGable Roof, Gambrel Roof, Shed Roof All Of The Above between 26.7°C and 35°C (Length/spacing) + 1 900kg 374 BAGS Depth of Slab or Beam Minus Top Cover 1.226 cft Matri Mandir Column & Beam Process
8/14/2021 13:55:52 9 / 20 Aryaveer Chauhan Quantity Survey request for information theory of structure finishing floor level structure surface level rectangular hollow section All Of The Above bolted connection building information modeling Batching, Mixing, Transporting, Placement and CompactingGable Roof, Gambrel Roof, Shed Roof Scaffold and Trench collapse 35 (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 50853.12 sphere Beam process
8/14/2021 13:56:09 9 / 20 c.srinu Curtain Walls In Revit Request for information Top of Steel Finished floor level Structural slab level Rectangular hollow section All Of The Above Angular Building information modeling Mixing, transportation, compaction, curing Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7°c and 35°c (Opposite length/spacing) + 1 900kg 374 BAGS Depth of Slab or Beam Minus Top Cover 2400 Circular building Column & Beam Software
8/14/2021 13:56:14 9 / 20 Shahzada Ramzan ETABS request for information top of slab finished floor level structure slab level rectangular hollow section All Of The Above L bolt joints building information modeling Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 50 (Length/spacing) + 1 900 375 BAGS Diameter 1440 Golden doam Column & Beam Process
8/14/2021 13:56:19 9 / 20 Umesh Phukan Quantity Survey request for information terms of service federal firearms license secure sokets layer right hypotenuse side All Of The Above l joint building information modeling Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 26.7 to 35 deegre c (Opposite length/spacing) + 1 900kg 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440 kgs/m3 auroville Column & Beam process
8/14/2021 13:57:47 9 / 20 MD ALIMUDDIN Quantity Survey Request for information Terms of service federal firearms license stands for secure sockets layer Right hand side All Of The Above Seal angle building information modellingCompacting, Mixing, Placement, Batching and TransportingGable Roof, Gambrel Roof, Shed Roof All Of The Above between26.7⁰c and 35⁰c (Opposite length/spacing) + 1 900kg 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440kgs/m3 Cave Column & Beam 3D
8/14/2021 13:59:13 9 / 20 Dipak gangadhar khandvi Quantity Survey request for information terms of service federal firearms license secure sockets layer right hand side All Of The Above bolted seated building information modellingBatching, Mixing, Transporting, Placement and CompactingGable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Length/spacing) + 1 900 375 BAGS Diameter 1.2 matrimandir None procesd
8/14/2021 14:02:57 9 / 20 Sayyad Mohammed Hasan Quantity Survey request for information theory of structure floor finished level structure surface level rectangular hollow section All Of The Above flange support building information modeling Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 30 degree Celsius (Length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.8 don't know Column process
8/14/2021 14:08:36 9 / 20 Sanjay prasad Quantity Survey request for information Terms of service finish floor level Structural slablevel Rainwater harvesting system All Of The Above Intermeshed steel connection Building information modeling Batching, Mixing, Transporting, Placement and CompactingGable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top Cover 2.8 Auroville None Process
8/14/2021 14:09:14 9 / 20 Farhan Khan Quantity Survey request for information top of steel/slab finish floor level structure surface level rectangular hollow section All Of The Above 2 hole, 90° fitting building information modeling Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 95° f (Length/spacing) + 1 900 375 BAGS Diameter 1440kg/m3 matrimandir None process
8/14/2021 14:13:05 9 / 20 MUSAIB KHAN Quantity Survey Request for information Top of steell/slab Floor finish level Structure surface level Rectangular hollow section All Of The Above Bolted joint Building information modelling Batching, Mixing, Transporting, Placement and CompactingGable Roof, Gambrel Roof, Shed Roof All Of The Above 26 to 35 degree Celsius (Length/spacing) + 1 900 Kg 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.78 kgs Matrimandir Column Process
8/14/2021 14:14:07 9 / 20 Akshay Ravji Baigalwar Quantity Survey request for information terms of service federal firearms license secure sockets layer right hand side All Of The Above 2 hole 90degree fitting building information modellingBatching, Mixing, Transporting, Placement and CompactingGable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7 to 35 (Length/spacing) + 1 900 375 BAGS Diameter 1.226 matrimandir meditation center Beam process
8/14/2021 14:21:04 9 / 20 Arman Ali Quantity Survey full repairing and insuring top of steel finished floor level structure surface level rectangular hollow section All Of The Above T joint building information modeling Batching, Mixing, Transporting, Placement and CompactingGable Roof, Gambrel Roof, Shed Roof All Of The Above 26.6degre celcius to 35degre celcius (Length/spacing) + 1 900kgs 374 BAGS Diameter 40.81 matrimandir None process
8/14/2021 14:21:53 9 / 20 Dipanshi Dongre Curtain Walls In Revit Request for information Terms of service federal firearms licence Secure sockets layer Rectangular hollow section All Of The Above 90° fitting Building information modeling Batching, Mixing, Transporting, Placement and CompactingGable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7- 35 (Length/spacing) + 1 900kg 375 BAGS Diameter 1.2 matrimandir Column & Beam process
8/14/2021 14:22:53 9 / 20 Vaishnavi Gummed ETABS request for information top of steel/slab finish floor level structure surface level rectangular hallow sections All Of The Above steel beam connection building information buildingBatching, Mixing, Transporting, Placement and CompactingGable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7°c and 35°c (Opposite length/spacing) + 1 900 Depth
400 BAGS
of Slab or Beam Minus Top Cover, Depth of Slab or Beam Minus Top & Bottom Cover, Depth of Slab or Beam Minus2.8g/cmcube
Bottom Cover, Diameter don't know None process
8/14/2021 14:22:57 9 / 20 Vinod Singh Quantity Survey Request for information Top of slab Finish floor level Structure surface level Right hand side All Of The Above Beem connection Building information modelling Batching, Mixing, Transporting, Placement and Compacting
Duck Framed Roof, Indigo Roof, Belli Roof All Of The Above 35 (Length/spacing) + 1 900 375 BAGS Diameter 1440 Auroville Beam Process
8/14/2021 14:24:26 9 / 20 PANKAJ KUMAR Quantity Survey Requeest for information theory of structure floor finish level structure slab level rectangular hollow section All Of The Above angle connection Building information modelling Batching, Mixing, Transporting, Placement and CompactingGable Roof, Gambrel Roof, Shed Roof All Of The Above 27 to 35 degree centigrade (Opposite length/spacing) + 1 900 kg 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440 don't know Column process
8/14/2021 14:25:15 9 / 20 Shahbaz qureshi Quantity Survey request for information theory of structure finished floor level structure surface level rectangular hollow section All Of The Above bolted frame connection building information modeling Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 40 (Length/spacing) + 1 900 374 BAGS Diameter 40.7 Don't know. Column & Beam process
8/14/2021 14:25:38 9 / 20 Arvendra Kumar Quantity Survey request for information Theory of structure Federal Firearms License Federal Firearms License Rectangular Hollow Sections All Of The Above Unistrut 1-5/8" 90 Fitting P1026EG 2 Hole Building Information Modelling Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 26.7 (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1.226 Matrimandir, Auroville None Process
8/14/2021 14:31:11 9 / 20 ANAND KUMAR SAURAV ETABS Request For Information Top Of Slab Finished Floor Level Structure Slab Level Rectangular Hollow Section All Of The Above angular connection Building Information Modeling Batching, Mixing, Transporting, Placement and CompactingGable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440 matrimandir Column & Beam software
8/14/2021 14:35:07 9 / 20 Ankit kumar Quantity Survey request for information terms of service federal firearmr license secure socket layer the right hand side All Of The Above bolted seat connection building information modellingBatching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above at room temperature 21 to 30 degree celsius (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top Cover 1440 I don't know Column & Beam a process
8/14/2021 14:44:09 9 / 20 Anuradha panwar Quantity Survey Request for information Theory of structure Finish floor level structural slab level Rectangular hollow section All Of The Above Welded connect Building information modeling
batching,mixing,transporting,placement,compacting,curring,finishing
Gable Roof, Gambrel Roof, Shed Roof All Of The Above between 26.7°C and 35°C (Length/spacing) + 1 900kg 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440kgs/m3 Pyramid None process
8/14/2021 14:47:10 9 / 20 Gautami Mirji ETABS request for information top of steel/slab finish floor level structure surface level rectangular hallow sections All Of The Above bolted unistrut angle bracket connection building informationbatching,
modelingmixing ,transporting, placement,consolidation/compaction,curing
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 70°c (Opposite length/spacing) + 1 900 375 BAGS Diameter 40.7 mantrimandir in auroville Tamil Nadu None process
8/14/2021 14:50:15 9 / 20 Sourav Sinha Quantity Survey request for information top of slab finish floor level structural surface level rectangular hollow section All Of The Above angel connection building information modeling Batching, Mixing, Transporting, Compacting, Curing None Of The Above astm set no temperatureAlllimit
Of The
on fresh
Aboveconcrete in hot weather conditions if precautions are considered in proportioning, production, delivery, placing, and curing concrete. Nonetheless,
(Opposite
astm length/spacing)
set a maximum +limit
1 between 26.7°C and 35°C.
900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.8 puducherry auroville chidambaram temple Column it is a process.
8/14/2021 14:53:12 9 / 20 Akhilesh ojha Quantity Survey Request of information Terms of service Finish floor level Structural slab level Rectangular hollow section All Of The Above Seat angle Building information modelling Batching, Mixing, Transporting, Placement and CompactingGable Roof, Gambrel Roof, Shed Roof All Of The Above Between 26-35℃ (Opposite length/spacing) + 1 900kg 374 BAGS Diameter 35.314cubic feet The golden ball building None Bim is a process that is enabled by technology and software.
8/14/2021 14:55:38 9 / 20 Tilak raj Quantity Survey Request for information Top of steel Finished floor level Structure surface level Right hand side All Of The Above Seat angle Building information modelling BMixing transporting compacting curing Gable Roof, Gambrel Roof, Shed Roof All Of The Above 25 (Length/spacing) + 1 900 375 BAGS Diameter 42.64 kg Architecture None 3D design and modeling
8/14/2021 14:56:51 9 / 20 Sudhanshu Kumar Quantity Survey Request for information Top of steel Finish floor level Structural floor level Rectangular hollow sections All Of The Above Bolted joint Building information modeling Batching, Mixing, Transporting, Placement and CompactingGable Roof, Gambrel Roof, Shed Roof All Of The Above 96°F (Length/spacing) + 1 900 kg 374 BAGS Diameter 0.034722 Golden structural None Cad
8/14/2021 14:56:52 9 / 20 Ankit kumar ETABS request for information terms of service federal firearms license secure socket layer the right hand side All Of The Above bolted seat connection building information modellingBatching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above at room temperature 27degree Celsius (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top Cover 1440 Is auroville a mirage Column & Beam a process
8/14/2021 14:59:50 9 / 20 Abhishek chowdhury Quantity Survey request for information Top of Steel / Slab Finished floor level Structure surface level Rectangular hollow sections All Of The Above Cleat angle Building information modeling Batching, Mixing, Transporting, Placement and CompactingGable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7°- 35°c (Length/spacing) + 1 900 375 BAGS Diameter 42.64 Gold ball monument None Software
8/14/2021 15:00:23 9 / 20 Jafar Sadiq Quantity Survey request for information top of slab/steel, finish floor level structural surface level rectangular hollow section All Of The Above Truss Building information modelingbatching, mixing, transportation, compaction and curing Gable Roof, Gambrel Roof, Shed Roof All Of The Above 27 to 35 degree (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.7 Golden ball building None process
8/14/2021 15:00:54 9 / 20 Shifat Ali Quantity Survey Request for information Top of steel Finish floor level Structure surface level Rectangular hollow sections All Of The Above Unstiffened bolt Body mass index Compacting, Mixing, Placement, Batching and Transporting Gable Roof, Gambrel Roof, Shed Roof Electric shock and arc blast 26.7 degree celsius and 35 degree celsius (Opposite length/width) + 1 900 375Depth
BAGSof Slab or Beam Minus Top Cover, Depth of Slab or Beam Minus Top & Bottom Cover, Depth of Slab or Beam Minus
1440kgs/m3
Bottom Cover Matrimandir None Process
8/14/2021 15:03:18 9 / 20 Shinde Dnyaneshwar Houshiram Quantity Survey Request For Information TOP OF STEEL/SLAB Finish Floor Level Structure Surface Level Rectangular hollow section All Of The Above Riveted connection Building information modelling Batching, Mixing, Transporting, Placement and CompactingGable Roof, Gambrel Roof, Shed Roof All Of The Above 27-35 Degree Celsius (Length/spacing) + 1 900 374 BAGS Diameter 1440 Golden Ball Building Column & Beam process
8/14/2021 15:05:07 9 / 20 Kishanbhai A Rathva Quantity Survey Request For Information Top of Steel Finished floor level Structure Surface Level Rectangular hollow sections All Of The Above Bolted connections Building Information Modelling Batching, Mixing, Transporting, Placement and CompactingGable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7°C and 35°C (Length/spacing) + 1 900 374 BAGS Diameter 1440 Seven Planned Utopian Towns Beam Process
8/14/2021 15:10:19 9 / 20 Dipanshu Arora Quantity Survey Request for information Top of steel Finish floor level Structure surface level Rectangular hallow section All Of The Above Continue Building information modelingBatching, Mixing, Placement, Batching and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 16 (Length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Bottom Cover 1440 Global Column & Beam Good
8/14/2021 15:10:30 9 / 20 Muhammad Asad Quantity Survey request for information top of slab finished floor level structure surface level rectangular hollow section All Of The Above plate building information modellingBatching, Mixing, Transporting, Placement and CompactingGable Roof, Gambrel Roof, Shed Roof All Of The Above 80 centigrade (Length/spacing) + 1 900 kg 374 BAGS Diameter 40.7 Don't know Column & Beam both
8/14/2021 15:11:21 9 / 20 Aarif Ali ETABS Request for information Terms of service Floor finish level Structural slab level Right hand side All Of The Above Joint connection Building information modeling Batching, Mixing, Transporting, Placement and CompactingGable Roof, Gambrel Roof, Shed Roof All Of The Above 26%to 35% (Opposite length/spacing) + 1 900 374 BAGS Diameter 1.226 DOM None All part of building cordinate and building control digen
8/14/2021 15:16:31 9 / 20 Ganesh Narsing Tuple Quantity Survey Request For Information Theory of Structure Finished Floor Level Structure Slab Level Rectangular Hollow Section All Of The Above Flange Building information model Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 27 (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440 Golden ball building Column & Beam Process
8/14/2021 15:19:33 9 / 20 Laloo poddar Quantity Survey Request for information Top of steel/slab Finished flour level Structure surface level Rectangular hollow section All Of The Above Edge joint Building information modeling Batching, Mixing, Transporting, Placement and CompactingGable Roof, Gambrel Roof, Shed Roof All Of The Above American society for testing and materials (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top Cover 42.64 Lotus building Column & Beam Software
8/14/2021 15:21:41 9 / 20 Rahul malshetty ETABS Request for information Theory of structure ,Top of steel and top of slab Floor finish level Structural slab level Rectangular hollow section All Of The Above 90 degree plate connection (galvanized steel) Building Information Modelling Batching, Mixing, Transporting, Placement and CompactingGable Roof, Gambrel Roof, Shed Roof All Of The Above 32 degree celcius (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 41 kgs/cubic feet Matrimandir Beam It is a process.
8/14/2021 15:23:35 9 / 20 Abid alam Quantity Survey request for information theory of structure Finished floor level Structural slab level Rectugular hollow sections All Of The Above Unistrut 2 hole 90° fiting Building information
Site work,forming,
moulding mixing, placement, early finishing, troweling, final finishing,
None
curing
Of The Above All Of The Above 26.7° to 35° (Length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Bottom Cover 35.31 Matrimandir Column & Beam Process
8/14/2021 15:27:32 9 / 20 Tejas gowda ETABS Request for information Table of specifications Finished floor level⁸ Structure surface level Rectangular hallow section All Of The Above Bolt connection Building information modeling Batching, Mixing, Transporting, Placement and CompactingGable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440 Dont known Column Process
8/14/2021 15:29:11 9 / 20 MITHLESH Quantity Survey request for information transmission system opretor Floor finish level Secure socket layer right hand side All Of The Above p1026 building information modellingBatching, Mixing, Transporting, Placement and Compacting
Duck Framed Roof, Indigo Roof, Belli Roof All Of The Above 90 (Opposite length/spacing) + 1 90 374 BAGS Diameter 38.88 matrimandir None software
8/14/2021 15:30:36 9 / 20 ZUBERAHMED TURKANGERI Quantity Survey request for information terms of service federal firearms license select surveys limited rectangular hollow section All Of The Above shear building information modelling batching, mixing, transportation, compaction, curing Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35°c (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1506 Matrimandir india Beam process
8/14/2021 15:31:04 9 / 20 Soumen Jana Quantity Survey request for information top of steel / slab finish floor level structure Surface Level rectangular hollow sections All Of The Above Bolte connection building information modeling Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above between 26.7°c and 35°c (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1.2 Matrimandir creating
None and managing information on a construction project across the project lifecycle
8/14/2021 15:31:59 9 / 20 Mohd Irfan Quantity Survey Request for information Top of steel Finished floor level Structural Slab level Rectangular hollow section All Of The Above Bolted connection Building information modeling Batching, Mixing, Transporting, Placement and CompactingGable Roof, Gambrel Roof, Shed Roof All Of The Above 35 degree (Opposite length/spacing) + 1 900 kg 375 BAGS Diameter 40.77 kgs per cubic feet Auroville dome None Software
8/14/2021 15:47:19 9 / 20 Prabind Kumar Yadav Quantity Survey request for information top of steel/ slab finished floor level Structural slab level rectangular hollow sections All Of The Above Welded building information modeling Batching, Mixing, Transporting, Placement and CompactingGable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7 C to 35 C (Length/spacing) + 1 900 kg 375 BAGS Diameter 94 lb/ cum ft Circle building None software
8/14/2021 15:50:05 9 / 20 Soubhagya Ranjan Mohanty Quantity Survey Refractive fraction index Theory of structure finish floor level Structure surface level Right hand side All Of The Above Seated connection building information modellingBatching, Mixing, Transporting, Placement and CompactingGable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Length/spacing) + 1 90 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.7 Dont know None process
8/14/2021 15:50:45 9 / 20 TALAPUREDDY VENKATATEJA Quantity Survey Request for information Top of steel/slab Finish floor level Structural slab level Rectangular hollow section All Of The Above UNISTRUT P1026 - 90 DEG FITTING Building information modelling
Batching, Mixing, Transporting, Placement ,Compacting and Gable
curing
Roof, Gambrel Roof, Shed Roof All Of The Above ASTM C 1064-86 set a maximum limit between 26.7°C and 35°C. (Length/spacing) + 1 774 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 42.64 BIM or Building Information Modelling
Matrimandir
is a process for creating and managing information on aNone
construction project across the project lifecycle. One of the key outputs of this process is the Building Information Model, the digital description of every aspect of the built asset
8/14/2021 15:54:33 9 / 20 Ayushi Prashant Kadam Quantity Survey na na na na na All Of The Above welded connection building information modeling Batching, Mixing, Transporting, Placement and CompactingGable Roof, Gambrel Roof, Shed Roof All Of The Above 32 (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top Cover na na Column & Beam software
8/14/2021 15:54:38 9 / 20 Chetana Rajendra Patil Curtain Walls In Revit request for information top of steel finished floor level structure slab level rectangular hollow sections All Of The Above t section building information modeling Compacting, Mixing, Placement, Batching and TransportingGable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7 to 35 (Length/spacing) + 1 50 374 BAGS Depth of Slab or Beam Minus Bottom Cover 42.64 kg Em None process
8/14/2021 15:54:59 9 / 20 ASGAR ALI ANSARI Quantity Survey request for information top of steel finish floor level structure surface level rectangular hollow sections True Slump a1026- 2hole 90° fitting (1-1/4"series) unistrut building information modeling Batching, Mixing, Transporting, Placement and CompactingGable Roof, Gambrel Roof, Shed Roof Falls from heights 26.7° c and 35° c (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top Cover, Depth of Slab or Beam Minus Top & Bottom Cover 1.226 cft auroville None bim is a process
8/14/2021 16:03:23 9 / 20 Suhaib Anwar ETABS Request for information Top of steel Finished Floor level Structural floor level Rectangular hollow section All Of The Above Angle Bolting connection. Building information model Batching, Mixing, Transporting, Placement and Compacting
Duck Framed Roof, Indigo Roof, Belli Roof All Of The Above 30°C (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440 I don't know Column Software used for modelling of structure
8/14/2021 16:05:49 9 / 20 Pola Venkata Subba Gurusai Quantity Survey request for information top of slab finished floor level structural slab level rectangular hallow sections All Of The Above butt joint building information modeling Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 35°c (Length/spacing) + 1 900 375 BAGS Diameter 86 pass Column process
8/14/2021 16:06:50 9 / 20 Anil Pawar Quantity Survey finished road level top of steel / slab finished floor level Structure Surface Level rectangular hollow sections All Of The Above Unistrut P1026 Building Information modelling Compacting, Mixing, Placement, Batching and TransportingGable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7 and 30 (Opposite length/spacing) + 1 900kg 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 50853.12 Matrimandir Column process
8/14/2021 16:20:21 9 / 20 Archit Kumar Bharti Quantity Survey request of information top of steel slab finish floor level structural slab level rectangular hollow section All Of The Above L support building information modeling Batching, Mixing, Transporting, Placement and CompactingGable Roof, Gambrel Roof, Shed Roof All Of The Above 400 (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top Cover, Depth of Slab or Beam Minus Top & Bottom Cover 1440 Circular construction building Column & Beam Software
8/14/2021 16:21:15 9 / 20 MD RAMIZ MOLLA Quantity Survey request for information top of steel finish floor level structural slab level rectangular hollow sections All Of The Above moment connection building information modeling hand mixing and machine mixing None Of The Above All Of The Above between 26.7°C and 35°C (Length/spacing) + 1 50,40,30,25,20, kgs 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440kg/m3 Round house None a process
8/14/2021 16:30:32 9 / 20 ASHISH VERMA ETABS request for information trems of services finished floor level structure surface level rectangular hollow section All Of The Above connecting plates building information modeling Batching, Mixing, Transporting, Placement and CompactingGable Roof, Gambrel Roof, Shed Roof Falls from heights 95 (Opposite length/width) + 1 900 375 BAGS Diameter 2.3 dome Column & Beam Process
8/14/2021 16:34:13 9 / 20 HARSHAD NAYAK Quantity Survey ratio floor index theory of structure first floor level secondary slab level rapid hardening structure All Of The Above cleat angle building information modellingBatching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 25 (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 0.035 don't know Column & Beam software
8/14/2021 16:38:42 9 / 20 Girish Sanjay Patil Quantity Survey Request for information Theory of structure Federal firearms license Secure sockets layer Rectangular hollow section All Of The Above Angle lap joint Building information modelling Batching, Mixing, Transporting, Placement and CompactingGable Roof, Gambrel Roof, Shed Roof All Of The Above 25 centigrade (Length/spacing) + 1 900 kg 375 BAGS Diameter 1.22 cft Institute Column & Beam Process
8/14/2021 16:48:12 9 / 20 M Hari Krishna ETABS request for information top of slab finished floor level structure surface level rectangular hollow section All Of The Above eccentric bolt connection building information modellingBatching, Mixing, Transporting, Placement and CompactingSawer Roof, Skillet Roof, Domer Roof All Of The Above 35 (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover, Diameter 1.2 prefabricated building None process
8/14/2021 16:54:53 9 / 20 Civiltest21 Quantity Survey request for information top of slab finish floor level structure surface level rectangular hollow section All Of The Above riveted connection building information modeling Batching, Mixing, Transporting, Placement and CompactingGable Roof, Gambrel Roof, Shed Roof All Of The Above 27 to 35 degree Celsius (Opposite length/spacing) + 1 900 kg 375 BAGS Depth of Slab or Beam Minus Top Cover 1.226 No Column & Beam Planning , design , construction, and management of building s
8/14/2021 16:55:33 9 / 20 Haseeb ahmad Quantity Survey Request for information Total oxidant status First floor level Structure slab level Right hand side All Of The Above Flat ravit Building information modeling Batching, Mixing, Transporting, Placement and CompactingGable Roof, Gambrel Roof, Shed Roof All Of The Above 120 farhenite (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Bottom Cover 40.77 Golden Circle Column & Beam Software
8/14/2021 17:04:24 9 / 20 Md. Ayan Altaf Shaikh Quantity Survey request for information top of slab finished floor level structural slab level rectangular hollow section All Of The Above welded connection building information modeling Batching, Mixing, Transporting, Placement and CompactingGable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Length/spacing) + 1 900 375 BAGS Diameter 42.6 auroville golden globe None software
8/14/2021 17:16:07 9 / 20 shubham Tiwari Quantity Survey request for information theory of structure finished floor level structural surface level right hand side All Of The Above revit joint building information modeling Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 27to 35degree celcius (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440kg/m3 dome type structure Column digital transformation
8/14/2021 17:18:54 9 / 20 Naveen Biyani Quantity Survey Request for information Top of steel/slab finish floor level structure surface level rectangular hollow section All Of The Above bolted building information Modeling batching mixing transportation compaction curingGable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7c and 35c (Opposite length/spacing) + 2 50kg 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1506kg/m3 matrimandir None process
8/14/2021 17:24:50 9 / 20 Md Faiyaz Quantity Survey request for information top of steel finish floor level structure surface level rectangular hollow section All Of The Above angle building information modelingbatching, mixing, transportation, compaction and curing
Duck Framed Roof, Indigo Roof, Belli Roof All Of The Above I don't know (Length/spacing) + 1 900 375 BAGS Diameter 1440 in kg/m3 I don't know Column & Beam process
8/14/2021 17:27:31 9 / 20 Karan Rawal ETABS request of information top of concrete finished floor level structural slab level right hand side All Of The Above bolt connection building information model Batching, Mixing, Transporting, Placement and Compacting
Duck Framed Roof, Indigo Roof, Belli Roof All Of The Above 26.7 (Opposite length/spacing) + 1 900 402 BAGS Diameter 1.226 matrimandir Column & Beam building design
8/14/2021 17:40:29 9 / 20 Tanuj Pachoriya Quantity Survey Request for information Top of steel Finish floor level Structure surface level Rectangular hollow section All Of The Above Welded framed connection Building information modeling Batching, Mixing, Transporting, Placement and CompactingGable Roof, Gambrel Roof, Shed Roof All Of The Above ASTM C 1064-86 between 26.7°c and 35°c (Length/spacing) + 1 900 374 BAGS Diameter 42.64 Matrimandir None Increase knowledge of student and help in any field of civil engineering
8/14/2021 17:42:15 9 / 20 MD SHARUKH ALAM Curtain Walls In Revit request for information top of structure finishe floor level structural slab level rectangular hollow sections All Of The Above L building information modeling Hand mixing and machine mixing Gable Roof, Gambrel Roof, Shed Roof ASTM C94 set no temperature limit
All Of
onThe
fresh
Above
concrete in hot weather conditions if precautions are considered in proportioning, production, delivery, placing, and curing concrete. Nonetheless, ASTM
(Length/spacing)
C 1064-86 set
+ 1a maximum limit between 26.7°C
900 and 35°C. 375 BAGS Diameter 1.226 N None process
8/14/2021 17:42:24 9 / 20 Unnat ETABS Request for information top of slab finished floor level secure socket layer rectangular hollow section All Of The Above seated connection building information modellingBatching, Mixing, Transporting, Placement and CompactingGable Roof, Gambrel Roof, Shed Roof All Of The Above Less then 35°C (Length/spacing) + 1 900kg 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 35.31 Matrimandir None Software
8/14/2021 17:42:44 9 / 20 Quantity survey Quantity Survey Request for information Term of service Federal firearms license Structure surface level Rectangular hollows sections All Of The Above Bolted Building informations modeling Batching, Mixing, Transporting, Placement and CompactingSawer Roof, Skillet Roof, Domer Roof All Of The Above 120F (Length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 94 Auroville golden globe Column & Beam Process
8/14/2021 17:44:15 9 / 20 Jabbar Ahmed Quantity Survey Request for information Top of Slab Finished floor Level Steel structure level Rectangular hollow surface All Of The Above Flange Building Information Model Batching, Mixing, Transporting, Placement and CompactingGable Roof, Gambrel Roof, Shed Roof All Of The Above 30 (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Bottom Cover 1440 Dome Column & Beam Process
8/14/2021 17:45:39 9 / 20 Amit kumar Quantity Survey request for information theory of structure finish flor level structural slab level rectangular hollow section All Of The Above bolted connection building information modeling Batching, Mixing, Transporting, Placement and CompactingGable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7-37 (Length/spacing) + 1 900 374 BAGS Diameter 7850 walt disney world's epcot Column & Beam software
8/14/2021 17:48:09 9 / 20 Sagar shete Quantity Survey request for information top of steel finish floor level structure slab level rectangular hollow section All Of The Above simple connections building information modellingBatching, Mixing, Transporting, Placement and CompactingGable Roof, Gambrel Roof, Shed Roof Scaffold and Trench collapse 26.7°c to35°c (Length/spacing) + 1 900kg 374 BAGS Depth of Slab or Beam Minus Top Cover 23054.4 auroville mothers earth temple None process
8/14/2021 17:48:54 9 / 20 Dheeraj Kumar Quantity Survey request for information top of Steel finished floor level structural slap level rectangular hollo section All Of The Above bolted conection building information modeling Batching, Mixing, Transporting, Placement and CompactingGable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7 to 35 degree celsius (Opposite length/spacing) + 1 900kg 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440 decimal dome Beam Software
8/14/2021 17:49:30 9 / 20 Onkar Nath Vatsa Quantity Survey Request for information Top of slab Finished floor level Structural floor level Right hand side True Slump T joint Building information modeling Batching, Mixing, Transporting, Placement and CompactingGable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7 (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 94 Matrimandir Column & Beam Software
8/14/2021 17:54:22 9 / 20 Jyoti Tiwari Quantity Survey request for information terms of service finish floor level Structural slab level rectangular hollow section All Of The Above Angle connection Building information modelling
Batching, mixing, transporting and placing, compaction,Gable
curingRoof, Gambrel Roof, Shed Roof All Of The Above 26.7°C and 35°C (Length/spacing) + 1 900kg 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440kg/m^3 Aldar headquarter None bim is a process
8/14/2021 18:04:46 9 / 20 Pop singh Quantity Survey request for information top of steel Finished floor level Surface structure level rectangular hollow section All Of The Above rivit joint Building information modeling Batching, Mixing, Transporting, Placement and CompactingGable Roof, Gambrel Roof, Shed Roof All Of The Above 65-70 degree Celsius (Length/spacing) + 1 900kg 374 BAGS Diameter 1440 Type of dome Column process
8/14/2021 18:08:02 9 / 20 Apurba Baruah Curtain Walls In Revit Request for inspection Top of steel Finished floor level Structural slab level Right hand side All Of The Above Riveted connection Building information model Batching, Mixing, Transporting, Placement and CompactingGable Roof, Gambrel Roof, Shed Roof All Of The Above 35degree centigrade (Length/spacing) + 1 900kg 374 BAGS Diameter 35.3 Don't know Beam Process
8/14/2021 18:12:10 9 / 20 Sourabh Lekhara ETABS Request for information Theory of structure Floor finish level Structure surface level rectangular hollow section All Of The Above angle Building information modeling Batching, Mixing, Transporting, Placement and CompactingGable Roof, Gambrel Roof, Shed Roof All Of The Above 120 (Opposite length/spacing) + 1 900 374 BAGS Diameter 94 gold dome None process
8/14/2021 18:20:21 9 / 20 Deepak Naresh Mamdyal Quantity Survey request for information tearm of service first floor level second floor level right hand side All Of The Above 90° building information modeling Batching, Mixing, Transporting, Placement and CompactingGable Roof, Gambrel Roof, Shed Roof All Of The Above 40° (Opposite length/spacing) + 1 900 375 BAGS Diameter 0.000698 Symbol of architecture None process
8/14/2021 18:27:58 9 / 20 Amit Kumar Quantity Survey request for information top of structure finish floor level structure slab level rectangular hollow section All Of The Above Cantilever building information modeling Batching, Mixing, Transporting, Placement and CompactingGable Roof, Gambrel Roof, Shed Roof All Of The Above 38 (Opposite length/width) + 1 900 402 BAGS Diameter 1600 ball Column & Beam process
8/14/2021 18:34:26 9 / 20 Manoj Kumar Quantity Survey request for information theory of structure federal firearms license Secure sockets layer Rectangular hollow sections All Of The Above Single cover butt joint Building information modelling Batching, Mixing, Transporting, Placement and CompactingGable Roof, Gambrel Roof, Shed Roof All Of The Above 35°C(95°F) (Length/spacing) + 1 900 kg 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 35.3 Green building Beam Bim is a aaplication
8/14/2021 18:37:11 9 / 20 Syed owes mateen Quantity Survey request for information top of slab finished floor level structural slab level rectangular hollow section All Of The Above end plate connection building information modelling Batching, Mixing, Placement, Batching and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above american society of testing material (Opposite length/spacing) + 1 450 400 BAGS Diameter 1250 Circular None process
8/14/2021 18:41:29 9 / 20 Suthar anand Kumar Paragbhai Quantity Survey Request for information Terms of service Finish floor level Structure surface level Rectangular hollow section All Of The Above Cleat angle Building information modeling Batching, Mixing, Transporting, Placement and CompactingGable Roof, Gambrel Roof, Shed Roof All Of The Above Between 26.7 to 35 degrees (Length/spacing) + 1 900kg 375 BAGS Depth of Slab or Beam Minus Top Cover 35.3147 cubic feet Dom Column & Beam Process
8/14/2021 18:46:27 9 / 20 KANZARIYA KRIPAL Quantity Survey request for information terms of service finish floor level structural floor level rectangular hollow section All Of The Above Plate connection building information modeling Compacting, Mixing, Placement, Batching and TransportingGable Roof, Gambrel Roof, Shed Roof All Of The Above 26-35 (Length/spacing) + 1 900 375 BAGS Diameter 1440 Matrimandir Column & Beam Process
8/14/2021 18:49:56 9 / 20 Saikat Bose ETABS request for information fop of steel/slab finished floor slab structural slab level rectangular hollow section All Of The Above Bolted connection Building installation modelling
Batching, Mixing, Transporting, Placement and CompactingSawer Roof, Skillet Roof, Domer Roof Scaffold and Trench collapse 35 (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Bottom Cover 35.1287 Matrimandir Column & Beam Process
8/14/2021 18:52:09 9 / 20 NOOR ALAM ANSARI ETABS request for information terms of service finish floor level structural slab level rectangular hollow section All Of The Above bolted connection building information modeling Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 25 (Length/spacing) + 1 900 375 BAGS Diameter 1440 Matrimandir Column & Beam a process
8/14/2021 19:04:01 9 / 20 Giri Keshav Anurath ETABS request for information theory of structures finish floor level structure surface level rectangular hollow section All Of The Above bolted connection building information modeling Batching, Mixing, Transporting, Placement and CompactingGable Roof, Gambrel Roof, Shed Roof All Of The Above 27 (Length/spacing) + 1 900kg 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 94 Architectural building Column process
8/14/2021 19:14:28 9 / 20 Rushi kiran Quantity Survey request for information theory of structure finish floor level structural slab level Rectangular hallow section All Of The Above Lap building information modeling Batching, Mixing, Transporting, Placement and CompactingGable Roof, Gambrel Roof, Shed Roof All Of The Above 27-35 (Length/spacing) + 1 900 374 BAGS Diameter 94 Matrimandir Column software
8/14/2021 19:52:13 9 / 20 Kahnu Charan Das Quantity Survey Request for information Terms of service Finished floor level Structural slab level Rectangulat hollow sections All Of The Above Bolted frame connection Building information modelling Batching, Mixing, Transporting, Placement and Compacting
Duck Framed Roof, Indigo Roof, Belli Roof All Of The Above 70 degree (Length/spacing) + 1 900kg 375 BAGS Diameter 145 lbs Rotunda None Process
8/14/2021 20:00:54 9 / 20 Kranti chavan Quantity Survey request for information theory of structure Finish floor level Structure surface level Rectangular hollow section All Of The Above Botted connection Building information modelling Batching, Mixing, Transporting, Placement and CompactingGable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7 (Length/spacing) + 1 900 375 BAGS Diameter 40.77 Golden ball building Column Software
8/14/2021 20:06:35 9 / 20 Akshay Gaikwad ETABS request for information top of steel Finish Floor Level structure surface level right hand side All Of The Above 90 degree fitting building information modeling Batching, Mixing, Transporting, Placement and CompactingGable Roof, Gambrel Roof, Shed Roof All Of The Above 60 degree (Opposite length/spacing) + 1 900kg 375 BAGS Diameter 1.226 auroville mothers earth temple None process
8/14/2021 20:21:37 9 / 20 Braj Mohan Kumar ETABS request for information top of steel finished floor level structure slab level rectangular hollow section All Of The Above p1026- 2 hole, 90°fitting building information modeling Batching, Mixing, Transporting, Placement and CompactingGable Roof, Gambrel Roof, Shed Roof Al
8/14/2021 13:57:54 8 / 20 Abhishek Ranjan Quantity Survey request for information terms of service finished floor level structure surface level rectangular hollow section All Of The Above cantiliver building information modeling
Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 35 degree Celsius (Length/spacing) + 1 900 375 BAGS Diameter 1440 Oval None process
8/14/2021 14:00:02 8 / 20 Adeel Abbas Quantity Survey request for information Top Of Slab Construction, Drawing, Design Finished floor level Structure Surface Level Rectangular hollow sections All Of The Above Bolted framed connections Building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above between 26.7°C and 35°C (Length/spacing) + 1 0.122 375 BAGS Depth of Slab or Beam Minus Bottom Cover 1440kgs/m3 Matrimandar Beam process that is enabled by technology and software
8/14/2021 14:04:56 8 / 20 Kanak sharma Quantity Survey request for information for terms of service federal firearms seevice secure shocket layer rectangular hollow section All Of The Above Unistrut building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35°c (Opposite length/spacing) + 1 50 kg 400 BAGS Diameter 59.57 Matrimandir Column & Beam Process
8/14/2021 14:05:10 8 / 20 MD WASHIQUE REZA Quantity Survey Request for information Top of slab Finish floor level Structure slab level Rectangle hollow section Collapse Slump Bolted connection Building information modelingBatching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7°C to 35°C (Length/spacing) + 1 900kg 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.81 Circular building Column Process
8/14/2021 14:06:25 8 / 20 Ajay kumar Quantity Survey request for information REQUEST FOR INFORMATION federal firearms licence secure socket layer right hand side All Of The Above seat angle building information modelling hand mixing and machine mixing Gable Roof, Gambrel Roof, Shed Roof All Of The Above maximum limit between 26.7°c and 35°c (Opposite length/spacing) + 1 900 400Depth
BAGSof Slab or Beam Minus Top Cover, Depth of Slab or Beam Minus Top & Bottom Cover, Depth of Slab or Beam Minus
1440kg/m3
Bottom Cover formatrimandir
creating and managing information for creating and managingNone information on a construction project across the project life cycle.building information model the digital description of every aspect of the built asset
8/14/2021 14:10:40 8 / 20 Bhatti Punit Pravinbhai Quantity Survey request for information top of steel / slab Finish floor level Structure slab level rectangular hollow section All Of The Above Stiffener building information modellingBatching, Mixing, Placement, Batching and Compacting None Of The Above All Of The Above 35° (Opposite length/spacing) + 1 900KG 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 94 lb/ft^3 Miami building information modelling
None is a process for creating and managing information on a construction project across the project lifecycle.
8/14/2021 14:11:27 8 / 20 ysb ETABS request for information theory of structure finish floor level structure surface level rectangular hollow sections All Of The Above unstiffend seated connection building information modelingBatching, Mixing, Placement, Batching and CompactingGable Roof, Gambrel Roof, Shed Roof All Of The Above 35°c (Length/spacing) + 1 900 kg 374 BAGS Depth of Slab or Beam Minus Bottom Cover 40.77 kg/fit^3 auroville mothers earth temple in tamilnadu None process
8/14/2021 14:12:07 8 / 20 Sakpal Shital suresh Quantity Survey request for information term of service finish floor level structure surface level rectangular hollow section bolted framed
Allconnections,2)bolted
Of The Above seated connections,3)welded framed connections,4)welded seat connections, 5)end
building
plate information
connections,6)special
modeling
Batching,
connections
Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above between 26.7°C and 35°C (Length/spacing) + 1 900 400 BAGS Diameter 2.8 mysterious golden globe (mantrimandir) None Process
8/14/2021 14:19:47 8 / 20 Mayur Banjare Quantity Survey Request for information terms of service first floor level secure sockets layerr right hand side All Of The Above seat angle building information modellingBatching, Mixing, Placement, Batching and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above between 26.7 to 35 centigrate (Length/spacing) + 1 900 400 BAGS Diameter 1440kgs round building Column & Beam process
8/14/2021 14:20:55 8 / 20 Md Nazir Quantity Survey request for information top of steel or slab finished floor level structure surface level rectangular hollow section All Of The Above bolted farme connection building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above between 26.7°C and 35°C. (Length/spacing) + 1 900kg 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 94 lb/ft3 geodesic dome building None a process
8/14/2021 14:23:38 8 / 20 CHAKALI BALA HUSSAINY Quantity Survey request for information terms of service finish floor level structural floor level rectangular hallow section All Of The Above Bolted building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 70 (Length/spacing) + 1 900 kgs 375 BAGS Depth of Slab or Beam Minus Bottom Cover 42.8 Opera house Column Process
8/14/2021 14:28:28 8 / 20 Sohail Anwar Tarar Quantity Survey Request for information Top Of slab Finished floor level Structure surface level Rectangular Hollow Section All Of The Above Gusset Plate Building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 95°F (Length/spacing) + 1 50kg 374 BAGS Diameter 1440 Matrimandir None Process
8/14/2021 14:29:13 8 / 20 Munish Pathania Quantity Survey Request for information Top of Steel/ Slab Finish Floor Level Structural Slab Level Rectangular Hollow Section All Of The Above Cleat Angle Building Information Modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7° - 35° (Length/spacing) + 1 900 375 BAGS Diameter 40.7 Matrimandir Column Process
8/14/2021 14:32:46 8 / 20 R. Sudharshan Quantity Survey Request for information Top of steel Finish floor levl Structure surface level Right hand side All Of The Above Rivet joint Building information modelling
Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 45 (Opposite length/spacing) + 1 900kg 375 BAGS Diameter 2500 Golden egg Beam Software
8/14/2021 14:33:42 8 / 20 Vishal koli ETABS request for information Theory of structure Finish floor level Structure surface level Rectangular hollow section All Of The Above Welded joint Building information modelling
Compacting, Mixing, Placement, Batching and Transporting None Of The Above All Of The Above 30F-120F (Opposite length/spacing) + 1 900kg 402 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1.226 kgs/ft^3 Efg None Process
8/14/2021 14:36:00 8 / 20 Saquib Shaikh Quantity Survey Request for information Theory of structure Finish floor level Structural slab level Rectangular Hollow section All Of The Above Rivet type Building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Duck Framed Roof, Indigo Roof, Belli Roof All Of The Above 95° F (Length/spacing) + 1 900 375 BAGS Diameter 1.226 Image is not visible sir ProcessNonefor creating and managing information on construction project across the project lifecycle.
8/14/2021 14:36:27 8 / 20 Shahnawaz Ahmad Quantity Survey Request for information Top of stell Finished floor level Structural slab level Rectangular hollow section All Of The Above Cutter Building information modelingBatching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof Falls from heights Between 26.7 &35 degrees Celsius (Opposite length/spacing) + 1 900 kg 374 BAGS Depth of Slab or Beam Minus Bottom Cover 1440 kgs/per m cube Headquarters None BIM is a software 3d design and modeling software
8/14/2021 14:39:59 8 / 20 Karthik Tandon Quantity Survey request for information top of slab finish floor level structure surface level rectangular hollow section All Of The Above lap joint building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35℃ (Length/spacing) + 1 900 375 BAGS Diameter 94 lb/ft3 Oval None software
8/14/2021 14:43:24 8 / 20 Tushar Gunjal Quantity Survey Request for information Top steel Finished floor level Secure socket layer Right hand side All Of The Above Unistrut Building information modelingBatching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35degree (Length/spacing) + 1 900kg 375 BAGS Depth of Slab or Beam Minus Bottom Cover 145ibs Matrimandir Column & Beam Building information modeling software
8/14/2021 14:44:48 8 / 20 Vikash Kumar Maurya Quantity Survey Request for comment information top of slab finish floor level structural slab level rectangular hollow sections All Of The Above bolted sheat connection building information modelling Batching, Mixing, Placement, Transportation None Of The Above All Of The Above 35°C (Length/spacing) + 1 900Kg 375 BAGS Depth of Slab or Beam Minus Bottom Cover 1.4 I don't know None process
8/14/2021 14:45:20 8 / 20 Sunny israni Quantity Survey Request for inspection Theory of structure Finish floor level Structure surface level Right hand sight All Of The Above Bolt connection Building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 30° to 120° (Length/spacing) + 1 900 375 BAGS Diameter 1440 No None Process
8/14/2021 14:46:55 8 / 20 Harshit Tiwari ETABS Request for information Theory of structure Finished floor level Structure surface level Rectangular hollow section All Of The Above Unistrut Building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above Between 26.7 degree and 35 degree (Opposite length/spacing) + 1 774 kg 375 BAGS Depth of Slab or Beam Minus Top Cover 1440 kg/ m^ 3 Auroville mother earth temple Column BIM is software for 3D DESIGN AND MODELING SOFTWARE
8/14/2021 14:52:19 8 / 20 Ashapak patel Quantity Survey Request for information Top of steel or slab Finish floor level Structure surface level Rectangular hollow sections All Of The Above No Building information modeling Batching, mixing, transportation, compaction, curing None Of The Above All Of The Above 95F (Opposite length/spacing) + 1 9 quentel 375 BAGS Depth of Slab or Beam Minus Bottom Cover 1440 No None process
8/14/2021 14:57:29 8 / 20 Civiltest21 ETABS request for information terms of service finished floor level stractual slab level rectangular hollow sections Shear Slump Bolted frame Building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 10 to 32 degree (Opposite length/width) + 1 900 374 BAGS Depth of Slab or Beam Minus Bottom Cover 1440 Golden Circle Column Software
8/14/2021 14:59:01 8 / 20 Binod Sahu Curtain Walls In Revit request for information terms of service federal firearms licens secure sockets layer right hand side All Of The Above seat angle building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof Scaffold and Trench collapse 26.7c and 35c (Length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1226 cft Parliament of Budapest Column & Beam a process
8/14/2021 14:59:58 8 / 20 Ahmed Raja Quantity Survey request for information terms of service first floor level structure slab level rectangular hollow section All Of The Above t joint building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Length/spacing) + 1 900 375 BAGS Diameter 1440 Dubai gold building Column & Beam software
8/14/2021 15:03:45 8 / 20 Veeramanikandam Quantity Survey request for inspection top of slab floor finished level Structural slab level Rectangular hollow section All Of The Above L joint building information modelBatching, Mixing, Transporting, Placement and Compacting
Sawer Roof, Skillet Roof, Domer Roof All Of The Above 30 (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Bottom Cover 50846 Don't know Column & Beam software
8/14/2021 15:06:09 8 / 20 ALOK KUMAR Quantity Survey request for information term of service federal firearms licence Secure socket layer Right hand side All Of The Above Shear connection building information modelling
Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 35 degree C (Length/spacing) + 1 900 kg 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.8 kg matrimandr tamil nadu Column Process
8/14/2021 15:09:04 8 / 20 Shivanand Basavaraj Ganga Quantity Survey request for information terms of service federal firearms license secure socket layer rectangular hollow section All Of The Above channel building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Length/spacing) + 1 900 kg 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440kg auroville mother's earth temple None process
8/14/2021 15:10:52 8 / 20 Bipesh kumar Quantity Survey request for information Top of steel/slab floor finish level structure slab level rectangular hollow sections All Of The Above bolted connection building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Duck Framed Roof, Indigo Roof, Belli Roof All Of The Above 35 (Length/spacing) + 1 900 375 BAGS Diameter 35.3147 Don't know Column & Beam software
8/14/2021 15:18:04 8 / 20 Quantity survey Quantity Survey Request for information Terms of service Finished floor level Structure surface level Rectangular hallow section All Of The Above Cleat angle Building information modeling Curing Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 degree celcius (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.78 Dome None Software
8/14/2021 15:24:22 8 / 20 Sharanabasappa Quantity Survey Request for information Top of slab Floor finish level Structurel slab level Right hand side All Of The Above Angle Building information material
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 32 (Length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Bottom Cover 1440 Dum Column Yes
8/14/2021 15:28:22 8 / 20 Mayur Narhari Rokade Quantity Survey Request For Information Top of steel/slab Floor finish level Structure slab level Reactangular hollow sections All Of The Above Seat angle Building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above between 26.7°C and 35°C. (Opposite length/spacing) + 1 900kg 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1.226 Matrimandir Column & BeamBIM is a process that is enabled by technology and software
8/14/2021 15:40:19 8 / 20 Deepesh Gupta ETABS request for information Theory of structure finish floor level Structure surface level rectangular hollow section All Of The Above Single plate connection building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7 - 35 (Length/spacing) + 1 900 375 BAGS Diameter 35.31 Circular building None precess
8/14/2021 15:47:36 8 / 20 Anshika Quantity Survey Request for information Terms of service Federal firearms license Secure sockets layer Right -hand side All Of The Above Unistrut P1026 90 degree angle fitting Building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above ASTM C1064- 86 set a maximum limit between 26. 7°C and 35°C (Length/spacing) + 1 900 400 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440kgs Auroville golden globe 3d design and modeling softwareNone that can help optimize the work of designing for architecture , construction , plant, civil , and MEP project.
8/14/2021 15:50:38 8 / 20 Pavan kumar kalisetty ETABS Request for information theory of structures Finish floor level Structure surface level Rectangular hollow section All Of The Above Bolted connection Building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 32c (Length/spacing) + 1 900 kgs 375 BAGS Diameter 40.87 Aurovillie golden globe Column Software
8/14/2021 15:55:55 8 / 20 Parth Chauhan Quantity Survey Request For Information Top Of Slab Finished Floor Level Structure Slab Level Rectangular Hollw Section All Of The Above Seat Angle Building Information Modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Opposite length/spacing) + 1 900 kg 375 BAGS Depth of Slab or Beam Minus Top Cover 42.64 Matrumandir Column & Beam Process
8/14/2021 16:02:41 8 / 20 charan kumar T ETABS Fffg ffgg Ffff Fggf fggf All Of The Above L joint Building information modelling
Compacting, Mixing, Placement, Batching and Transporting
Sawer Roof, Skillet Roof, Domer Roof All Of The Above 56 (Opposite length/spacing) + 1 574 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 18 Dimand building Column & Beam Process
8/14/2021 16:03:15 8 / 20 Lavkush Kumar Quantity Survey REQUEST FOR INFORMATION TOP OF SLEEVE FLOOR FINISH LEVEL STRUCTURE SLAB LEVEL RIGHT HAND SIDE All Of The Above BOLTED HYBRID STEEL BUILDING INFORMATION MODELING Batching, Mixing, Placement, Batching and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above No (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.8 4 Column & Beam RAVIT
8/14/2021 16:04:31 8 / 20 Quantity survey Quantity Survey Request for information Top of slab Finished floor level Structural slab level Rectagular for information All Of The Above Flange connection Building information modelling
Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above C1064 (Length/spacing) + 1 900kg 375 BAGS Diameter 1440 Aurovile golden globe None Creating, mananig , lifecyel
8/14/2021 16:07:20 8 / 20 Prashun kumar prajapati Curtain Walls In Revit request For information top of steel finished floor level. Secure Sockets Layer rectangular hollow sections All Of The Above 2 hole 90 degree angle fitting building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7 to 35degree celsius (Length/spacing) + 1 900kg 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 94 auroville mothers earth temple Column For design and construction work
8/14/2021 16:08:27 8 / 20 Santosh Bairagi ETABS requist for information theory of structure finished floor level structure surface level rectangular hollow sections All Of The Above Angle sheet connection building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof Scaffold and Trench collapse 26.7 to 35 degree c. (Opposite length/spacing) + 1 900kg 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 50976 Auroville Matrimandir None Software
8/14/2021 16:11:41 8 / 20 Bijaya kumar routaray ETABS Reflective Foil laminate Top of slab Finished floor level Structural Slab level Rectangular hellow sections All Of The Above Unistrut Building Information Modelling
Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 1064-86 (Opposite length/width) + 1 900 374 BAGS Depth of Slab or Beam Minus Bottom Cover 10 Auroville Golden globe Column & Beam Process
8/14/2021 16:12:24 8 / 20 Shubham Rana Quantity Survey Request for information Top of steel Top of steel Structure surface level Rectangular hollow section All Of The Above Cleat angle Building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 80-95 degree F (Length/spacing) + 1 900 kg 400 BAGS Diameter 1440 The auroville dome Column & Beam Software
8/14/2021 16:15:16 8 / 20 Chaudhary bhavesh ETABS Request for information. Total oxidant status Finished floor level Structural slab level Report hardening cement All Of The Above Pleat joint Building information modelling
Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 27 C (Opposite length/width) + 1 900 kg 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1430 Abhudhabi Beam 3D modeling process and manage building constructiin
8/14/2021 16:17:06 8 / 20 MD SAUBAN Quantity Survey request for information terms of service finished floor level structure surface level rectangular hollow section All Of The Above Stirrup support building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35°c (Length/spacing) + 1 900kg 375 BAGS Depth of Slab or Beam Minus Bottom Cover 1440 Dome None process
8/14/2021 16:20:55 8 / 20 Karansing Pramod Patil Quantity Survey Request for information Theory of structure Finish floor level Structural slab level Rectangular hollow section All Of The Above Struct Building information modeling
Compacting, Mixing, Placement, Batching and Transporting
Sawer Roof, Skillet Roof, Domer Roof All Of The Above 26.7 to 34.5 degree (Opposite length/width) + 1 900 375 BAGS Depth of Slab or Beam Minus Top Cover 42.64 Matrimandir shuttal stock Column & Beam Elevation and modeling . of building
8/14/2021 16:22:33 8 / 20 Hushar Raghunath Zurade ETABS request for information top of steel / slab Finish floor level structure surface level rectangular hollow sections All Of The Above 2 hole 90° fitting building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above between 26.7°C and 35°C (Opposite length/spacing) + 2 40kg cement bag size 402 BAGS Depth of Slab or Beam Minus Bottom Cover 42.64 kg - kilo BIM or Building Information Modelling
Mantrimandir
is a process for creating and managing informationColumn
on a construction
& Beam project across the project lifecycle. One of the key outputs of this process is the Building Information Model, the digital description of every aspect of the built asset
8/14/2021 16:30:42 8 / 20 Untwale sohel samad Quantity Survey request for information Top of steel/slab floor finish level structure slab level rectangular hollow section All Of The Above unistrut 2 hole 90° fitting building information modeling
Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above between 26° c and 35°c (Length/spacing) + 1 900 kg 375 BAGS Diameter 1.226cft matrimandir Column & Beam process
8/14/2021 16:30:48 8 / 20 tanik mandal Quantity Survey request for information top ofeslab finish floor level structure slab levele right hand side All Of The Above t junction building information modeling
Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 26.7 degree c.to 35 degree c. (Opposite length/spacing) + 1 900 kg 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 89.85 Its not a building None software
8/14/2021 16:35:44 8 / 20 ARITRO DHAR ETABS request for information terms of service federal firearm lisence secure socket layer rectangular hollow section All Of The Above Seat building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Length/spacing) + 1 900 374 BAGS Diameter 1.2 Shri Aurobindo Ashram Column Software
8/14/2021 16:50:39 8 / 20 prajapati rajesh ETABS request for information terms of service Federal Firearms License secure sockets layer right-hand side Collapse Slump cleat angle Building Information Modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7°C and 35°C (Opposite length/spacing) + 1 900 375 BAGS Diameter 1440 matrimandir None a process
8/14/2021 16:53:14 8 / 20 Kotagiri shivani Curtain Walls In Revit request for information top of steel or top of slab finished floor level structural slab level rectangular hallow section All Of The Above bolted connection building information modelling
Batching,mixing, transporting, placement, compacting and curing. None Of The Above All Of The Above 35°C (Opposite length/spacing) + 1 900 (each bag of 50kg) 375 BAGS Diameter 1440 auroville, pondicherry Column BIM is a process enabled by technology and software.
8/14/2021 16:59:25 8 / 20 Pratiksha Ramdas Rewatkar Curtain Walls In Revit Request for information Top of steel/Slab Finish floor level Structure surface level Rectangular hollow section All Of The Above Bolted connection Building information modelling
Batching,mixing,transporting,placement,compacting andGablecuringRoof, Gambrel Roof, Shed Roof All Of The Above 26.7°C and 35°C (Length/spacing) + 1 900kg 375Depth
BAGSof Slab or Beam Minus Top Cover, Depth of Slab or Beam Minus Top & Bottom Cover, Depth of Slab or Beam
40.77
Minus
kg/cubic
Bottomfeet
Cover MatriMandir, Auroville Column & Beam Software
8/14/2021 17:24:52 8 / 20 Pintu Kumar Gupta Quantity Survey request for information terms of service federal firearms license secure sockets layer right hand side All Of The Above edge joint building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 10℃ to 32℃ (Opposite length/width) + 1 900 kg 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 94 i don't no None software
8/14/2021 17:39:55 8 / 20 MD IFTEKHAR Curtain Walls In Revit request for information terms of service federal firearma license secure sockets layer right hand side All Of The Above pre northidge beam to column moment connection building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Sawer Roof, Skillet Roof, Domer Roof All Of The Above 58 (Length/spacing) + 1 4300 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440kgs/m3 Goal Column & Beam software
8/14/2021 17:54:20 8 / 20 MD REHAN ALAM Quantity Survey request for information top of steel finish floor level Structure surface level Rectangular hellow section All Of The Above Jiont building information management
Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 34 degree (Opposite length/spacing) + 2 900 375 BAGS Depth of Slab or Beam Minus Bottom Cover 3150 I don't know None software
8/14/2021 18:27:25 8 / 20 Omkar Raghunath pawar ETABS request for information terms of service federal firearms license secure sockets layer right angle All Of The Above bolted connection building information modelling
batching , mixing , transportation, compaction and curing None Of The Above All Of The Above it's between 26.7°c and 30°c (Opposite length/spacing) + 1 900kg 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1.2 cft Matrimandir None process
8/14/2021 18:46:55 8 / 20 Rahul Rajkumar Mourya ETABS request for information top of steel finish floor level structural surface level right hand side All Of The Above cheat angle building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 37 (Length/spacing) + 1 90kg 400 BAGS Diameter 2.8 Golden golf None process
8/14/2021 18:46:56 8 / 20 Arman Mujawar Quantity Survey Request for Information Terms of Service Finish Floor Level Structure slab level Rectangular hollow Section All Of The Above End plate Connection ji Building Information ModelingBatching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26 to 35 (Length/spacing) + 1 400 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1506 Dome Column & Beam Process
8/14/2021 18:54:06 8 / 20 Amar mk ETABS Required for information Terms of service Federal firearms license Hypertext Transfer Protocol Secure the right-hand side All Of The Above V joint Building Information Modelling
Batching, Mixing, Transporting, Placement and Compacting
Sawer Roof, Skillet Roof, Domer Roof All Of The Above 26.7°C and 35°C (Opposite length/spacing) + 1 50kg 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 42.64 kg - kilo Globic Column & Beam Process
8/14/2021 18:56:10 8 / 20 RANUJ KONWAR Quantity Survey request for information top of slab floor finished level structural slab level rectangular hollow section All Of The Above cleat angle building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Sawer Roof, Skillet Roof, Domer Roof All Of The Above 35 (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Bottom Cover 1.226 Matrimandir Column & Beam software
8/14/2021 19:03:41 8 / 20 Juber Quantity Survey request for information theory of structure finished floor level structure surface level rectangular hollow section All Of The Above T connection by rivet or bolt building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 80-95 degrees (Length/spacing) + 1 900 375 BAGS Diameter 150pcf/cub foot Unknown for me Column Software
8/14/2021 19:08:05 8 / 20 SHAHZAR LIYAQAT BUBERE ETABS Request for information Theory of structure Finish floor level Structure slab level Rectangular hollow section All Of The Above L bolt plate Building information modelingBatching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 27°c (Length/spacing) + 1 900 400 BAGS Diameter 1.2 Golden dom meditation center Column & Beam process
8/14/2021 19:18:34 8 / 20 Sourabh Vijay Katkar Quantity Survey request for information top of steel /slab finished floor level structure surface level rectangular hollow section All Of The Above slit angle building information modelling
Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 26.7%and 35% (Length/spacing) + 1 774 374 BAGS Depth of Slab or Beam Minus Bottom Cover 1440 Burj khalifa None process
8/14/2021 19:48:09 8 / 20 Akshay Gs Quantity Survey request for information terms of service finish floor level structural slab level rectangular hollow section All Of The Above singal angle building information modeling
Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 26.7 to 35 degree centigrade (Length/spacing) + 1 900 kg 375 BAGS Diameter 150 matrimandir None software
8/14/2021 19:52:40 8 / 20 UMESH KUMAR YADAV ETABS request for information terms of service federal firearms license secure sockets layer right angle-hypotenuse-side All Of The Above t-joint building information modelling
Compacting, Mixing, Placement, Batching and Transporting
Duck Framed Roof, Indigo Roof, Belli Roof All Of The Above 26.7°c-35°c (Opposite length/spacing) + 1 900kg 375 BAGS Diameter 35.3147 Epcot Column & Beam process
8/14/2021 20:06:13 8 / 20 Jayesh Panditrao Patil Quantity Survey request for information top of steel / slab finished floor level structure surface level rectangular hollow sections All Of The Above connecting angles building information modellingBatching, Mixing, Placement, Batching and Compacting None Of The Above Scaffold and Trench collapse between 26.7°C and 35°C (Opposite length/spacing) + 1 90 375 BAGS Diameter 1.226 cft matrimandir None for creating and managing information
8/14/2021 20:11:55 8 / 20 Yes Quantity Survey Request for information Top of steel or top off slab Finished floor level Structural slab level Rio hand site All Of The Above No Building information modeling
Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above No (Length/spacing) + 1 900 375 BAGS Diameter 35.31 No Column Qs
8/14/2021 20:19:08 8 / 20 Kethidi Keerthi Quantity Survey request for information torms of service federal firearms license hyper text transfer protocol secure Rectangular hollow section All Of The Above Welded connection building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26-35 (Length/spacing) + 1 900 374 BAGS Diameter 1440 Lotus pomd Column process of modelling of building & interior designing
8/14/2021 20:24:30 8 / 20 Md Afzal Nawaz Quantity Survey Request for information Top of slab Finish floor level Structure surface level Rectangular Hollow surface All Of The Above Development length Building information modelBatching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 37 (Opposite length/spacing) + 1 900kg 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1.24 Goal ghar None Software
8/14/2021 20:25:04 8 / 20 Gauri Dattu Gawade Quantity Survey request for information toasteros operating system Federal firearms license secure socket layer Right hand side All Of The Above strut building information modeling
Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 35 (Opposite length/spacing) + 1 900 375 BAGS Diameter 3150 matrimandir Column Software
8/14/2021 20:25:46 8 / 20 Anmol Mishra Quantity Survey request for information top of steel finished floor level Structure surface level rectangular hollow section All Of The Above Bolted Seated Steel Beam Connection building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Duck Framed Roof, Indigo Roof, Belli Roof All Of The Above 26.7 c (Opposite length/spacing) + 2 900 375 BAGS Depth of Slab or Beam Minus Bottom Cover 1.226 Dome for creating
None and managing information on a construction project across the project lifecycle.
8/14/2021 20:31:00 8 / 20 Thanki Bhvaik Manojbhai ETABS Request for information No idea Floor finishing level slab level Rectangular hollow section All Of The Above bolted building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Opposite
now alength/spacing)
days many bags+ 1are available in different mass (30,40,50 etc) standard 50 kg,
37518BAGS
bag= 900kg Diameter 1.23 No idea None process
8/14/2021 20:50:08 8 / 20 Priyanka Vineeth Quantity Survey request for information top of steel or slab finish floor level structure surface level rectangular hollow sections All Of The Above Angle joint building information modelling Batching, mixing, transportation, compaction, curing
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 27 to 35 (Length/spacing) + 1 900 400 BAGS Diameter 40.7 sunsphere None BIM is a software
8/14/2021 20:50:11 8 / 20 Khan Mujahid Ahmed ETABS reinforcement theory of structures floor to floor level sunk to sunk level reinforced hard slab All Of The Above plate connection building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 20 (Length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1400 - Column & Beam Software
8/14/2021 21:30:12 8 / 20 Sayed Aman Sayed Gaffar ETABS request for information top of slab floor finish level structure surface level rectangular hollow section All Of The Above bracket building information modelling
Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 26 C to 35 C (Length/spacing) + 1 900 kg 375 BAGS Depth of Slab or Beam Minus Bottom Cover 94 matrimandir None process
8/14/2021 21:39:47 8 / 20 Amanullah Khan Quantity Survey index theory of structure finish floor level structure slab level rectangular hollow section All Of The Above L section steel Building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof Scaffold and Trench collapse 30 to 120 (Opposite length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1.226 Round None Software
8/14/2021 21:51:35 8 / 20 Abhishek Chapkarande Quantity Survey request for information theory of structure finish floor level silicon sanitary sealant rectangular hollow section All Of The Above bolted connection building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above between 26°c to 35°c (Length/spacing) + 1 900 kg 375 BAGS Diameter 35.31cft auroville Column & Beam software
8/14/2021 21:58:42 8 / 20 TEJAVATH SURESH Quantity Survey Request for inspection Top of slab Finished floor leval Structural surface level Right hand side or rectangular hollow section All Of The Above Cleat joint Building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 degree (Opposite length/spacing) + 1 900 400 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440 GLOBAL VERSION Column Software
8/14/2021 22:13:46 8 / 20 Rupeshwar kumar yadu Quantity Survey Request of information Terms of service Finished floor level Secure sockers layer Right hand side All Of The Above L joint Building information modelling
Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 99 (Opposite length/spacing) + 1 900 kg 375 BAGS Depth of Slab or Beam Minus Top Cover Cement portland 1506 kgs per cubic feet. Not. BIM is aColumn
process& forBeam
creating and modelling information on a contrucation project across the project lifecycle
8/14/2021 22:26:50 8 / 20 Abid khan ETABS request for information top of slab finished floor level structural slab level rectangular hollow section All Of The Above Rivet joint building information modelling
Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 26.7°C to 35°C (Length/spacing) + 1 900kg 375 BAGS Diameter 1440 Hexagonal None software
8/14/2021 22:32:06 8 / 20 Subham Choudhury ETABS request for information terms of service finished floor level structural slab level rectangular hollow section All Of The Above bolted framed steel beam connection building information modeling
Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 26.7°c and 35°c (Length/spacing) + 1 900 kg 402 BAGS Diameter 1440kg/m^3 matrimandir None process
8/14/2021 22:36:11 8 / 20 Shadab Khan Quantity Survey Request for information Top of steel/slab Finish floor level Structural floor level Rectangular hollow section All Of The Above L-joint Building information modeling
Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 26.7 and 35°c (Opposite length/spacing) + 2 90 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1.2 Matrimandri(geodesic some) Column Process
8/14/2021 22:43:25 8 / 20 Karan Thakur Quantity Survey Request for information Theory of structure Finished floor level Structure slab level Rectangular hollow section All Of The Above Unstiffened bolted connection Building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above Between 26.7-35 degree celcius (Length/spacing) + 1 900 kg 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.32 Golden ball building tamil nadu None Software
8/14/2021 23:25:59 8 / 20 Ankit bisht Curtain Walls In Revit Request for information Tooles of symphonia Full forms list Secure sockets layer Right hand side All Of The Above Plate joint Building information modelingBatching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 27+- 2 degree (Opposite length/spacing) + 1 900 kg 375 BAGS Diameter 50846.4 cubft No Column & Beam Education door media
8/14/2021 23:46:43 8 / 20 Umar Quantity Survey Request for information Theory of structure Finish floor level Structure surface level Rectangular hollow section All Of The Above Unstiffened bolted seat connection Building information modeling
Compacting, Mixing, Placement, Batching and Transporting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7 to 35 degree Celsius (Opposite length/spacing) + 1 900kg 375 BAGS Diameter 1440kgs/m3 Matrimandir Column & Beam Software
8/14/2021 23:51:42 8 / 20 LOGESHWARAN Quantity Survey Request for information Term of service Finished floor level Structural slab level Rectangular hollow section All Of The Above Unstiffened bolted steel connection Building information moduleBatching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above Between 26.5 to 35 (Length/spacing) + 1 900 375 BAGS Diameter 96 Geodesic dome None Creating and managing information on a construction project.
8/14/2021 23:52:16 8 / 20 Sauban Sajid Savkar Quantity Survey Roof floor index top of slab Floor level Structure surface level Rectangular hollow Section All Of The Above Fillet joint Building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 C. (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440kg/m3 mantri mandir Beam Process.
8/15/2021 0:24:21 8 / 20 Maksud alam Curtain Walls In Revit Request for information Top of steel Floor finish level Structure slab level Rectangular hollow section All Of The Above Seat angle Building information modeling
Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 26.7°c to 35°c (Length/spacing) + 1 900kg 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1.226cubic feet Semi circular building Column & Beam Revit the bim process allows all stakeholder
8/15/2021 1:04:08 8 / 20 Kaushlendra kumar nigam Quantity Survey Request for information Top of steel Finished floor level Structure surface level Rectangular hollow sections All Of The Above Bolted connection Building information modeling
Compacting, Mixing, Placement, Batching and Transporting
Duck Framed Roof, Indigo Roof, Belli Roof Scaffold and Trench collapse 26.7and 35 (Length/spacing) + 1 900kg 375 BAGS Diameter 1440 The matrimandir in pondicherry Column & Beam Process
8/15/2021 7:07:27 8 / 20 Pratyush kumar sethi Quantity Survey request for information term of service federal firearms license secure sockets layer right heart side All Of The Above shear connection building information modeling Batching, mixing, transportation, compaction,curingGable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7°c to 35°c (Opposite length/spacing) + 1 900kg 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 35.3147 cft Matrimandir, Auroville Column & Beam software
8/15/2021 8:25:20 8 / 20 Imran khan Quantity Survey Request for information Term of service Federal forearm license Structure surface layer Rectangular hollow section All Of The Above Strut Building information & modeling
Transportating,batching, mixing ,compacting, placement
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26°-35° (Length/spacing) + 1 900 375 BAGS Diameter 43 Dome Column & Beam Process
8/15/2021 8:44:26 8 / 20 Hemanta Kumar sahu ETABS request for application terms of service federal firearms license secure sockets layer right hand side All Of The Above Unistrut 1-5/8" 90 Fitting P1026EG building information modelling batching,mixing, transporting, compacting, curingGable Roof, Gambrel Roof, Shed Roof All Of The Above between 26.7°C and 35°C (Length/spacing) + 1 900kg 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440kgs/m3 Auroville Column & Beam Process
8/15/2021 8:55:03 8 / 20 Rabindra Pantha Quantity Survey request for information time of supply federal fiearms licence structure surface level rectangular hollow section All Of The Above butt joint building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Length/spacing) + 1 900kg 374 BAGS Diameter 40.8 Matrimandir Column software
8/15/2021 9:19:10 8 / 20 Md Mashiullah Quantity Survey request for information theory of structure finished for level structural slab level rectangular hollow sections All Of The Above Revit joint Building information modeling
Compacting, Mixing, Placement, Batching and Transporting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above Now (Opposite length/spacing) + 1 Good 402 BAGS Depth of Slab or Beam Minus Bottom Cover 1:2:3 arch Column & Beam no
8/15/2021 9:21:59 8 / 20 Sunny Kumar ETABS request for information theory of structure first floor level structural slab level rectangular hollow section All Of The Above Shear connection building information modeling
Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 35 (Length/spacing) + 1 900 375 BAGS Diameter 407.9 Matrimandir None Process
8/15/2021 9:35:11 8 / 20 Kunal gedam Quantity Survey request for information top of steel finish floor level structure surface level rectangular hollow section All Of The Above Simple connection building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof Scaffold and Trench collapse 26.7°C (Opposite length/spacing) + 1 720 kg 375 BAGS Diameter 1440 kgs/m3 auroville golden globe None software
8/15/2021 9:52:38 8 / 20 Building information modeling Quantity Survey request for information theroy of structure Finish floor level structural salb level Rectangular Hollow Sections All Of The Above buit Building information modelingBatching, Mixing, Placement, Batching and CompactingGable Roof, Gambrel Roof, Shed Roof All Of The Above between 26.7°C and 35°C. (Length/spacing) + 1 900 374 BAGS Diameter 1.22cft building information modelling
domeisstructure
a process for creating and managing information onColumn
a construction
& Beamproject across the project lifecycle. one of the key outputs of this process is the building information Model, the digital description of every aspect of the built asset.
8/15/2021 9:57:11 8 / 20 Shaik irshaad Quantity Survey radio frequency interference theory of structure finish flood level structure surface level rectangular hallow section All Of The Above bolted connection building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35° (Opposite length/spacing) + 1 900kgs 375 BAGS Diameter 1440 Don't know Column & Beam To design buliding
8/15/2021 10:03:29 8 / 20 Prachi Quantity Survey request for information terms of service federal firearms license secure sockets layer right hand side All Of The Above rivet joint building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 30 to 120 (Length/spacing) + 1 900 375 BAGS Diameter 1.226 gumbed building Column process
8/15/2021 10:37:22 8 / 20 Shubham Dayanand Sawant Quantity Survey request for information Theory of structure First floor level Second floor level Right hand side All Of The Above Bolted Building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 25 (Opposite length/spacing) + 2 18x50 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 333.3 Dome Column Process
8/15/2021 10:53:05 8 / 20 Rameez raja ETABS Rapid flow index Theory of structure federal firearms license secure sockets layer right hand side All Of The Above end to end Building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 30 to 120F (Opposite length/spacing) + 1 900kg 374 BAGS Diameter 1440 domed Column process
8/15/2021 10:55:15 8 / 20 CHARANJEET Singh Quantity Survey Request for information Theory of structure Finished floor level Structure surface level Right hand side All Of The Above T joint Building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7 to 35° c (Length/spacing) + 1 900 kg 400 BAGS Diameter 42.64 No idea a Column & Beam process
8/15/2021 11:10:50 8 / 20 Suraj Sitaram warkhad ETABS request for information theory of structure finished floor level structure surface level rectangular hollow section All Of The Above Unistrut building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7 to 35 (Opposite length/spacing) + 1 900 374 BAGS Diameter 1.226 Matrimandir None Software
8/15/2021 11:13:09 8 / 20 SHIVAKUMAR I HOSAPETI Quantity Survey request for information terms of service floor finish level structural slab level rectangular hollow section All Of The Above butt joint building infrastructure modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35 (Length/spacing) + 1 900 375 BAGS Diameter 1440 don't know None software
8/15/2021 11:15:09 8 / 20 Md Mahtab Khan ETABS request for information Testing operation system finished floor level structural slab level rectangular hallow section All Of The Above Welded frame building information modellingBatching, Mixing, Placement, Batching and Compacting None Of The Above All Of The Above 70 degree c (Length/spacing) + 1 900 374 BAGS Diameter 1.226 I don't know Beam Yes
8/15/2021 11:19:25 8 / 20 Debashreeta Mohapatra ETABS request for information terms of service federal firearms license secure socket layer right hand side All Of The Above shear connection building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7°-35° (Length/spacing) + 1 58.26 375 BAGS Diameter 1440 matrimandir auroville Column & Beam no
8/15/2021 11:25:11 8 / 20 Subhadip Pal ETABS room for improvement toasteros operating system finished floor level structural slab level right angle-hypotenuse side All Of The Above bolt connection building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above between 26.7°c and 35°c (Length/spacing) + 1 900kg 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 68.03 kgs/ft³ auroville None software
8/15/2021 12:09:41 8 / 20 MD SHADAB KHAN Quantity Survey request for information theory of structure finish floor level structure surface level rectangular of hollow sections All Of The Above bolted framed steel beam connection building information modeling
Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above between 26.7 to 35 (Length/spacing) + 1 900 374 BAGS Diameter 1440 matrimandi auroville None process
8/15/2021 12:23:31 8 / 20 Shadab ali Quantity Survey request for information theory of structure first floor level structure surface level Rectangular hallow section All Of The Above Beam connection building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 40°c (Length/spacing) + 1 900kg 374 BAGS Diameter 1.266 Circular tower building None Process
8/15/2021 12:27:41 8 / 20 Gobinda Gopal Giri Quantity Survey request for information theory of structure floor finish level structure slab level rectangular hollow section All Of The Above angle section building information modeling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above Limit between 26.7 degree Celsius and 35 degree Celsius (Opposite length/spacing) + 1 900kg 375 BAGS Depth of Slab or Beam Minus Bottom Cover 1440kg/m³ au
8/15/2021 13:31:57 7 / 20 Amit Singh Quantity Survey request for information theory of structure full flood level Not know Right hand side All Of The Above Lap splices Building information modellingBatching, Mixing, Transporting, Placement and Compacting
Sawer Roof, Skillet Roof, Domer Roof Scaffold and Trench collapse 27 degree Celsius (Length/spacing) + 1 900 kg 402 BAGS Depth of Slab or Beam Minus Top & Bottom Cover Not know Not know Column & Beam Process
8/15/2021 14:44:34 7 / 20 Manish kumar paswan ETABS Filter regulator lubricator Tape operating system Feberal firearms license Staff selection commission Right hand side All Of The Above Bolted framed connections Building information modellingBatching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above ASTM c1064-86 set maximum limit between 26.7c and 35.c (Length/spacing) + 1 400 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover Saltbox R Column & Beam Building information modelling is information across
8/15/2021 15:01:46 7 / 20 Faiyaz Alam Quantity Survey Request for information Theory of structure Floor finish level Structure slab level Rectangular hollow section All Of The Above Bolted Building information modeling Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof Falls from heights 26.5- 35c (Opposite length/spacing) + 1 900kg 375 BAGS Diameter 1440kgs/m³ I dont know Column Process
8/15/2021 17:00:43 7 / 20 Rathwa Kaushikkumar Quantity Survey request for information theory of structure finish floor levelffl structure surface level rectangular hollow section All Of The Above bolted connection building information modellingCompacting, Mixing, Placement, Batching and Transporting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7°C and 35° (Length/spacing) + 1 900 kg 374 BAGS Depth of Slab or Beam Minus Bottom Cover 1440kgs/m3 matrimander Column & AutoCAD.Building
Beam Design and Building Information Modeling (BIM) Software
8/15/2021 17:43:29 7 / 20 Qa Quantity Survey Request for information Top of steel Finished floor level Structure surface level Regular hollow section Shear Slump Holder Building information modelling Hand mixing Gable Roof, Gambrel Roof, Shed Roof Falls from heights 26 to 35c° (Opposite length/spacing) + 2 900kg 375Depth
BAGSof Slab or Beam Minus Top Cover, Depth of Slab or Beam Minus Top & Bottom Cover, Depth of Slab or Beam Minus 28.8
Bottom Cover Auroville Column & Beam Software
8/15/2021 17:48:07 7 / 20 Ankit jha Quantity Survey request for information theory of structure Finish floor level structural Slab level rectangular Hollow sections All Of The Above bolted connections building information modeling Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 26.7 to 35 celsius (Length/spacing) + 1 900 kg 374 BAGS Diameter 1.226 cft Don't know None software
8/15/2021 18:16:32 7 / 20 Md Sohail Quantity Survey Request for information Terms of service Floor finish level Structural surface level Rectangle hollow section All Of The Above Bolted angle Building information modeling Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof Falls from heights 35 (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Bottom Cover 1.226 Matrimandir Column & Beam Software
8/15/2021 19:26:55 7 / 20 Shaikh Bilal Curtain Walls In Revit Request for information table of specifications Floor finish level Structure slab level Rectangular Hollow Sections All Of The Above Unistrut Building information modeling Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 30 (Length/spacing) + 1 900 402 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 28 Matrimandir Column & Beam Software
8/15/2021 19:37:37 7 / 20 Shreedhar Tukaram Renuse Quantity Survey Request For Information Theory of structure Finished Floor Level Structural Slab Level Rectangular Hollow Sections All Of The Above Unistrut Building Information ModellingBatching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 35 (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 94 Matrimandir Column Software
8/15/2021 20:29:38 7 / 20 Rohit Goutam mishra Quantity Survey request for information term of service federal firearms license secure sockets layer right hand side All Of The Above Clear angle building information modeling Batching, Mixing, Transporting, Placement and Compacting None Of The Above Scaffold and Trench collapse 26.7 degree and 35 degree c (Length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440 kg/m2 cup building Beam Structural analysis
8/15/2021 20:58:24 7 / 20 Fenil Pabari Quantity Survey request for information terms of service federal firearms license secure sockets layer Right hand side All Of The Above bolted connection building information modeling Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above between 26.7°c and 35°c (Length/spacing) + 1 9000 402 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 2.8g Green Building None bim is a process
8/15/2021 22:10:40 7 / 20 Alok Raj Curtain Walls In Revit Request for information terms of service federal firearms license secure sockets layer right angle hypotenuse side All Of The Above cleat angle building information modellingBatching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above between 26.7°C and 35°C. (Length/spacing) + 1 50 374 BAGS Diameter 1440kgs/m3 Gold ball monument None revit,autodesk, bim360, allplan, navisworks
8/15/2021 22:54:32 7 / 20 Minakshi kasda Quantity Survey request for information terms of service federal firearms license secure socket layer right hand side All Of The Above T Building information modeling Compacting, Mixing, Placement, Batching and Transporting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35^0c (Length/spacing) + 1 900 375 BAGS Diameter 68.15 XYZ Column & Beam 3d design and modelling software
8/15/2021 23:24:10 7 / 20 SATHAM HUSSAIN Curtain Walls In Revit room for improvement theory of structure floor finish level structure surface level rainwater harewasting system Collapse Slump base plate bolted connection building information modeling Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 35 c (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top Cover 40.87 golden boll None process
8/15/2021 23:54:16 7 / 20 pankaj Kumar Quantity Survey Request for information Term of service Finish floor level Structural slab level Right hand side All Of The Above Unistruct joint Board of industrial management Batching, Mixing, Transporting, Placement and Compacting
Duck Framed Roof, Indigo Roof, Belli Roof All Of The Above 27to35degree (Length/spacing) + 1 900kg 375 BAGS Diameter 1450kg/cum Gola kar Column SketchUp ravit autocadd neviswork archicadd
8/16/2021 0:03:37 7 / 20 pankaj Kumar Quantity Survey Request for information Term of service Floor finish level Structural slab level Right hand side All Of The Above Unistruct joint Board of management Batching, Mixing, Transporting, Placement and Compacting Duck Framed Roof, Indigo Roof, Belli Roof All Of The Above 27to35degree (Length/spacing) + 1 900 375 BAGS Diameter 1450kg/cum Game zone Column Neviswork archicadd ravit SketchUp autocadd
8/16/2021 1:35:44 7 / 20 Amit Kumar Quantity Survey request for information theory of structure fleshing floor level structure surface level rectangular hollow sections All Of The Above genuine unistrut P1026-EG 2 hole 90 degree connector bracket for all 1-5/8" strut channel
building information modeling
Batching, Mixing, Transporting and placing of concrete, CompactingNone Of The Above All Of The Above ASTM C 1064-86 set a maximum limit between 26.7°C and 35°C. (Opposite length/spacing) + 1 900kg 375 BAGS Diameter 1.226 cft. Matrimandir None BIM is a process that is enabled by technology and software
8/16/2021 5:57:49 7 / 20 Harish venkta Krishna Quantity Survey request for feild inspection top of slab finished floor level structural slab level rectangular hallow section True Slump ms l angle joint building information modellingBatching, Mixing, Transporting, Placement and Compacting None Of The Above Falls from heights 35 degree (Length/spacing) + 1 900 kg 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 45.34 kg Puducherry Beam process
8/16/2021 8:51:11 7 / 20 tallapally manikanta Quantity Survey request for information terms of service front floor level structural surface level rectangular hollow section All Of The Above bolted welded steel connection building information module Compacting, Mixing, Placement, Batching and Transporting None Of The Above All Of The Above 35°c (Opposite length/spacing) + 1 900 402 BAGS Diameter 1.226cft matrimandir Column & Beam software
8/16/2021 10:53:42 7 / 20 INTEKHAB ALAM Quantity Survey Request for information Top of steel Finish floor level Structure surface level Rectungular hollow section All Of The Above L bar bolt Building information modeling Compacting, Mixing, Placement, Batching and Transporting None Of The Above All Of The Above 26 to 35 C (Opposite length/width) + 1 900 kg 374 BAGS Depth of Slab or Beam Minus Top Cover 1440 kg/m3 Dome Column Process
8/16/2021 11:29:53 7 / 20 Najeeb Patel Mabud Quantity Survey Request for information Theory of structure Finish floor level Structure surface level Right hand side All Of The Above Bolted connection Building information modeling Batching, Mixing, Transporting, Placement and Compacting
Sawer Roof, Skillet Roof, Domer Roof All Of The Above 35°C (Opposite length/spacing) + 1 900kg 375 BAGS Diameter 1440 Matrimandir None Software
8/16/2021 13:11:50 7 / 20 Dibyendu Dutta Quantity Survey Forest Research Institute top of slab finish floor level structure surface level rectangular hollow section All Of The Above angle clip building information modellingBatching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 30°F to 120°F (Length/spacing) + 1 900 400 BAGS Diameter 1440kg No Column a process
8/16/2021 14:44:00 7 / 20 Rahul kumar Quantity Survey raise for information top of structure floor finish level structure surface level rectangular hollow section All Of The Above base plate building information modeling Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 1.5 hours (Length/spacing) + 1 900kg 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.78 kg matrimandir Beam to know quantity of various material
8/16/2021 14:57:41 7 / 20 Pratik Sanjay Baikar Quantity Survey request for information terms of service federal firearms license secure sockets layer right hand side All Of The Above shear connection building information modelling batching,mixing,transporting,compaction,curing None Of The Above All Of The Above 35 (Opposite length/spacing) + 1 900 375 BAGS Diameter 40.77 the matrimandir in auroville, tamil nadu, india. it is a process None
for creating and managing information on a construction project across the project lifecycle.
8/16/2021 18:13:32 7 / 20 Abhishek Thakur Quantity Survey request for information. theory of structure. full flood level Structure surface level. rectangular hollow section . All Of The Above angle section used. building information modeling.Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 27 (Length/spacing) + 1 180 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 4724.64 green Column & Beam process.
8/17/2021 8:22:02 7 / 20 Kantosh Tripura Quantity Survey request for information terms of service floor finish level structure slab level rectangular hollow section All Of The Above welding building information modelingBatching, mixing, transporting, Compacting and Curing None Of The Above All Of The Above between 27 to 37 (Length/spacing) + 1 900 374 BAGS Diameter 40.8 Auroville matrimandir Beam software
8/17/2021 16:55:29 7 / 20 Lavkush Kumar Quantity Survey REQUEST FOR INFORMATION TOP OF SLEEVE FLOOR FINISH LEVEL STRUCTURE SLAB LEVEL RIGHT HAND SIDE All Of The Above SPLIT TEE BUILDING INFORMATION MODELING Compacting, Mixing, Placement, Batching and Transporting
Gable Roof, Gambrel Roof, Shed Roof Scaffold and Trench collapse PIPING INDUSTRY (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.8 4 Column & Beam REVIT
8/17/2021 17:00:09 7 / 20 SOUVIK BERA Curtain Walls In Revit Request for information Theory of structure Finish floor level Structural slab level Right hand side All Of The Above Bolted framed Building information modellingCompacting, Mixing, Placement, Batching and Transporting None Of The Above All Of The Above 26.7C-35C (Length/spacing) + 1 900 400 BAGS Diameter 1440kgs/m3 Residential building None A process for creating and managing information on a construction project
8/18/2021 14:23:24 7 / 20 Jaikaran yadav Quantity Survey Request for information Terms of service Finish floor level Structure surface level Rectangular hollow section All Of The Above Column bolted connection Building information modeling Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above Between 26.7°c to 35°c (Opposite length/spacing) + 2 50,40,30,25,20 kg cement bag. 375 BAGS Diameter 35.3147 cubic feet I don't know.but this is amazing. Building information modeling Noneis a process for creating and managing information in a construction project across the project lifecycle..
8/18/2021 18:39:59 7 / 20 Quantity survey Quantity Survey request for information open to sky finish floor level structure surface level right-hand side True Slump I don't Know Building Information modellingBatching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above between 26.7°C and 35°C. (Length/spacing) + 1 900kg 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1.2 I don't know None a process that is enabled by technology and software.
8/18/2021 18:44:44 7 / 20 Darshan Narendra Potdar Quantity Survey request for information Theory of structure Finish Floor level Structural floor level Rectangular hollow section All Of The Above . Building information modelingBatching, Mixing, Placement, Batching and Compacting Gable Roof, Gambrel Roof, Shed Roof Scaffold and Trench collapse 10-30 c (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 94 . Column Software
8/18/2021 22:23:27 7 / 20 Ranjit Sanfui Quantity Survey request for information trems of use federal firearms license secure sockets layer right-hand side All Of The Above 90 degree bracket building information modellingCompacting, Mixing, Placement, Batching and Transporting None Of The Above All Of The Above 70c (Length/spacing) + 1 900kg 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440kg Matrimandir Column & Beam a process
8/19/2021 11:30:06 7 / 20 Gulshan Thapa Quantity Survey Request for information Term of service Federal firearms liscense Secure socket layer Rectangular hollow section All Of The Above T Building information modellingBatching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 25 (Length/spacing) + 1 50 375 BAGS Depth of Slab or Beam Minus Bottom Cover 1440 NA Column Software
8/19/2021 11:38:03 7 / 20 Saismita Priyadarshini Quantity Survey request for information terms of service finish foor level structure surface level rectangular hollow section All Of The Above angle bracket building information modeling Compacting, Mixing, Placement, Batching and Transporting
Gable Roof, Gambrel Roof, Shed Roof Falls from heights 95°F (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440kg/m3 Aurovil Beam Processor
8/19/2021 12:07:10 7 / 20 Pradeep kumar Quantity Survey raise for inspection term of service finishing floor level structure surface level right hand side All Of The Above shear connection building information modeling batching,mixing,transportation,compaction,curingGable Roof, Gambrel Roof, Shed Roof All Of The Above 95F (Length/spacing) + 1 900kg 374 BAGS Diameter 35.314 Matrimandir Column & Beam Process
8/19/2021 13:34:17 7 / 20 Edden Zahoor Wani Quantity Survey Request for Information Testing Operation System Finished Floor Level. Structural Slab Level Rectangular Hollow Sections All Of The Above L section Building information modeling Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 36 (Opposite length/spacing) + 2 900 374 BAGS Depth of Slab or Beam Minus Top Cover 50 Dome Column Process
8/19/2021 13:41:41 7 / 20 Zaik Quantity Survey request for information theory of structure finish floor level structure surface level radioshock corp&period All Of The Above I don't know Building information modeling Batching, Mixing, Transporting, Placement and Compacting None Of The Above Falls from heights 70°C (Length/spacing) + 1 900 374 BAGS Diameter 35.3 I don't know Column & Beam Software
8/19/2021 17:41:50 7 / 20 Imrahan ansari Quantity Survey request for information terms of service federal firearms license structure surface leyer rectangular hollow sections True Slump L building information modeling Compacting, Mixing, Placement, Batching and Transporting
Duck Framed Roof, Indigo Roof, Belli Roof Falls from heights astm c94 (Opposite length/width) + 1 900 375 BAGS Depth of Slab or Beam Minus Top Cover 130 cybertecture Column & Beam Process
8/14/2021 11:29:15 6 / 20 Rohit Chavan ETABS Request For Information Theory of structure Federal Firearms License Secure Sockets Layer Rectangular Hollow Sections All Of The Above In this Noprocess, all the materials are thoroughly
Building
mixedInformation
in required Modelling
proportions until the paste shows uniform color and consistency.
GableHand
Roof,mixing
Gambrel
andRoof,
machine
Shed
mixing
Roof are the two different methods of mixing.
All Of The Above No (Opposite length/spacing) + 1 No 402 BAGS Depth of Slab or Beam Minus Top & Bottom Cover No No Column & Beam No
8/14/2021 11:33:21 6 / 20 Lalrokhawm Quantity Survey Request for information Terma of Service Federal Firearm License Secure Socket Layer Right Hand Side Collapse Slump Elbow joint Building Informationn ModellingBatching, Mixing, Transporting, Placement and Compacting
Sawer Roof, Skillet Roof, Domer Roof Scaffold and Trench collapse 70C (Opposite length/spacing) + 1 90 402 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 12 Matrimandir Column & Beam Process
8/14/2021 11:41:53 6 / 20 Vicky kelkar ETABS request for information terms of service finish floor level secure socket layer rectangular hollow section All Of The Above crank building information modeling curing Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26-35 (Length/spacing) + 1 900kg 374 BAGS Diameter 50860.5 arrocle None software
8/14/2021 11:47:41 6 / 20 Vikas Quantity Survey Request for information Top of stell Finish floor level Structural slab level Rectangular hollow stand All Of The Above Sockets joint Building information modeling Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 95degree F (Opposite length/spacing) + 2 900kg 402 BAGS Diameter 0.034 Building Beam Software
8/14/2021 11:52:57 6 / 20 Jayanto Chakraborty Quantity Survey Request For Information Top of Steel Finished Floor Level Structure SurfaceLevel Rectangular Hollow Section All Of The Above 90 Degrees Right Angle Building Information Modeling Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 35° C ( 95° F ) (Length/spacing) + 1 900 Kg 375 BAGS Diameter 1440kgs/m3 Matrimandir None process
8/14/2021 12:23:12 6 / 20 Rohit Metkari Quantity Survey Request For Information Top of steel or slab Finish floor level Structural slab Level Rectangular hollow section All Of The Above Cleat angle Building information modeling Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above between 26.7°C and 35°C (Length/spacing) + 1 900kg 375 BAGS Diameter 35.3 cubic feet Golden ball building, Tamil Nadu Beam BIM is a process that Is enabled by Software
8/14/2021 12:33:22 6 / 20 Pratik Ramakant Metkari Quantity Survey request for information Theory of structure finishe floor level structural slab level Right hand side All Of The Above Cleat angel building information modeling Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 26° to 35° (Opposite length/spacing) + 2 900kg 375 BAGS Diameter 1440 kg/m³ Spaceship earth None Software
8/14/2021 12:34:40 6 / 20 Shaik Mohammed Ismail Quantity Survey Request for information Top of stell/slab Finished floor level Structure floor level Rectangular hallow section All Of The Above Cross joints Building information modelling Batching,mixing, transportion,compaction,curing, None Of The Above Falls from heights Between 26.7°©to 35°© (Length/spacing) + 1 900kg ,1 bag cement 50 kg 50*18=900 374 BAGS Depth of Slab or Beam Minus Bottom Cover 1440 Dome structure/ Column & BeamTo genarate manage building data during project of life cycle
8/14/2021 12:36:57 6 / 20 Sanjiv Kumar Quantity Survey request for information top of steel finish floors l level structure slab level rectangular hollow section All Of The Above l shape connection building information modeling Batching, Mixing, Transporting, Placement and Compacting
Sawer Roof, Skillet Roof, Domer Roof Scaffold and Trench collapse maximum value is 35⁰ c (Opposite length/width) + 1 900 375 BAGS Depth of Slab or Beam Minus Bottom Cover 1440kgs/m³ auroville mothers earth temple None software
8/14/2021 12:38:44 6 / 20 Faisal athar Quantity Survey request for investigation theory of structure finish floor level structur surface level right hoand side All Of The Above Plate connections building information modeling Batching, Mixing, Transporting, Placement and Compacting
Sawer Roof, Skillet Roof, Domer Roof All Of The Above 30 f (Length/spacing) + 1 900 kg 374 BAGS Diameter 40.78 kgsper cft No Column Process
8/14/2021 12:39:59 6 / 20 Pawan Negi Quantity Survey Request for infprmation Term of service Federal firearms license Secure sockets layer Rectangular hollow section All Of The Above Clean angle Building Information modellingBatching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof Scaffold and Trench collapse 26-35 (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1.2 Altar headquarter building for creating
None and managing information on a construction project across the project life cycle.
8/14/2021 12:47:49 6 / 20 Dheeraj Meharwade Quantity Survey request for information top of slab finished floor level structural slab level rectangular hollow section All Of The Above bolted joint building information model
batching, mixing, transporting, compaction and leveling, curing. None Of The Above All Of The Above 26.7 degree Celsius and 35 degree Celsius (Length/spacing) + 1 900kg 375 BAGS Depth of Slab or Beam Minus Bottom Cover 1.226cft BIM or Building InformationAurovilla
Modelling golden
is a process
globe for creating and managing information on aNone construction project across the project lifecycle. One of the key outputs of this process is the Building Information Model, the digital description of every aspect of the built asset.
8/14/2021 12:55:36 6 / 20 BALAJI V Quantity Survey request for information terms of service federal firearms license secure sockets layer right hand side All Of The Above bolted connections building information modellingBatching, Mixing, Transporting, Placement and Compacting None Of The Above Scaffold and Trench collapse 95°f (Length/spacing) + 1 900 375 BAGS Diameter 35.314 golden dome of temple in auroville None 3d design and modeling software
8/14/2021 12:59:33 6 / 20 SHOUMITRA NAYEK ETABS request for information terms of service federal firearms license structure surface level remote shell All Of The Above bolt building information modeling Batching, Mixing, Transporting, Placement and Compacting
Duck Framed Roof, Indigo Roof, Belli Roof Falls from heights 10 (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top Cover 40.78 donot know None process
8/14/2021 12:59:46 6 / 20 Diwakar Shukla Quantity Survey representative fraction index theory of structure full flood level structure surface level rectangular hollow section All Of The Above Lug angle Beam Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 37 (Opposite length/spacing) + 1 900 400 BAGS Diameter 1440 no Column software
8/14/2021 13:01:18 6 / 20 Ganesh saudagar Quantity Survey request for information top of slab construction front-end loading structure slab level reactangular hollow seaction All Of The Above joint connection building information modeling Compacting, Mixing, Placement, Batching and Transporting None Of The Above All Of The Above 35°C. (Opposite length/spacing) + 1 900 375 BAGS Diameter 1440 auroville for creating
None and managing information on a construction project across the project lifecycle.
8/14/2021 13:09:16 6 / 20 Adesh Nayak ETABS rfi theory of structures free flow level ssl right hand side All Of The Above connection bim Batching, Mixing, Placement, Batching and Compacting None Of The Above All Of The Above 27 (Length/spacing) + 1 1000 kg 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 2400 dome Column & Beam Process
8/14/2021 13:17:23 6 / 20 Rahul Kumar prajapat Quantity Survey Request for information Terms of service Federal firearms license Secure sockets layer Right hand side All Of The Above Bolted connection Building information modeling Batching, Mixing, Transporting, Placement and Compacting
Sawer Roof, Skillet Roof, Domer Roof Scaffold and Trench collapse 26.7°c to 35°c (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top Cover 1440kgs/m³ Matrimandir a process
Column for&creating
Beam and managing information on a construction project across the project lifecycle
8/14/2021 13:32:29 6 / 20 Civil engineering Curtain Walls In Revit roof finish level Top of steel / slab Floor finish level Slab surface level Rectangular hello section All Of The Above Cleat angle revit weld type Building information modeling Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 80⁰cetigrade (Length/spacing) + 1 900 kg 375 BAGS Depth of Slab or Beam Minus Bottom Cover 41kg/cubic feet Arch type Column & Beam Process
8/14/2021 13:34:50 6 / 20 Yash prajapat Quantity Survey Request for information Theory of structure Federal firearms license Secure socket layer Right hand side All Of The Above Angle connection Building information model Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 22 degree (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top Cover 1506 H Column & Beam Digital software for Construction site planning
8/14/2021 13:36:00 6 / 20 Ravi meghwal Quantity Survey request for information theory of structure federal firearms license secure sockets layer right hand site All Of The Above weld connection building information modelling
Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 27℃ (Length/spacing) + 1 900kg 402 BAGS Diameter 35.315 cft Mercentail building Beam building construction
8/14/2021 13:36:45 6 / 20 Ashwani kumar mainwal Quantity Survey Request for information Temporature of slab Floor finishing level Structural slab level Right hand side All Of The Above Strut Building information modelling,Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 21.8.c (Length/spacing) + 1 918 Depth
400 BAGS
of Slab or Beam Minus Top Cover, Depth of Slab or Beam Minus Top & Bottom Cover, Depth of Slab or Beam Minus Bottom
2400 Cover, Diameter Lotus None Software
8/14/2021 13:38:38 6 / 20 Vikas kumar Quantity Survey Request for information Terms of service Floor finish level Structural slab level Right hand side True Slump Bat joint Board of industrial management Batching, Mixing, Transporting, Placement and Compacting
Duck Framed Roof, Indigo Roof, Belli Roof Scaffold and Trench collapse 35 (Opposite length/spacing) + 1 900 375 BAGS Diameter 0.0347 Gumbad None Design
8/14/2021 13:39:24 6 / 20 Fareedudheen latheef Quantity Survey Request for inspection Top of slab Finished floor level Structural surface level Right Hand side All Of The Above L angle Bulding information modeling Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 32 degree Celsius (Length/spacing) + 1 900 kg 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 35.3147 Matrimandir None For building design
8/14/2021 13:39:41 6 / 20 GANDHI CHAUHAN Quantity Survey Request for information Top of slab Finish floor lavel Structural slab lavel Recentiguler hollow section All Of The Above Juction joint Building information modelingBatching, Mixing, Placement, Batching and Compacting Sawer Roof, Skillet Roof, Domer Roof All Of The Above American society for Testing for material (Opposite length/spacing) + 1 900 kg 400 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440 kg/cm Sqr Skip Column & Beam Skip
8/14/2021 13:42:08 6 / 20 Rahul roy Quantity Survey request for information terms of service federal fivearms license standard for secure sodkets layer rectangular hollo section All Of The Above Bolt joint building information models Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7-35 (Length/spacing) + 1 900 kg 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1.23 Bee building None software
8/14/2021 13:47:21 6 / 20 Chetansingh Chouhan Quantity Survey Request for information Theory of structure Floor finish level Secure socket layer Right angle hypotenuse side All Of The Above L connection Building information modellingBatching, Mixing, Transporting, Placement and Compacting None Of The Above Scaffold and Trench collapse 25°c (Length/spacing) + 1 900 kg 375 BAGS Diameter 1.226 cft Matrimandir None Process
8/14/2021 13:51:08 6 / 20 Vipul Verma Quantity Survey Request for information Thoery of Structures Finished Floor level Strutural Slab Level Rectangular Hollow Section All Of The Above L Section Building Information Model Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 25° (Length/spacing) + 1 900kg 375 BAGS Diameter 1440 Dome building None Sofware
8/14/2021 13:51:11 6 / 20 Himanshu Mehra ETABS request for information theory of structure finish floor level structure surface level rectungular hollow section All Of The Above L connector Building information modlingBatching, Mixing, Placement, Batching and Compacting None Of The Above All Of The Above 26.7 - 35 c (Length/spacing) + 1 50 kg 375 BAGS Diameter 0.034 m3 Unknown Column & Beam CAD
8/14/2021 13:54:10 6 / 20 Akash prasad Quantity Survey No Theory of structure Finish floor level No Right hand side All Of The Above No Building information modeling Batching, Mixing, Transporting, Placement and Compacting
Sawer Roof, Skillet Roof, Domer Roof All Of The Above 35 degree/c (Length/spacing) + 1 900 402 BAGS Diameter 0.032 No None Process
8/14/2021 13:58:44 6 / 20 Quatity survey Quantity Survey request for information terms of service federal firearms license secure sockets layer right hand side All Of The Above Bolted framed connection Building information modeling Compacting, Mixing, Placement, Batching and Transporting None Of The Above All Of The Above 26.7° to 35°C (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 94 None None software
8/14/2021 13:59:38 6 / 20 Devidas jadhav Quantity Survey Request for information Top of steel /slab Finish floor level Structure surface level Rectangular hollow sections All Of The Above Unistrut1-5/8" 90 fitting P1026EG 2 hole Building information modeling Batching, mixing, transportation, compaction, curing Gable Roof, Gambrel Roof, Shed Roof All Of The Above 65-93°c (Length/spacing) + 1 900 bag 400 BAGS Diameter 1.226 Auroville Column a process that is enabled by technology and software
8/14/2021 14:01:09 6 / 20 Archit Gupta Quantity Survey Request for information Top of steel Finish floor level Structure surface level Rectangular hollow section All Of The Above Rivit connection Building information modeling Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above Between 26 .5 and 35 (Length/spacing) + 1 900kg 400 BAGS Depth of Slab or Beam Minus Top Cover 1340 Gedesic dome Column Software
8/14/2021 14:10:33 6 / 20 SACHIN santosh Chaudhari Quantity Survey Sachin santosh Chaudhari terms of service Federal Firearms License secure sockets layer Right hand side All Of The Above Bolt Building Information ModellingBatching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 301.5 (Length/spacing) + 1 0.0125 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440 kg/ m³ Lotus Column & Beam 3D Design
8/14/2021 14:24:48 6 / 20 Pranab sharma Quantity Survey request for information top of steel floor finish level structure surface level rectangular hollow section All Of The Above seat angle building information modeling Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 301.5 (Length/spacing) + 1 1440 374 BAGS Depth of Slab or Beam Minus Bottom Cover 5t7 Yg Beam Ug
8/14/2021 14:30:49 6 / 20 WAGHMARE VIKRANT VAIJNATH Quantity Survey request for information Theory of structure FFL is Federal Firearms License. secure sockets layer right-hand side All Of The Above Unistrut P1026 Building Information ModellingCompacting, Mixing, Placement, Batching and Transporting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above ASTM C 1064-86 set a maximum limit between 26.7°C and 35° (Length/spacing) + 1 900kg 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440kgs/m3 BIM or Building Information
Matrimandir
Modellingmaditation
is a process
center
for creating and managing information on aNone construction project across the project lifecycle. One of the key outputs of this process is the Building Information Model, the digital description of every aspect of the built asset.
8/14/2021 14:32:35 6 / 20 Prakruthi C S Quantity Survey request for information terms of service federal firearms license secure sockets layer rectangular hallow section All Of The Above welded connection building information modeling batching, mixing, transportation, compaction, curing Gable Roof, Gambrel Roof, Shed Roof All Of The Above between 26.7°C and 35°C (Length/spacing) + 1 50kg for 1 bag so 900kg for 18bags 374 BAGS Diameter 1.226 cubic ft matrimandir None a process
8/14/2021 14:33:16 6 / 20 Tanmay saharkar Quantity Survey request for information Theory of structure finished floor level secure socket layer rectangular hollow section All Of The Above beam to column building information modeling Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above between 26.7°c to 35°c (Opposite length/width) + 1 900kg 375 BAGS Diameter 42.64 kg Office building None bim is a process.
8/14/2021 14:35:02 6 / 20 Amit Soni Quantity Survey Radio Frequency interference Term of Service Federal Firearms License Secure Sockets Layer Right hand side All Of The Above Unistrut P1068-GR 90 Degrees Fitting Building information modelling
Batching, mixing, transporting, compaction& levelling, Gable
CuringRoof, Gambrel Roof, Shed Roof All Of The Above Between 26.7 C and 35 C (Length/spacing) + 1 0.624996 m^3(cubic metre) 375 BAGS Depth of Slab or Beam Minus Bottom Cover 1.226 cft Auroville Golden Globe None Process
8/14/2021 14:39:48 6 / 20 Mohammad mahtab alam Quantity Survey request for inspection top of sleeve floor finish level structure slab level rectangular hollow section All Of The Above bolts building information modeling Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above nearest 1 degree (Opposite length/spacing) + 1 900kg 375 BAGS Diameter 1440 kg /M3 I don't know None It's a software
8/14/2021 14:47:57 6 / 20 MUBEEN Quantity Survey Request for information Terms of service Federal firearms license Secure sockets layer Right hand sight All Of The Above Bolted connection Building information modellingCompacting, Mixing, Placement, Batching and Transporting None Of The Above All Of The Above between 26.7°C and 35°C.16-Oct-2018 (Opposite length/spacing) + 1 50 374 BAGS Diameter Density of cement = 1440 kg/ m³ 1 bag = 50 kg of cement. 1 m³ = 35.3147 cubic feet. Statesman house delhi BIM or Building Information Modelling
None is a process for creating and managing information on a construction project across the project lifecycle
8/14/2021 14:50:22 6 / 20 Abdul Rahman Quantity Survey Request for information Term of service Federal firearms license Secure sockets layer Right hand side Collapse Slump Moulding Building information modelingBatching, Mixing, Placement, Batching and Compacting Gable Roof, Gambrel Roof, Shed Roof All Of The Above 30 (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Top Cover, Diameter 1.226 Globe Column & Beam Software
8/14/2021 14:52:01 6 / 20 Ravi Pratap Singh Quantity Survey request for information top of slab finish floor level structural slab level right hand side Shear Slump lap bharat industrial machineCompacting, Mixing, Placement, Batching and Transporting
Duck Framed Roof, Indigo Roof, Belli Roof Scaffold and Trench collapse Astm (Opposite length/width) + 1 900 402 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40kg golden Column process
8/14/2021 15:08:05 6 / 20 Pooja bhandari Quantity Survey Roof finish level Terms of service Floor finish level Structure slab level Right hand site All Of The Above Beam to column seet connection Bulding information modeling Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof Scaffold and Trench collapse 35 (Opposite length/spacing) + 1 900kg 400 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.8075 I don't know Beam Process
8/14/2021 15:27:03 6 / 20 Pratik rajiv kamble ETABS Request for inspections . Theory of structure Floor finish level Structural slab level Rectangular hollow section All Of The Above Bolt connection Building information modeling Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 10 C (Length/spacing) + 1 900 kg . 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1340 kg /CUM No Beam Process
8/14/2021 15:29:18 6 / 20 CIVIL ENGINEERING Quantity Survey reinforced fibre instruments total o full flood level simple staff levelling right hand supply All Of The Above Fillet build india model Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 20 (Opposite length/spacing) + 1 (50*18)= 900kg 375 BAGS Diameter 47. 9 Global monument Column related to building
8/14/2021 15:33:22 6 / 20 Vaibhav Patil ETABS Ready for investigation Theory of structure Floor finish level Structural slab level Right hand side All Of The Above Bolted Building information moduling Batching, Mixing, Transporting, Placement and Compacting
Duck Framed Roof, Indigo Roof, Belli Roof All Of The Above American society testing material (Length/spacing) + 1 50 375 BAGS Diameter 1440 N Column & Beam Software
8/14/2021 15:40:04 6 / 20 MD MAJEED Quantity Survey Request of information Terms of service Federal firearms license Security socket layer right hand side All Of The Above Bolted framed connection Building information modellingBatching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7 to 35 degree Celsius (Length/spacing) + 1 900 kg 375 BAGS Diameter 1440 kgs/m3 Spherical building None Software
8/14/2021 15:49:49 6 / 20 Ram Lakhan Quantity Survey Radio Frequency Interference terms of service Federal Firearms License secure sockets layer Rectangular Hollow Sections All Of The Above Bolted seated steel beem connection Building Information ModellingBatching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above C94 (Length/spacing) + 1 900kgs 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440kgs/m3 Matrimandir None 3D design and modeling software
8/14/2021 15:54:12 6 / 20 Ashhad Khan ETABS request for inspection top of soil floor finish level structure slab level rectangular hallow section All Of The Above L shaped buildings information modelingBatching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 13 (Length/spacing) + 1 900 375 BAGS Depth of Slab or Beam Minus Bottom Cover 94 Dome None process
8/14/2021 15:54:54 6 / 20 MOHAMMAD YASEEN MULLA Quantity Survey full repair and insuring Top of slab Finished floor level Structure slab level Right hand side All Of The Above Bolt Building information modeling Batching, Mixing, Transporting, Placement and Compacting
Duck Framed Roof, Indigo Roof, Belli Roof Scaffold and Trench collapse 35 (Length/spacing) + 1 900 374 BAGS Diameter 35.1 . None Process
8/14/2021 16:39:09 6 / 20 Manoranjan Majhi Quantity Survey Request for information Top of slab Finis floor level Structure slab level Rectangular hollar section All Of The Above Bolt Building information modelingBatching mixing transporting, compacting curing compacting None Of The Above All Of The Above 26.7 to 35 (Length/spacing) + 1 900 375 BAGS Diameter 35.31 Matrimandir Column & Beam Software
8/14/2021 16:41:09 6 / 20 Rushabh Sanjay Ghevade Quantity Survey Request for Information top of slab / steel finish floor level structural surface level rectangular hollow section All Of The Above angled connection building informationSitemodelling
Work,forming,mixing, placement, early finishing,Troweling,final finish,curing
None Of The Above All Of The Above 35 (Length/spacing) + 1 12.5 375 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 42.6 mother's temple None Pprocess
8/14/2021 16:46:22 6 / 20 Ajay som Quantity Survey Request for inspection Top of sleeve Finished flor level Structure slab level Right angle hupotenusebside All Of The Above Welded Building information modeling Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above 27 to 35 (Length/spacing) + 1 900 kg 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 40.776kg/ft3 Golden doom None Process
8/14/2021 16:49:08 6 / 20 Quantity survey Quantity Survey Request for information Terms of service Federal Firearms License Secure sockets layer Right hand side All Of The Above Clant angle Building Information Modelling Curing Duck Framed Roof, Indigo Roof, Belli Roof All Of The Above C94 (Opposite length/spacing) + 1 900 kg 375 BAGS Depth of Slab or Beam Minus Bottom Cover 42.64 kg House of worship None Process
8/14/2021 16:54:11 6 / 20 Mohd Afzal Quantity Survey Request for information Terms of service Federal firearms License Secure sockets layer The right hand side All Of The Above Welding connection Building information modeling Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 26.7 degree celciuos and 35 degree celcious (Length/spacing) + 1 900 Kg 375 BAGS Diameter 1440 kg per cubic meter Aurovile mother's earth temple None creating and managing information on a construction project
8/14/2021 16:56:39 6 / 20 Taj Mohammad ETABS request for information top of steel finish floor level secure sockets layer right hand side All Of The Above Welded connection building information modeling Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above between 26.7 to 35 (Length/spacing) + 1 90 402 BAGS Diameter 50853.12 kg/ft BIM or Building Information Modelling
Dome building
is a process for creating and managing information on aNone construction project across the project lifecycle. One of the key outputs of this process is the Building Information Model, the digital description of every aspect of the built asset.
8/14/2021 17:19:23 6 / 20 Hazrat Ali Quantity Survey Request for information Term of service federal firearm license secure socket layer right hand side All Of The Above L connection building information modeling Batching, Mixing, Transporting, Placement and Compacting
Sawer Roof, Skillet Roof, Domer Roof All Of The Above 35 (Length/spacing) + 1 900kg 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1440kg/m3 and 35.31kg/cubic feet Don't know Column Software
8/14/2021 17:26:12 6 / 20RUPEAHKUMAR VIJAYBHAI PRAJAPATI Curtain Walls In Revit request for information terms of service federal firearms license secure sockets layer right hand side All Of The Above Seat angle Building Information and management
Batching, Mixing, Transporting, Placement and Compacting
Sawer Roof, Skillet Roof, Domer Roof All Of The Above 10 (Opposite length/spacing) + 1 40 402 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 1.225 Egg building None Software
8/14/2021 17:43:39 6 / 20 Pawan kapse ETABS No Theory of structure No Super structure level Right hand side True Slump Bolt connection I don't know Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 30 (Opposite length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover, Depth of Slab or Beam Minus Bottom Cover 2 China's structure Column Don't know
8/14/2021 17:55:46 6 / 20 Manoj Kumar Quantity Survey request for information Top of Steel Floor finish level Structure Surface Level Rectangular hollow sections All Of The Above Joint pin Building information modeling Batching, Mixing, Transporting, Placement and Compacting None Of The Above Scaffold and Trench collapse 25 dig (Length/spacing) + 1 900 374 BAGS Depth of Slab or Beam Minus Bottom Cover 1.225 No Beam Desing
8/14/2021 17:58:48 6 / 20 Abuthakeer S ETABS request for information top of steel/slab finished floor level structural slab level rectangular hollow section All Of The Above column to beam connection building information modeling Batching, Mixing, Transporting, Compacting and Curing None Of The Above All Of The Above Between 26.7C to 35C (Opposite length/width) + 1 900kg 374 BAGS Diameter 2.8 Global version None software
8/14/2021 18:09:41 6 / 20 Imran Hussain Quantity Survey Request for information Top of steel Finished floor level Structure surface level Rectangular hollow section Collapse Slump Development length of beam in column Building information modeling Batching, Mixing, Transporting, Placement and Compacting None Of The Above Scaffold and Trench collapse 35° (Length/spacing) + 1 900 402 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 50840 Golden None Software
8/14/2021 19:04:58 6 / 20 Aakash Naganpure Quantity Survey request for information theory of structure finished floor level structure slab level rectangular hollow section All Of The Above seat angle building information modellingCompacting, Mixing, Placement, Batching and Transporting
Duck Framed Roof, Indigo Roof, Belli Roof All Of The Above 35 (Length/spacing) + 1 900 402 BAGS Diameter 35.3147 auroville Column processor
8/14/2021 19:07:01 6 / 20 Somiran pegu Quantity Survey request for information top of speed finish floor level structure surface level rectangular hollow section All Of The Above A1026- 2 hole 90° fitting Building information modeling Batching , mixing, transporting,compacting, curing Gable Roof, Gambrel Roof, Shed Roof All Of The Above ASTM C 1064-86 set a maximum limit between 26.7°C and 35°C. (Opposite length/width) + 1 90 374 BAGS Diameter BIM42.64
software
kg is 3D design and modeling software that can
Matrimandir
help optimize the work of designing for architecture, construction,
None plant, civil, and MEP projects. It does this by: helping make better design decisions and improve building performance.managing the design and construction of piping, structures, and processes
8/14/2021 19:40:38 6 / 20 Bachelor of engineering Quantity Survey N B B N Bi All Of The Above Bolt connections B Transporting, batching, mixing, placement and compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above H (Length/spacing) + 1 900kg 374 BAGS Depth of Slab or Beam Minus Top & Bottom Cover 41.8 Matrimandir Column & Beam software
8/14/2021 19:47:12 6 / 20 Mohd kamar Curtain Walls In Revit request for information Top of steel/slab floor finish level Structure slab level rectangular hollow section All Of The Above 90degree angle 2 hole Building information modeling Batching, Mixing, Transporting, Placement and Compacting None Of The Above All Of The Above C 1064-86 (Length/spacing) + 1 50kg, 40kg, 30kg, 25kg, 20kg 375 BAGS Diameter 1440kgs/m3 matrimandir None Building information modelling is a process
8/14/2021 19:47:51 6 / 20 Shashi Kumar H Quantity Survey Report first information Top of steel Finish floor level Surface starchers level Right hand side All Of The Above 90dgree angle cut Building information modeling Batching, Mixing, Transporting, Placement and Compacting
Sawer Roof, Skillet Roof, Domer Roof All Of The Above 27dgree (Length/spacing) + 1 90kgs 375 BAGS Diameter 42.64kg Sphere shape of building None Building information modeling
8/14/2021 20:40:15 6 / 20 AMRESH KUMAR Quantity Survey request for information top of structure finished floor level structure surface level rectangular hollow section All Of The Above riveted building information modeling batching, mixing, transpotation,compacting, Duck Framed Roof, Indigo Roof, Belli Roof All Of The Above 35 degree celcius (Length/spacing) + 1 900kg 375 BAGS Diameter 42.5 auroville None process
8/14/2021 22:46:46 6 / 20 Dipak Kumar Quantity Survey Request for information Theory of structure Finished floor level Structural slab level/ structural surface level Rectangular hollow section All Of The Above Supporting member Building information modeling Batching, Mixing, Transporting, Placement and Compacting
Duck Framed Roof, Indigo Roof, Belli Roof Falls from heights 26.7 degree Celsius to 35 degree Celsius (Length/spacing) + 1 900 kg 375 BAGS Diameter 1506 kg/cubic meter No i don't know these Column & Beam Is a software solutions revit,AutoDesk
8/14/2021 23:11:50 6 / 20 Kuldeep Kalpure Quantity Survey Request for information Terms of service Federal fivearms license Secure sockets layer Right and sight All Of The Above Al026-2 Hole 90' fitting Building information modelling
Hand mixing, machine mixing, transport and placing of concrete None Of The Above All Of The Above 26.7°C and 35°C (Opposite length/spacing) + 1 900kg 374 BAGS Diameter 1440kgs Matrimandir BIM is a process
Column for creating and managing information on a construction project across the project lifecycle
8/14/2021 23:46:16 6 / 20 Asim zia Quantity Survey request for information terms of service finsh floor level structure surface level rectangular hollow section Collapse Slump embedment lenght building information modeling Batching, Mixing, Transporting, Placement and Compacting
Gable Roof, Gambrel Roof, Shed Roof All Of The Above 25 degree (Length/spacing) + 1 900 375 BAGS Diameter 1.226 barcelouna circular Beam infrastructure going beyond construction drawings cad tools architecture act
8/14/2021 23:54:05 6 / 20 Narendra Singh Quantity Survey request for information top of slab finished floor level structural slab level rectangular hollow section True Slump don't know building information modeling Batching, Mixing, Transporting, Placement and Compacting
Duck Framed Roof, Indigo Roof, Belli Roof Scaffold and Trench collapse 30°-35° (Length/spacing) + 1 900 374 BAGS Diameter 1440 kg/m3 don't know. Sry Column it is a fentastic learning course
8/1