Professional Documents
Culture Documents
ftqq75u6: updation in Fixed Asset Register (!'r\R) fbr the year 201g-20 and
2A20- 2027-reg.
As per HQ instructions,the target date for updating FAR 2019-20 and 2020-21 is
fixed as 1510712021.
All are instructed to update the FAR details pertaining to new Asset included
and DS-S done in the respective year as early as possible.The user-id is the PF Number
of the SSE-in-Charge.Password details and updation can be done in coordination with
SSE/Signal/HQ and SSE/Te1e/HQ
/MAS
/ST.DSTE/Co-Ord/MAS