You are on page 1of 50

The Centre of Excellence for Construct IT has been set up to

co-ordinate and promote research in IT in Construction in the UK


to improve competitive performance of the UK construction industry
The administrative office of the Centre is based at Bridgewater Building,
University of Salford, Salford, M7 9NU, UK.
Organisations who have expertise in their use of IT are invited to approach the Centre.
Please contact the administrators if you wish to become a member.

SPICE FM
A step by step organisational development framework
for facilities management

£ 30.00
SPICE FM Framework SPICE FM Framework

SPICE FM* Foreword

Panel of Experts On behalf of the Secretary of State for Health my business is developing policy and
improving performance of buildings and services within the NHS, the largest estate
Peter Wearmouth (Chair) NHS Estates portfolio under Government responsibility in Europe.
Marjan Sarshar (Project Manager) University of Salford
Ron Stone (Champion) NHS Estates This brings together professionals and specialists from many disciplines operating within a
Robert Jackson (DETR Project Manager) Davis Langdon change management system as the healthcare estate adjusts to the modernisation agenda.
Keith Alexander Centre for Facilities Management In simple terms, this entails management of a complex system of numerous inter-related
Dilanthi Amaratunga University of Salford actions, which needs a common understanding, a method of control and a monitoring
David Baldry University of Salford system to ensure the outputs are delivered in a cost effective and timely manner.
Stephen Brown North Tees & Hartlepool NHS Trust A key on-going requirement is to find, develop and test management tools to assist our
Roger Dyson WS Atkins professional staff in meeting these objectives. Working with the SPICE and SPICE FM
Paul Featherstone Manchester Community Healthcare Trust teams has generated a confidence that an NHS Trust, or any business, can make overall
John Flannery Bolton Hospital NHS Trust improvements using the step-by-step principle to organisational maturity.
Richard Haigh University of Salford
Keith Hamblett BT Property Problems in the past were often addressed in isolation by adopting a procedure that
Martin Jarrett CITEX finished when a conclusion was reached. In contrast, SPICE adopts process thinking,
Peter Jessamine Continuum Consultancy which is continuous, developing constant improvement and links with other accepted
Weng Lee EC Harris systems such as critical success factors, the balanced scorecard and the EFQM model.
Margaret Nelson University of Salford In my opinion SPICE and SPICE FM are powerful tools if used energetically and by a
Nigel Palmer Bolton Hospital NHS Estates committed organisation.
Eric Stokes University of Salford
Adrian Yates Central Manchester Healthcare NHS Trust The feedback we have received from the test bed trusts has been very positive and I would
commend the system to all estates and facilities managers for consideration in continuously
assessing and improving their service provision.
Bridgewater Building
University of Salford
Salford M7 9NU
United Kingdom
Tel: +44 (0)161 295 5317
Fax: +44 (0)161 295 5011
E-Mail: spicefm@sun.scpm.salford.ac.uk
Web: http://www.scpm.salford.ac.uk/spicefm
Peter Wearmouth
Acting Chief Executive
* SPICE FM was a research project funded by the EPSRC (Engineering and Physical NHS Estates
Sciences Research Council) and the DETR (Department of Environment Transport and
the Regions) in the UK.
SPICE FM Framework SPICE FM Framework

SPICE FM* Foreword

Panel of Experts On behalf of the Secretary of State for Health my business is developing policy and
improving performance of buildings and services within the NHS, the largest estate
Peter Wearmouth (Chair) NHS Estates portfolio under Government responsibility in Europe.
Marjan Sarshar (Project Manager) University of Salford
Ron Stone (Champion) NHS Estates This brings together professionals and specialists from many disciplines operating within a
Robert Jackson (DETR Project Manager) Davis Langdon change management system as the healthcare estate adjusts to the modernisation agenda.
Keith Alexander Centre for Facilities Management In simple terms, this entails management of a complex system of numerous inter-related
Dilanthi Amaratunga University of Salford actions, which needs a common understanding, a method of control and a monitoring
David Baldry University of Salford system to ensure the outputs are delivered in a cost effective and timely manner.
Stephen Brown North Tees & Hartlepool NHS Trust A key on-going requirement is to find, develop and test management tools to assist our
Roger Dyson WS Atkins professional staff in meeting these objectives. Working with the SPICE and SPICE FM
Paul Featherstone Manchester Community Healthcare Trust teams has generated a confidence that an NHS Trust, or any business, can make overall
John Flannery Bolton Hospital NHS Trust improvements using the step-by-step principle to organisational maturity.
Richard Haigh University of Salford
Keith Hamblett BT Property Problems in the past were often addressed in isolation by adopting a procedure that
Martin Jarrett CITEX finished when a conclusion was reached. In contrast, SPICE adopts process thinking,
Peter Jessamine Continuum Consultancy which is continuous, developing constant improvement and links with other accepted
Weng Lee EC Harris systems such as critical success factors, the balanced scorecard and the EFQM model.
Margaret Nelson University of Salford In my opinion SPICE and SPICE FM are powerful tools if used energetically and by a
Nigel Palmer Bolton Hospital NHS Estates committed organisation.
Eric Stokes University of Salford
Adrian Yates Central Manchester Healthcare NHS Trust The feedback we have received from the test bed trusts has been very positive and I would
commend the system to all estates and facilities managers for consideration in continuously
assessing and improving their service provision.
Bridgewater Building
University of Salford
Salford M7 9NU
United Kingdom
Tel: +44 (0)161 295 5317
Fax: +44 (0)161 295 5011
E-Mail: spicefm@sun.scpm.salford.ac.uk
Web: http://www.scpm.salford.ac.uk/spicefm
Peter Wearmouth
Acting Chief Executive
* SPICE FM was a research project funded by the EPSRC (Engineering and Physical NHS Estates
Sciences Research Council) and the DETR (Department of Environment Transport and
the Regions) in the UK.
SPICE FM Framework SPICE FM Framework

Table of Contents The Aims of this Booklet

The aims of this booklet 1 The SPICE FM research project was aimed at developing a step-by-
step organisational development framework for Facilities Management
(FM) organisations.
Executive summary 2 This booklet provides an overview of the framework devised by the
SPICE FM project. This framework integrates a strategic management
tool with a model organisations can use to evaluate and improve their
Introduction 3 processes. Together, these elements can assist FM organisations to
focus on strategy and continuously improve on service delivery.

Use of the Balanced Score Card in FM 4


Who should read this?
This booklet has been written specifically for directors and managers
Process Thinking in FM 8 with responsibility for facilities management in the public and
private sectors.

Creating a Continuous What can SPICE achieve?


Improvement Infrastructure 20 The SPICE FM framework can help FM organisations to: -
■ increase their awareness of the need for strategy
Real Life Examples 23 ■ focus on improving core FM processes
■ improve their ability to implement a strategic vision
Relationship with EFQM Model 38

Summary 40

Appendix A – Extract from the


SPICE FM Process Maturity Questionnaire 41

Glossary 43

References and Bibliography 44

1
SPICE FM Framework SPICE FM Framework

Table of Contents The Aims of this Booklet

The aims of this booklet 1 The SPICE FM research project was aimed at developing a step-by-
step organisational development framework for Facilities Management
(FM) organisations.
Executive summary 2 This booklet provides an overview of the framework devised by the
SPICE FM project. This framework integrates a strategic management
tool with a model organisations can use to evaluate and improve their
Introduction 3 processes. Together, these elements can assist FM organisations to
focus on strategy and continuously improve on service delivery.

Use of the Balanced Score Card in FM 4


Who should read this?
This booklet has been written specifically for directors and managers
Process Thinking in FM 8 with responsibility for facilities management in the public and
private sectors.

Creating a Continuous What can SPICE achieve?


Improvement Infrastructure 20 The SPICE FM framework can help FM organisations to: -
■ increase their awareness of the need for strategy
Real Life Examples 23 ■ focus on improving core FM processes
■ improve their ability to implement a strategic vision
Relationship with EFQM Model 38

Summary 40

Appendix A – Extract from the


SPICE FM Process Maturity Questionnaire 41

Glossary 43

References and Bibliography 44

1
SPICE FM Framework SPICE FM Framework

Executive Summary Introduction

SPICE FM is a step-by-step organisational staff issues. All of these are vital to growth Despite large investments and considerable The SPICE FM framework combines the
development framework for Facilities and long-term competitiveness. achievements, the field of Facilities Management Balanced Scorecard with the SPICE maturity
Management (FM) providers, including in- (FM) remains under-researched. The drive framework to meet these three objectives.
■ SPICE FM is a step-by-step process
house departments and external contractors. towards best practice is supported by an
evaluation tool that helps FM providers The SPICE maturity framework draws a
It allows FM organisations to continuously inadequate knowledge base, with few well-
evaluate and continuously improve their distinction between organisations that have
review and improve their business performance. established methods and techniques
service delivery at an operational level. ‘mature’ or well-established processes, and those
(Nutt, 1999). FM professionals recognise the
Around 90% of organisations that develop a where the processes are ‘immature’.
■ The strategic management and process need for strategic focus, and that improvements
strategy fail to implement it effectively. For most Characteristics of immature organisations
evaluation tools can be used together, so that in operational processes can improve business
organisations, translating strategic directions include difficulties in meeting expectations on
improving service delivery is aligned with the performance. However, FM organisations lack
into on-the-ground operational terms and service delivery time, cost and quality.
strategic objectives of the core business. clear guidelines to direct their improvement
communicating them to employees has proved They also have difficulty in managing people
The FM provider is thus able to develop its efforts and to benchmark their performance
exceedingly challenging. Creating an on-going and introducing new technologies.
capabilities while assisting the core business against other organisations.
strategic focus is a continuous process that Organisations with greater maturity are
to implement its vision.
requires appropriate tools and techniques. SPICE FM is a learning framework for FM characterised by improved capability on delivering
This booklet describes these three approaches to organisations. Kaplan and Norton (1996) list service to cost, timescale, and quality.
The SPICE FM research project was designed to
improving FM performance. It includes real-life three essential ingredients for an effective Mature organisations align technology and
address this challenge. The research resulted in
case studies that illustrate how the framework learning process within organisations: people management with efforts to
the approach shown in figure 1. It has two core
has been used by several hospitals and a large improve processes.
components that can be used individually or 1 - A shared strategic framework that communicates
retail chain.
together to enhance FM performance: - strategy and allows participants to see how SPICE FM aligns this process maturity
However, this booklet does not contain sufficient their activities contribute to the achievement framework with the strategic management
■ The Balanced Scorecard is a strategic
information to actually implement SPICE FM of the strategy. system of the Balanced Scorecard. It creates an
management tool that can help FM
within your organisation. If you would like to environment where improvement priorities for
providers understand their role in meeting 2 - A feedback process that collects performance
implement the framework, please contact the FM providers are directly linked to strategic
the needs of the core business. data about the strategy and allows any
project team at the University of Salford business directions.
The Scorecard combines financial measures assumptions or hypotheses to be tested.
(www.scpm.salford.ac.uk/spicefm), which can
with operational issues and customer and
put you in contact with relevant organisations. 3 - A team problem solving process that can
adapt the strategy to emerging conditions
Figure 1: The SPICE FM approach
and issues.
Top Down
The ‘Balanced Scorecard’
Senior Management
identifies an organisation’s
business objectives based on Middle Out
four perspectives; Customer; The Process Maturity Model
Internal Process; Financial; improves the capability of the
and Learning and Growth Middle Management management processes that
support the implementation of an
organisation’s business strategy.

Line Employees

2 3
SPICE FM Framework SPICE FM Framework

Executive Summary Introduction

SPICE FM is a step-by-step organisational staff issues. All of these are vital to growth Despite large investments and considerable The SPICE FM framework combines the
development framework for Facilities and long-term competitiveness. achievements, the field of Facilities Management Balanced Scorecard with the SPICE maturity
Management (FM) providers, including in- (FM) remains under-researched. The drive framework to meet these three objectives.
■ SPICE FM is a step-by-step process
house departments and external contractors. towards best practice is supported by an
evaluation tool that helps FM providers The SPICE maturity framework draws a
It allows FM organisations to continuously inadequate knowledge base, with few well-
evaluate and continuously improve their distinction between organisations that have
review and improve their business performance. established methods and techniques
service delivery at an operational level. ‘mature’ or well-established processes, and those
(Nutt, 1999). FM professionals recognise the
Around 90% of organisations that develop a where the processes are ‘immature’.
■ The strategic management and process need for strategic focus, and that improvements
strategy fail to implement it effectively. For most Characteristics of immature organisations
evaluation tools can be used together, so that in operational processes can improve business
organisations, translating strategic directions include difficulties in meeting expectations on
improving service delivery is aligned with the performance. However, FM organisations lack
into on-the-ground operational terms and service delivery time, cost and quality.
strategic objectives of the core business. clear guidelines to direct their improvement
communicating them to employees has proved They also have difficulty in managing people
The FM provider is thus able to develop its efforts and to benchmark their performance
exceedingly challenging. Creating an on-going and introducing new technologies.
capabilities while assisting the core business against other organisations.
strategic focus is a continuous process that Organisations with greater maturity are
to implement its vision.
requires appropriate tools and techniques. SPICE FM is a learning framework for FM characterised by improved capability on delivering
This booklet describes these three approaches to organisations. Kaplan and Norton (1996) list service to cost, timescale, and quality.
The SPICE FM research project was designed to
improving FM performance. It includes real-life three essential ingredients for an effective Mature organisations align technology and
address this challenge. The research resulted in
case studies that illustrate how the framework learning process within organisations: people management with efforts to
the approach shown in figure 1. It has two core
has been used by several hospitals and a large improve processes.
components that can be used individually or 1 - A shared strategic framework that communicates
retail chain.
together to enhance FM performance: - strategy and allows participants to see how SPICE FM aligns this process maturity
However, this booklet does not contain sufficient their activities contribute to the achievement framework with the strategic management
■ The Balanced Scorecard is a strategic
information to actually implement SPICE FM of the strategy. system of the Balanced Scorecard. It creates an
management tool that can help FM
within your organisation. If you would like to environment where improvement priorities for
providers understand their role in meeting 2 - A feedback process that collects performance
implement the framework, please contact the FM providers are directly linked to strategic
the needs of the core business. data about the strategy and allows any
project team at the University of Salford business directions.
The Scorecard combines financial measures assumptions or hypotheses to be tested.
(www.scpm.salford.ac.uk/spicefm), which can
with operational issues and customer and
put you in contact with relevant organisations. 3 - A team problem solving process that can
adapt the strategy to emerging conditions
Figure 1: The SPICE FM approach
and issues.
Top Down
The ‘Balanced Scorecard’
Senior Management
identifies an organisation’s
business objectives based on Middle Out
four perspectives; Customer; The Process Maturity Model
Internal Process; Financial; improves the capability of the
and Learning and Growth Middle Management management processes that
support the implementation of an
organisation’s business strategy.

Line Employees

2 3
SPICE FM Framework SPICE FM Framework

Use of Balanced Scorecard in FM

The FM Sector Strategic Importance of Facilities Attempting to introduce a performance ■ Financial: how will we look to the shareholders?
Management management system that links FM measures to ■ Innovation: how can the organisation learn
Facilities Management (FM) is a large emerging
strategy has been a major task for FM organisations. and improve?
business sector. The FM budget of a typical The need to draw attention to FM as a factor in
In this context, SPICE FM uses the Balanced
organisation often accounts for 30-40% of its overall business strategy has been a major issue This rounded assessment provides management
Scorecard (Kaplan and Norton, 1996) approach
running costs, coming second only to payroll. in recent years. In particular, there has been a with a “balanced” view of the business.
to link measures to strategy, thus emphasising
The latest surveys estimate the provision of FM need to raise awareness at senior management Through the Scorecard, the organisation
the strategic importance of FM and exploring
services to be worth £5.9 billion, up by 90% level (Then, 1999). monitors both its current performance (in terms
its contribution to the core business.
since 1995 (Facilities Management Solutions, of finances, customer satisfaction, and business
The FM role within organisations should be
2001). Alexander (1996) states that “Facilities are
built on an aspiration to continuously add value. The Balanced Scorecard process results) and its efforts to improve
an organisation’s second largest expense and can processes, motivate and educate employees,
This is achieved by providing appropriate and It is often argued that performance measures
account for as much as 15% of turnover” and “they and enhance information systems. The Scorecard
innovative ‘facilities solutions’ to business should be derived from strategy: that is, they
are also the largest item on the balance sheet, typically still includes hard financial indicators, but it
challenges through the skilful manipulation of should reinforce the importance of certain
over 25% of all fixed assets”. balances these with other, so-called “soft” measures,
all business resources. In other words, the FM strategic objectives (Skinner, 1989). A strategic
According to the latest report from Market and role should achieve the optimum balance management system should address this and such as customer satisfaction and organisational
Business Development, sales turnover in the FM between people, physical assets and technology. create an organisation that: learning. In viewing an organisation from four
sector totals £75.5billion, representing a 5% ■ Is healthy, balanced, efficient and effective; different perspectives (Figure 2), the Balanced
It is therefore increasingly necessary to
increase. The report also argues that the market Scorecard links the short-term operational
demonstrate the performance links between the ■ Provides service to its customers as well as its
has the potential to expand three fold. control of the business to the long-term vision
FM role and the core business. employees; and
However, according to FBA (Professionals in and strategy (Kaplan and Norton, 1996).
Relationship between Facilities ■ Puts value on results
Facilities Management), poor understanding of
FM at the highest level is costing British Management, Facilities Management The Balanced Scorecard presents such a model Figure 2: The Balanced Scorecard
business £7 billion a year (1999). A survey of FM strategy and the core business for strategic performance measurement.
operations among top companies in the banking A lack of strategic integration between FM and
The Scorecard measures performance and Financial
and financial services, legal, technology and the core organisation could result in
develops strategies by analysing results across a
communications sectors has identified that over contradictory objectives and goals.
range of activities. It also attempts to overcome
90% operate considerably below best practice The message is that management must acknowledge the deficiencies of existing measurement systems.
(BIFM, 1999). that facilities are a business resource. FM has to Customer
Balanced Learning
It translates the organisation’s vision into a set of Scorecard & Growth
FM is generally viewed as a support function for establish its strategic role by demonstrating its
performance indicators covering the following
an organisation’s core business. Many managers relevance to the overall business process.
four perspectives:
and directors therefore believe that its role However, practitioners and academics are still Internal
should be mainly operational. ■ Customer: how must we look to our customers?
struggling to establish meaningful FM measures, Process
how to measure them and how to draw ■ Internal processes: what internal processes
However, due to the financial significance of
relationships with the core business. must we excel at?
FM, and its direct impact on customer and
employee satisfaction, these views are changing. Some organisations have begun to touch on Skandia
Many now believe that FM should play a major non-financial or ‘soft’ issues as well as traditional “We have achieved a great deal through the use of Balanced Scorecard. Marrying our IT system to the
role in achieving and implementing an accounting variables, suggesting that these Scorecard produced the perfect tool for strategic business management on all levels of the organisation.
organisation’s overall business strategy. measures have assumed a place on their It guides Skandia on the corporate level, subsidiary level, and the individual contributor level. By enabling
agendas. However, this does not seem to have everyone in the organisation to see the overall picture and realise they can have an influence, the Scorecard
permeated most FM organisations. is helping to make Skandia a great company”.

4 5
SPICE FM Framework SPICE FM Framework

Use of Balanced Scorecard in FM

The FM Sector Strategic Importance of Facilities Attempting to introduce a performance ■ Financial: how will we look to the shareholders?
Management management system that links FM measures to ■ Innovation: how can the organisation learn
Facilities Management (FM) is a large emerging
strategy has been a major task for FM organisations. and improve?
business sector. The FM budget of a typical The need to draw attention to FM as a factor in
In this context, SPICE FM uses the Balanced
organisation often accounts for 30-40% of its overall business strategy has been a major issue This rounded assessment provides management
Scorecard (Kaplan and Norton, 1996) approach
running costs, coming second only to payroll. in recent years. In particular, there has been a with a “balanced” view of the business.
to link measures to strategy, thus emphasising
The latest surveys estimate the provision of FM need to raise awareness at senior management Through the Scorecard, the organisation
the strategic importance of FM and exploring
services to be worth £5.9 billion, up by 90% level (Then, 1999). monitors both its current performance (in terms
its contribution to the core business.
since 1995 (Facilities Management Solutions, of finances, customer satisfaction, and business
The FM role within organisations should be
2001). Alexander (1996) states that “Facilities are
built on an aspiration to continuously add value. The Balanced Scorecard process results) and its efforts to improve
an organisation’s second largest expense and can processes, motivate and educate employees,
This is achieved by providing appropriate and It is often argued that performance measures
account for as much as 15% of turnover” and “they and enhance information systems. The Scorecard
innovative ‘facilities solutions’ to business should be derived from strategy: that is, they
are also the largest item on the balance sheet, typically still includes hard financial indicators, but it
challenges through the skilful manipulation of should reinforce the importance of certain
over 25% of all fixed assets”. balances these with other, so-called “soft” measures,
all business resources. In other words, the FM strategic objectives (Skinner, 1989). A strategic
According to the latest report from Market and role should achieve the optimum balance management system should address this and such as customer satisfaction and organisational
Business Development, sales turnover in the FM between people, physical assets and technology. create an organisation that: learning. In viewing an organisation from four
sector totals £75.5billion, representing a 5% ■ Is healthy, balanced, efficient and effective; different perspectives (Figure 2), the Balanced
It is therefore increasingly necessary to
increase. The report also argues that the market Scorecard links the short-term operational
demonstrate the performance links between the ■ Provides service to its customers as well as its
has the potential to expand three fold. control of the business to the long-term vision
FM role and the core business. employees; and
However, according to FBA (Professionals in and strategy (Kaplan and Norton, 1996).
Relationship between Facilities ■ Puts value on results
Facilities Management), poor understanding of
FM at the highest level is costing British Management, Facilities Management The Balanced Scorecard presents such a model Figure 2: The Balanced Scorecard
business £7 billion a year (1999). A survey of FM strategy and the core business for strategic performance measurement.
operations among top companies in the banking A lack of strategic integration between FM and
The Scorecard measures performance and Financial
and financial services, legal, technology and the core organisation could result in
develops strategies by analysing results across a
communications sectors has identified that over contradictory objectives and goals.
range of activities. It also attempts to overcome
90% operate considerably below best practice The message is that management must acknowledge the deficiencies of existing measurement systems.
(BIFM, 1999). that facilities are a business resource. FM has to Customer
Balanced Learning
It translates the organisation’s vision into a set of Scorecard & Growth
FM is generally viewed as a support function for establish its strategic role by demonstrating its
performance indicators covering the following
an organisation’s core business. Many managers relevance to the overall business process.
four perspectives:
and directors therefore believe that its role However, practitioners and academics are still Internal
should be mainly operational. ■ Customer: how must we look to our customers?
struggling to establish meaningful FM measures, Process
how to measure them and how to draw ■ Internal processes: what internal processes
However, due to the financial significance of
relationships with the core business. must we excel at?
FM, and its direct impact on customer and
employee satisfaction, these views are changing. Some organisations have begun to touch on Skandia
Many now believe that FM should play a major non-financial or ‘soft’ issues as well as traditional “We have achieved a great deal through the use of Balanced Scorecard. Marrying our IT system to the
role in achieving and implementing an accounting variables, suggesting that these Scorecard produced the perfect tool for strategic business management on all levels of the organisation.
organisation’s overall business strategy. measures have assumed a place on their It guides Skandia on the corporate level, subsidiary level, and the individual contributor level. By enabling
agendas. However, this does not seem to have everyone in the organisation to see the overall picture and realise they can have an influence, the Scorecard
permeated most FM organisations. is helping to make Skandia a great company”.

4 5
SPICE FM Framework SPICE FM Framework

Four strategic perspectives This perspective reveals a fundamental The hierarchical nature of the The challenge: Implementing
differences between the traditional approach to Balanced Scorecard the strategy
The Balanced Scorecard allows managers to
performance measurement, and the Balanced
look at the business from the four perspectives. The Balanced Scorecard helps organisations Several hundred global businesses have now
Scorecard. While traditional approaches attempt
A brief overview of the four perspectives is map the long-term requirements of the adopted the Scorecard approach, although
to monitor and improve existing business
given below: business’s overall strategy with that of committed advocates have differing interpretations
processes, the Scorecard identifies entirely new
departments (such as FM), teams and on how to deploy and use it. One objective that
processes at which the organisation must excel
Customer perspective individuals. Through this process, departmental is shared by all organisations is having the
to meet customer and financial objectives.
This captures the ability of the organisation to performance remains focused on the ability to implement business strategy quickly.
provide quality goods and services, and to Financial perspective organisation’s overall objectives. Also, the goals However, up to 70% of organisations fail to fully
deliver overall customer satisfaction. It places Financial performance measures define the of teams and individuals can be linked to overall implement their Balanced Scorecard.
importance on the organisation’s ability to long-term objectives of the business unit. objectives; thereby building capabilities that will
For most FM organisations, developing a
achieve its vision, and how it wants to be seen by While most businesses emphasise profitability, enable longer-term strategic goals to be
strategy is only the first step. The key issue is
its customers. This perspective guides the other financial objectives are also possible. achieved. Figure 3 illustrates these relationships.
achieving a strategically focused organisation,
internal processes and development efforts of Financial performance measures indicate As shown above, in the ideal world, every which is continually evolving and responding to
the company. It is at the heart of the scorecard: whether the organisation’s strategy and person in the organisation, from the boardroom new customer and market demands.
if the company fails to deliver the right products implementation are contributing to bottom-line to the back room, would understand the overall
and services to satisfy customer needs in the improvement. A well-designed financial control The introduction to this booklet suggested three
strategy and how individual goals support the
short and long term, then the business will not system can actually enhance an organisation’s characteristics for a learning organisation,
‘big picture’. The Balanced Scorecard permits
generate revenue and will eventually wither management system. namely: Strategic focus; a feedback loop; and a
such a top-to-bottom alignment.
and die. team problem solving culture. While the Balanced
Learning and growth perspective Figure 3: Top-to-bottom Scorecard provides the strategic focus, further tools
Internal processes perspective The predominant element in this perspective is and techniques are required to create the feedback
alignment of strategy
This is about identifying and measuring the whether organisations can continue to improve loop and the team problem solving cultures.
processes that organisations must excel at to and create future value for their stakeholders. FM organisations need the necessary infrastructure
achieve their financial and customer strategic This, in turn, identifies the infrastructure the to communicate strategic direction to operational
goals. To meet their own objectives and organisation must build to create long-term Core Business managers and employees. They must receive
customers’ expectations, organisations must first growth and improvement. This perspective feedback on the impact of strategy on day-to-day
identify these key business processes, then examines the ability of employees, the quality of operational issues, and launch appropriate
monitor them to ensure satisfactory outcomes. information systems, and the effects of improvement initiatives. Strategy must translate
These key internal processes enable the business organisational alignment in meeting an into the day-to-day actions of employees.
unit to deliver customers’ value propositions organisation’s goals. Once organisations have
and satisfy shareholder expectations of established their strategic objectives, they need The SPICE FM assessment process helps provide
SBU A SBU B SBU C a feedback loop as well as a team problem solving
financial returns. to identify the performance measures needed
to promote continuous organisational, divisional culture. It therefore creates the infrastructure to
Suppost Functions link day-to-day operational activities to FM strategy.
and group learning and growth.
Applying the SPICE FM concept is no
guarantee of formulating a successful strategy,
Siemens nor of assessing FM process capability or
“We’ve always had strategies, but through Balanced Scorecard we bring them to life. Every business unit aligning strategy within FM organisations.
scorecard and uses it to focus attention on designated critical success factors. Moreover, each employee But the great strength of the concept lies in the
knows his or her contribution to the strategy, enforcing alignment and accountability throughout the Teams and very process of deploying it, which is an
organisation. It’s the way we manage our business.”
Individuals effective way of expressing the organisation’s
strategy and vision in tangible terms and to
gather support for it throughout the organisation.

6 7
SPICE FM Framework SPICE FM Framework

Four strategic perspectives This perspective reveals a fundamental The hierarchical nature of the The challenge: Implementing
differences between the traditional approach to Balanced Scorecard the strategy
The Balanced Scorecard allows managers to
performance measurement, and the Balanced
look at the business from the four perspectives. The Balanced Scorecard helps organisations Several hundred global businesses have now
Scorecard. While traditional approaches attempt
A brief overview of the four perspectives is map the long-term requirements of the adopted the Scorecard approach, although
to monitor and improve existing business
given below: business’s overall strategy with that of committed advocates have differing interpretations
processes, the Scorecard identifies entirely new
departments (such as FM), teams and on how to deploy and use it. One objective that
processes at which the organisation must excel
Customer perspective individuals. Through this process, departmental is shared by all organisations is having the
to meet customer and financial objectives.
This captures the ability of the organisation to performance remains focused on the ability to implement business strategy quickly.
provide quality goods and services, and to Financial perspective organisation’s overall objectives. Also, the goals However, up to 70% of organisations fail to fully
deliver overall customer satisfaction. It places Financial performance measures define the of teams and individuals can be linked to overall implement their Balanced Scorecard.
importance on the organisation’s ability to long-term objectives of the business unit. objectives; thereby building capabilities that will
For most FM organisations, developing a
achieve its vision, and how it wants to be seen by While most businesses emphasise profitability, enable longer-term strategic goals to be
strategy is only the first step. The key issue is
its customers. This perspective guides the other financial objectives are also possible. achieved. Figure 3 illustrates these relationships.
achieving a strategically focused organisation,
internal processes and development efforts of Financial performance measures indicate As shown above, in the ideal world, every which is continually evolving and responding to
the company. It is at the heart of the scorecard: whether the organisation’s strategy and person in the organisation, from the boardroom new customer and market demands.
if the company fails to deliver the right products implementation are contributing to bottom-line to the back room, would understand the overall
and services to satisfy customer needs in the improvement. A well-designed financial control The introduction to this booklet suggested three
strategy and how individual goals support the
short and long term, then the business will not system can actually enhance an organisation’s characteristics for a learning organisation,
‘big picture’. The Balanced Scorecard permits
generate revenue and will eventually wither management system. namely: Strategic focus; a feedback loop; and a
such a top-to-bottom alignment.
and die. team problem solving culture. While the Balanced
Learning and growth perspective Figure 3: Top-to-bottom Scorecard provides the strategic focus, further tools
Internal processes perspective The predominant element in this perspective is and techniques are required to create the feedback
alignment of strategy
This is about identifying and measuring the whether organisations can continue to improve loop and the team problem solving cultures.
processes that organisations must excel at to and create future value for their stakeholders. FM organisations need the necessary infrastructure
achieve their financial and customer strategic This, in turn, identifies the infrastructure the to communicate strategic direction to operational
goals. To meet their own objectives and organisation must build to create long-term Core Business managers and employees. They must receive
customers’ expectations, organisations must first growth and improvement. This perspective feedback on the impact of strategy on day-to-day
identify these key business processes, then examines the ability of employees, the quality of operational issues, and launch appropriate
monitor them to ensure satisfactory outcomes. information systems, and the effects of improvement initiatives. Strategy must translate
These key internal processes enable the business organisational alignment in meeting an into the day-to-day actions of employees.
unit to deliver customers’ value propositions organisation’s goals. Once organisations have
and satisfy shareholder expectations of established their strategic objectives, they need The SPICE FM assessment process helps provide
SBU A SBU B SBU C a feedback loop as well as a team problem solving
financial returns. to identify the performance measures needed
to promote continuous organisational, divisional culture. It therefore creates the infrastructure to
Suppost Functions link day-to-day operational activities to FM strategy.
and group learning and growth.
Applying the SPICE FM concept is no
guarantee of formulating a successful strategy,
Siemens nor of assessing FM process capability or
“We’ve always had strategies, but through Balanced Scorecard we bring them to life. Every business unit aligning strategy within FM organisations.
scorecard and uses it to focus attention on designated critical success factors. Moreover, each employee But the great strength of the concept lies in the
knows his or her contribution to the strategy, enforcing alignment and accountability throughout the Teams and very process of deploying it, which is an
organisation. It’s the way we manage our business.”
Individuals effective way of expressing the organisation’s
strategy and vision in tangible terms and to
gather support for it throughout the organisation.

6 7
SPICE FM Framework SPICE FM Framework

Process Thinking in FM

Introduction Characteristics of a process Process Thinking Process institutionalisation


Despite considerable achievements in recent A process has several essential features, Due to changes in the market place and A process determines the way we act and react.
years, FM remains a fairly new business sector. which Ould (1995) lists as follows: customers’ increasing expectations, The activities and tasks we perform to achieve a
Traditionally, FM has lacked specific ■ A process involves activity. People or task orientated or functional thinking has certain goal form the ‘process’ for achieving that
management tools that meet its needs, and has equipment do things. become outdated. Many management thinkers goal. A disciplined process will result in ordered
borrowed methods and tools from believe that organisational infrastructure and and consistent patterns of behaviour, whether by
■ A process also generally involves more than
manufacturing industries. capabilities are far more decisive in securing individuals or by groups of people. The process
one person or piece of equipment. A process
competitive advantage than isolated moments of defines how we act or react, or it defines the
This section introduces the SPICE FM process is therefore about groups, and concerns
strategic brilliance. After all, it is far easier for a activities needed to fulfil a certain task. We have
maturity model, a methodology for increasing collaborative activity.
competitor to copy a strategic decision than to a process for ‘going to work’, a process for
FM organisations’ ability to identify and ■ A process has a goal. It is intended to achieve duplicate mature and effective business ‘defining service standards’, and so on.
improve key business processes. The model is a something and to produce results. processes. The EFQM (European Foundation In organisations, processes involve groups and
step-by-step approach to continuous
These features have implications. (i) Since a for Quality Management) model, which many teams of people. To achieve a process discipline
improvement that aims to secure long-term
process must be shared among groups, it needs European businesses embrace, emphasises the shared by the whole organisation, the process
competitive advantage.
to be defined. (ii) The definition and knowledge importance of process thinking in driving needs to be established or ‘institutionalised’.
■ A method for measuring the maturity of businesses forward.
of the process must be passed to those who Without organisation-wide established processes,
current business processes;
perform it. Hence there is a requirement for Many of the early advocates of process thinking, every individual would follow his or her own
■ A five level framework for achieving step-by- process learning. The knowledge of the process such as Michael Hammer and James Champy, way of performing a task. Attempts to adhere to
step improvements. should drive and align the behaviour and argued for radical changes to business processes a common process are likely to be ad-hoc or
Definition of a process activities of those who perform it. (iii) The process in the form of Business Process Re-engineering even chaotic, which could lead to conflict
leads to process results. This is shown in Figure 4. (BPR), in the early nineties. BPR is a large scale, and stress.
There are many definitions of a process.
Table 1 gives two examples. The two definitions Figure 4: Aspects of a process high-risk approach. Despite some early On the other hand, in organisations where
emphasise different aspects of a process. successes, the majority of the organisations common processes are institutionalised, staff
PROCESS DEFINITION failed to implement BPR. Furthermore, BPR perform the process painlessly, smoothly and in
Table 1: Process Definition resulted in serious business failures for some harmony with each other. The process itself
organisations (Davenport, 1992). becomes invisible or ‘transparent’, because it is
Source Definition
Businesses have subsequently shifted towards an the natural way of performing business activities.
The Course of action, proceeding,
Concise esp. series of operations in evolutionary approach, in the form of business
Oxford manufacturing, printing, process improvement. Here, the key questions
Dictionary photography, etc. are how to:
ACTIVITIES,
SEI CMM® A process is a sequence of steps PEOPLE AND ■ Make the cultural change to one of
(Capability performed for a given purpose. TOOLS continuous improvement; and
Maturity More simply stated, process is ■ Initiate and implement continuous business
Model) what you do. The process process improvement.
integrates people, tools and
procedures together.

PROCESS RESULTS

8 9
SPICE FM Framework SPICE FM Framework

Process Thinking in FM

Introduction Characteristics of a process Process Thinking Process institutionalisation


Despite considerable achievements in recent A process has several essential features, Due to changes in the market place and A process determines the way we act and react.
years, FM remains a fairly new business sector. which Ould (1995) lists as follows: customers’ increasing expectations, The activities and tasks we perform to achieve a
Traditionally, FM has lacked specific ■ A process involves activity. People or task orientated or functional thinking has certain goal form the ‘process’ for achieving that
management tools that meet its needs, and has equipment do things. become outdated. Many management thinkers goal. A disciplined process will result in ordered
borrowed methods and tools from believe that organisational infrastructure and and consistent patterns of behaviour, whether by
■ A process also generally involves more than
manufacturing industries. capabilities are far more decisive in securing individuals or by groups of people. The process
one person or piece of equipment. A process
competitive advantage than isolated moments of defines how we act or react, or it defines the
This section introduces the SPICE FM process is therefore about groups, and concerns
strategic brilliance. After all, it is far easier for a activities needed to fulfil a certain task. We have
maturity model, a methodology for increasing collaborative activity.
competitor to copy a strategic decision than to a process for ‘going to work’, a process for
FM organisations’ ability to identify and ■ A process has a goal. It is intended to achieve duplicate mature and effective business ‘defining service standards’, and so on.
improve key business processes. The model is a something and to produce results. processes. The EFQM (European Foundation In organisations, processes involve groups and
step-by-step approach to continuous
These features have implications. (i) Since a for Quality Management) model, which many teams of people. To achieve a process discipline
improvement that aims to secure long-term
process must be shared among groups, it needs European businesses embrace, emphasises the shared by the whole organisation, the process
competitive advantage.
to be defined. (ii) The definition and knowledge importance of process thinking in driving needs to be established or ‘institutionalised’.
■ A method for measuring the maturity of businesses forward.
of the process must be passed to those who Without organisation-wide established processes,
current business processes;
perform it. Hence there is a requirement for Many of the early advocates of process thinking, every individual would follow his or her own
■ A five level framework for achieving step-by- process learning. The knowledge of the process such as Michael Hammer and James Champy, way of performing a task. Attempts to adhere to
step improvements. should drive and align the behaviour and argued for radical changes to business processes a common process are likely to be ad-hoc or
Definition of a process activities of those who perform it. (iii) The process in the form of Business Process Re-engineering even chaotic, which could lead to conflict
leads to process results. This is shown in Figure 4. (BPR), in the early nineties. BPR is a large scale, and stress.
There are many definitions of a process.
Table 1 gives two examples. The two definitions Figure 4: Aspects of a process high-risk approach. Despite some early On the other hand, in organisations where
emphasise different aspects of a process. successes, the majority of the organisations common processes are institutionalised, staff
PROCESS DEFINITION failed to implement BPR. Furthermore, BPR perform the process painlessly, smoothly and in
Table 1: Process Definition resulted in serious business failures for some harmony with each other. The process itself
organisations (Davenport, 1992). becomes invisible or ‘transparent’, because it is
Source Definition
Businesses have subsequently shifted towards an the natural way of performing business activities.
The Course of action, proceeding,
Concise esp. series of operations in evolutionary approach, in the form of business
Oxford manufacturing, printing, process improvement. Here, the key questions
Dictionary photography, etc. are how to:
ACTIVITIES,
SEI CMM® A process is a sequence of steps PEOPLE AND ■ Make the cultural change to one of
(Capability performed for a given purpose. TOOLS continuous improvement; and
Maturity More simply stated, process is ■ Initiate and implement continuous business
Model) what you do. The process process improvement.
integrates people, tools and
procedures together.

PROCESS RESULTS

8 9
SPICE FM Framework SPICE FM Framework

Core, support and management processes Core processes concentrate on satisfying FM process focus equally important. The objective is that process
Business processes can be divided into three customers. They directly add value to the thinking should be accepted and used
Most FM organisations focus on the services they
broad types: (i) core processes; (ii) support product in a way that clients understand. consistently. The process is seen as a disciplined
provide. In such a business culture, people are
processes; (iii) management processes. Figure 5 These processes respond to the needs of way of conducting business.
naturally inclined to emphasise issues that are
illustrates this. customers and generate customer satisfaction.
tangible, visible or measurable. Many organisations In contrast to functional definitions, a process
Support processes concentrate on satisfying are likely to resist process improvement perspective in FM focuses on the tasks and
‘customers’ within the organisation. activities that do not contribute to short-term activities that take place internally in the FM
Figure 5: Types of processes
They might add value to the business indirectly, tangible results. Consequently, FM managers organisation. The emphasis is on how the work
by supporting a core business process, often view process related work as low priority. is done, rather than the functional
Management
or directly, by providing a suitable environment. responsibilities.
Processes In contrast, process-focused organisations
Management processes are concerned with consider tangible results in service delivery to be Table 2 shows the characteristics of organisations
managing the core and support processes. just one aspect of the business picture. For such with process focus, as opposed to those without
organisations, how the service is delivered is such a focus.
SPICE FM is primarily concerned with
management processes. The underlying
philosophy is that if management processes are Table 2: Characteristics of a process focused organisation
Input core Output
well performed, they will have an impact on the
performance of core processes. SPICE FM does Without process focus With process focus
not prescribe how organisations should perform
core processes. Instead, it focuses on creating a Process discipline The staff and their management in Processes are defined and followed
management infrastructure that allows members the course of performing their by staff and management; process
of staff to perform core processes successfully. activities improvise processes. discipline is the norm.
Support
Processes Organisation Functions and roles do not Functions and roles are defined in
necessarily align with the support of the process.
process requirements
Management ■ Staff performance is measured in ■ Staff performance is measured in
terms of the number of hours terms of process performance
(irrespective of whether they and results
were productive or not) ■ Such measurements are defined
■ Managers are usually focused and agreed
on solving immediate crises ■ Managers focus on the quality of
(fire fighting) both process and service delivery
Skills & training Training is ad hoc and oriented Training is planned and is defined
towards personal inclinations in the support of end to end process
Tools & Tools and technology are acquired Tools and technology are selected in
technology as ad hoc point solutions without an support of the end to end process and
overall plan and strategy the automation of process activities

10 11
SPICE FM Framework SPICE FM Framework

Core, support and management processes Core processes concentrate on satisfying FM process focus equally important. The objective is that process
Business processes can be divided into three customers. They directly add value to the thinking should be accepted and used
Most FM organisations focus on the services they
broad types: (i) core processes; (ii) support product in a way that clients understand. consistently. The process is seen as a disciplined
provide. In such a business culture, people are
processes; (iii) management processes. Figure 5 These processes respond to the needs of way of conducting business.
naturally inclined to emphasise issues that are
illustrates this. customers and generate customer satisfaction.
tangible, visible or measurable. Many organisations In contrast to functional definitions, a process
Support processes concentrate on satisfying are likely to resist process improvement perspective in FM focuses on the tasks and
‘customers’ within the organisation. activities that do not contribute to short-term activities that take place internally in the FM
Figure 5: Types of processes
They might add value to the business indirectly, tangible results. Consequently, FM managers organisation. The emphasis is on how the work
by supporting a core business process, often view process related work as low priority. is done, rather than the functional
Management
or directly, by providing a suitable environment. responsibilities.
Processes In contrast, process-focused organisations
Management processes are concerned with consider tangible results in service delivery to be Table 2 shows the characteristics of organisations
managing the core and support processes. just one aspect of the business picture. For such with process focus, as opposed to those without
organisations, how the service is delivered is such a focus.
SPICE FM is primarily concerned with
management processes. The underlying
philosophy is that if management processes are Table 2: Characteristics of a process focused organisation
Input core Output
well performed, they will have an impact on the
performance of core processes. SPICE FM does Without process focus With process focus
not prescribe how organisations should perform
core processes. Instead, it focuses on creating a Process discipline The staff and their management in Processes are defined and followed
management infrastructure that allows members the course of performing their by staff and management; process
of staff to perform core processes successfully. activities improvise processes. discipline is the norm.
Support
Processes Organisation Functions and roles do not Functions and roles are defined in
necessarily align with the support of the process.
process requirements
Management ■ Staff performance is measured in ■ Staff performance is measured in
terms of the number of hours terms of process performance
(irrespective of whether they and results
were productive or not) ■ Such measurements are defined
■ Managers are usually focused and agreed
on solving immediate crises ■ Managers focus on the quality of
(fire fighting) both process and service delivery
Skills & training Training is ad hoc and oriented Training is planned and is defined
towards personal inclinations in the support of end to end process
Tools & Tools and technology are acquired Tools and technology are selected in
technology as ad hoc point solutions without an support of the end to end process and
overall plan and strategy the automation of process activities

10 11
SPICE FM Framework SPICE FM Framework

The SPICE FM Process Maturity Stepwise improvements in


Process myths and facts Why should they change? People can attend
Model organisational maturity
many training events but still act as if they had
Based on this understanding of processes, received no training. Without enforcement, The process maturity model lays foundations
The SPICE FM process maturity model
Zahran (1998) lists a number of interesting you can not guarantee that everyone in the for continuous process improvement,
promotes continuous process improvement
myths that prevail in many organisations. team will follow the process. by establishing controls on service delivery
based on many small, evolutionary steps.
Some of these myths are suited to facilities management processes before focusing on
It provides a system for initiating and
management organisations and are The sponsorship myth technical issues. Starting with ad-hoc processes,
implementing continuous improvement.
listed below: “We have a senior management the evolutionary 5-stage model guides FM
sponsor who believes in the value of The model divides these evolutionary steps into organisations towards developing their process
The documentation myth five maturity levels, which lay the foundations
the process improvement effort. capability (Sarshar et al, 2000).
“We have a set of standard We do not have to justify our for continuous process improvement.
documents that specify the steps of The maturity levels form a scale for In the SPICE FM framework, organisations at
investment and effort in process improvement.”
managing facilities. We think we measuring the capability of an FM provider's level 1 have little process focus. Organisations at
have a process.” Wrong! Unless the business benefits of the management processes. level 2 have achieved high capability in
process improvement are continuously managing service delivery. Level 3 focuses on
Wrong! A standard document on its own, monitored, measured and made visible, Each level of maturity is defined by a set of key knowledge management and sharing best
without being trained and enforced, is no management sponsorship could be lost. processes. When an organisation is successfully practice across the organisation. In levels 4 and
more than “shelfware”. It could do harm The process improvement effort could be applying each key process, it can stabilise an 5, the model introduces statistical controls and
rather than good. It gives the false impression stopped at the first business crisis. Business important part of the service delivery process measurement.
to management that there is a process in benefits attributed to process discipline should and achieve the next level of maturity. The five
place. A document is a dead object. It only levels also provide guidelines on how to Level 1 of SPICE FM is the entry to the
be uncovered and publicised.
comes to life when it turns into knowledge in prioritise efforts at process improvement. framework and has no key processes.
people’s brains and memories. It only becomes The stability myth Organisations at level 1 focus on achieving the
Figure 6 illustrates the five stages of the SPICE seven key processes at level 2. This lays the
effective when such knowledge drives “We have the process defined, FM framework. For each level, the model foundation for the key processes at the
people’s behaviour. documented, trained and enforced. specifies a number of ‘key processes’. next level.
The process is stable, and it should
The trust myth By following the steps in the model,
remain effective without any change.” an organisation can achieve effective and Each key process is defined by a set of critical
“We already train our staff in the
Wrong! The process will only be effective if it continuous improvement based on practices that indicate if the process has been
process. We automatically assume
is aligned with the business goals. If the evolutionary steps. implemented in a way that is effective,
that they practise what they have
business goals change, the process goals must repeatable and lasting. Table 3 lists the key
learned. We think we do not have to An organisation can only be at one level of the
be realigned. A stable process does not processes at level 2 and their “enablers”.
monitor their activities or put enforcement model at any one time. If an organisation is at
necessarily mean that the process is effective. To determine whether they satisfy these critical
procedures in place. We trust our staff.” level 1, but implements some of the key
The process should reflect the latest changes practices, organisations can use a process
Wrong! This is “wishful thinking”. processes of level 3 or 4, it is still considered a maturity questionnaire. Appendix A
in business, techniques and methods. It should level 1 organisation. This is because each level
An effective process environment is designed be continuously realigned to reflect any contains an extract from the SPICE FM process
to work effectively and endure throughout lays successive foundations for the next. maturity questionnaire.
changes in the business goals. An organisation has little to gain by addressing
generations of staff. Without follow up,
issues at a higher level if all the key processes at The SPICE FM approach is not prescriptive in
people tend to revert to their old habitual
the current level have not been implemented. terms of how activities are performed.
ways of performing activities.
Instead, the model focuses on the broader issue
To date, the research has focused on of process management. Effective process
defining the characteristics of Levels management encourages and supports
1 and 2 of the model. innovative approaches to solving day-to-day
business problems, rather than constraining
organisations to a particular way of working.

12 13
SPICE FM Framework SPICE FM Framework

The SPICE FM Process Maturity Stepwise improvements in


Process myths and facts Why should they change? People can attend
Model organisational maturity
many training events but still act as if they had
Based on this understanding of processes, received no training. Without enforcement, The process maturity model lays foundations
The SPICE FM process maturity model
Zahran (1998) lists a number of interesting you can not guarantee that everyone in the for continuous process improvement,
promotes continuous process improvement
myths that prevail in many organisations. team will follow the process. by establishing controls on service delivery
based on many small, evolutionary steps.
Some of these myths are suited to facilities management processes before focusing on
It provides a system for initiating and
management organisations and are The sponsorship myth technical issues. Starting with ad-hoc processes,
implementing continuous improvement.
listed below: “We have a senior management the evolutionary 5-stage model guides FM
sponsor who believes in the value of The model divides these evolutionary steps into organisations towards developing their process
The documentation myth five maturity levels, which lay the foundations
the process improvement effort. capability (Sarshar et al, 2000).
“We have a set of standard We do not have to justify our for continuous process improvement.
documents that specify the steps of The maturity levels form a scale for In the SPICE FM framework, organisations at
investment and effort in process improvement.”
managing facilities. We think we measuring the capability of an FM provider's level 1 have little process focus. Organisations at
have a process.” Wrong! Unless the business benefits of the management processes. level 2 have achieved high capability in
process improvement are continuously managing service delivery. Level 3 focuses on
Wrong! A standard document on its own, monitored, measured and made visible, Each level of maturity is defined by a set of key knowledge management and sharing best
without being trained and enforced, is no management sponsorship could be lost. processes. When an organisation is successfully practice across the organisation. In levels 4 and
more than “shelfware”. It could do harm The process improvement effort could be applying each key process, it can stabilise an 5, the model introduces statistical controls and
rather than good. It gives the false impression stopped at the first business crisis. Business important part of the service delivery process measurement.
to management that there is a process in benefits attributed to process discipline should and achieve the next level of maturity. The five
place. A document is a dead object. It only levels also provide guidelines on how to Level 1 of SPICE FM is the entry to the
be uncovered and publicised.
comes to life when it turns into knowledge in prioritise efforts at process improvement. framework and has no key processes.
people’s brains and memories. It only becomes The stability myth Organisations at level 1 focus on achieving the
Figure 6 illustrates the five stages of the SPICE seven key processes at level 2. This lays the
effective when such knowledge drives “We have the process defined, FM framework. For each level, the model foundation for the key processes at the
people’s behaviour. documented, trained and enforced. specifies a number of ‘key processes’. next level.
The process is stable, and it should
The trust myth By following the steps in the model,
remain effective without any change.” an organisation can achieve effective and Each key process is defined by a set of critical
“We already train our staff in the
Wrong! The process will only be effective if it continuous improvement based on practices that indicate if the process has been
process. We automatically assume
is aligned with the business goals. If the evolutionary steps. implemented in a way that is effective,
that they practise what they have
business goals change, the process goals must repeatable and lasting. Table 3 lists the key
learned. We think we do not have to An organisation can only be at one level of the
be realigned. A stable process does not processes at level 2 and their “enablers”.
monitor their activities or put enforcement model at any one time. If an organisation is at
necessarily mean that the process is effective. To determine whether they satisfy these critical
procedures in place. We trust our staff.” level 1, but implements some of the key
The process should reflect the latest changes practices, organisations can use a process
Wrong! This is “wishful thinking”. processes of level 3 or 4, it is still considered a maturity questionnaire. Appendix A
in business, techniques and methods. It should level 1 organisation. This is because each level
An effective process environment is designed be continuously realigned to reflect any contains an extract from the SPICE FM process
to work effectively and endure throughout lays successive foundations for the next. maturity questionnaire.
changes in the business goals. An organisation has little to gain by addressing
generations of staff. Without follow up,
issues at a higher level if all the key processes at The SPICE FM approach is not prescriptive in
people tend to revert to their old habitual
the current level have not been implemented. terms of how activities are performed.
ways of performing activities.
Instead, the model focuses on the broader issue
To date, the research has focused on of process management. Effective process
defining the characteristics of Levels management encourages and supports
1 and 2 of the model. innovative approaches to solving day-to-day
business problems, rather than constraining
organisations to a particular way of working.

12 13
SPICE FM Framework SPICE FM Framework

Figure 6: The SPICE FM process maturity model Level 1 – Initial Level 2 – Service Delivery
Level 1 is the basic entry level to the model, Management
Level 5 and has no key processes. An FM provider at At this level, service performance can be
this level has little focus on process, and service predicted to a certain degree. A level 2
Continuously
performance is poor. Good practices are local, organisation has established policies and
Improving and are not repeated or ‘institutionalised’ across procedures for managing and delivering
the organisation. The ineffective capture and customer requirements. Service performance
co-ordination of service requirements tends to standards are established, and service delivery is
Level 4 undermine good practices. Organisations make co-ordinated to minimise disruption to the core
commitments that staff or the supply chain business. As the service is being delivered,
Quantitatively cannot meet, which results in crises. continuous monitoring ensures that
Controlled performance standards are met.
During a crisis, facilities managers typically
abandon planned procedures; instead,
individuals do whatever activities it takes to get Figure 8: At level 2, processes are
Level 3 the job done, with little regard for the effects on
planned and evaluated
Knowledge other people. Figure 7 represents this focus on
results. Time, cost, quality and customer
Management satisfaction may all suffer. For an organisation at
level 1, effective service delivery depends Preparation
entirely on having an exceptional manager and
Level 2 a competent team. When these managers leave,
Service Delivery their stabilising influences leave with them. to produce

Management
Consequently, the organisation is unable to Activity Results
consistently meet the requirements of the
core business. input to

Level 1 organisations must implement all of the to improve

Level 1 level 2 key processes in order to progress, or Evaluation


‘mature’, to the second level of the model.
Initial
Figure 7: At level 1, individual focus
Table 3: Level 2 key processes and their enablers on individual performance

Level Key Process Areas Generic Process Enablers

2 - Service Delivery Service Requirement Management Commitment Activity Results


Management
Service Planning Ability
Service Performance Monitoring Activities
Supplier and Contractor Evaluation
Management
Verification
Health and Safety Management
Risk Management
Service Co-ordination

14 15
SPICE FM Framework SPICE FM Framework

Figure 6: The SPICE FM process maturity model Level 1 – Initial Level 2 – Service Delivery
Level 1 is the basic entry level to the model, Management
Level 5 and has no key processes. An FM provider at At this level, service performance can be
this level has little focus on process, and service predicted to a certain degree. A level 2
Continuously
performance is poor. Good practices are local, organisation has established policies and
Improving and are not repeated or ‘institutionalised’ across procedures for managing and delivering
the organisation. The ineffective capture and customer requirements. Service performance
co-ordination of service requirements tends to standards are established, and service delivery is
Level 4 undermine good practices. Organisations make co-ordinated to minimise disruption to the core
commitments that staff or the supply chain business. As the service is being delivered,
Quantitatively cannot meet, which results in crises. continuous monitoring ensures that
Controlled performance standards are met.
During a crisis, facilities managers typically
abandon planned procedures; instead,
individuals do whatever activities it takes to get Figure 8: At level 2, processes are
Level 3 the job done, with little regard for the effects on
planned and evaluated
Knowledge other people. Figure 7 represents this focus on
results. Time, cost, quality and customer
Management satisfaction may all suffer. For an organisation at
level 1, effective service delivery depends Preparation
entirely on having an exceptional manager and
Level 2 a competent team. When these managers leave,
Service Delivery their stabilising influences leave with them. to produce

Management
Consequently, the organisation is unable to Activity Results
consistently meet the requirements of the
core business. input to

Level 1 organisations must implement all of the to improve

Level 1 level 2 key processes in order to progress, or Evaluation


‘mature’, to the second level of the model.
Initial
Figure 7: At level 1, individual focus
Table 3: Level 2 key processes and their enablers on individual performance

Level Key Process Areas Generic Process Enablers

2 - Service Delivery Service Requirement Management Commitment Activity Results


Management
Service Planning Ability
Service Performance Monitoring Activities
Supplier and Contractor Evaluation
Management
Verification
Health and Safety Management
Risk Management
Service Co-ordination

14 15
SPICE FM Framework SPICE FM Framework

At level 2, FM providers have effective processes (e.g., waiting times, error rates, processing Level 3 – Knowledge Management A well-defined process includes standard
to directly meet the requirements of the core times) are reviewed on a regular basis, with the descriptions and models for performing the
A level 3 organisation builds on the
business. An effective process is one that is involvement of staff, and corrective action is work, and mechanisms to verify that the work
achievements of level 2. At this level,
practised, enforced, trained, documented, evaluated taken when service delivery deviates has been done correctly (such as peer reviews).
the organisation has the capability to capture
and able to improve, as shown in Figure 8. significantly from service plans. It will also incorporate completion criteria, to
and share knowledge across the organisation,
provide an insight into progress.
To date, most of the efforts of the SPICE FM Key process 4- Supplier and contractor as shown in Figure 9.
project have concentrated on defining and management Experience from the software industry offers
So far, the SPICE FM research has had less
raising confidence at level 2 of the model. guidelines on what life at a Level 3 organisation
This key process starts with the selection of focus on level 3, which is anticipated to be the
The research has identified seven key processes feels like. Characteristics of a Level 3
suitable suppliers and contractors. Service level subject of future research. The principles of the
at level 2 which are described below. organisation include: (i) pro-active customer
agreements and performance standards are SPICE model for the construction industry are
management; (ii) an effective defect tracking
Key process 1- Service requirement established and their performance is discussed below.
system, which drives service management; (iii)
management continuously reviewed. At Level 3, an organisation creates “Process an organisation-wide focus on “getting it right”.
Effective management of service requirements Key process 5- Health and safety Improvement Teams (PITs)”, which capture and
For managers, working in a level 3 organisation
identifies the needs of the organisation and its institutionalise best practices. PIT members help
management can be summarised as eyes on, hands off.
users. The service delivery team identifies how create organisation-wide process libraries,
Health and Safety Management ensures that Professionals feel confident in what they
many tiers of customers it has and how their which act as process standards. FM departments
services are delivered in compliance with, produce. They are equipped to do the job, and
requirements differ. The team has a clear sense use these standards to define their unique
or exceed, all mandatory health and safety feel empowered to innovate. There are focused
of priority in term of its customers and the processes. Employees in any part of the
legislation. Health and safety risks are identified, and planned inductions for new starters, with
service mixes it offers. organisation can easily refer to these
assessed, and action taken to eliminate or explanations for what, why and how.
standard processes.
Service level agreements and performance minimise the likelihood of any incidents.
standards are developed and continuously
reviewed to remain consistent with customer Key process 6- Risk management
requirements. They are also communicated to Risk management involves identifying and Figure 9: At level 3, knowledge is shared throughout the organisation
all staff involved in service delivery. evaluating risks so that action can be taken,
either to reduce the likelihood of an event
Key process 2- Service planning
Service planning establishes realistic schedules
occurring or to limit the consequences should Preparation
that event occur. Risks are identified in all areas input to
of work based on customer requirements. of the business (e.g., to the environment, supply
Estimates (e.g., resources, maintenance breakdown, property, financial performance).
schedules, budgets, purchasing) are prepared Staff are actively involved in identifying risks
for all work to be performed (e.g., scheduled Knowledge Capture to produce
and reactive maintenance).
and taking steps to prevent risks becoming a reality.
and Sharing
Activity Results
Key process 7- Service co-ordination
Key process 3- Service performance input to input to
Service co-ordination draws on the experience
monitoring of other service teams, suppliers and customers to improve
Service performance monitoring ensures that to meet customer requirements effectively.
services are delivered in a manner that is Co-ordination between these three groups Evaluation
consistent with the service level agreements and ensures that disruption to the core business is
performance standards established with the minimised. Representatives with responsibility
customer. Feedback is gathered (e.g., from for co-ordination are appointed,
customers and staff) to monitor customer and co-ordination methods are agreed.
satisfaction levels. Performance measures

16 17
SPICE FM Framework SPICE FM Framework

At level 2, FM providers have effective processes (e.g., waiting times, error rates, processing Level 3 – Knowledge Management A well-defined process includes standard
to directly meet the requirements of the core times) are reviewed on a regular basis, with the descriptions and models for performing the
A level 3 organisation builds on the
business. An effective process is one that is involvement of staff, and corrective action is work, and mechanisms to verify that the work
achievements of level 2. At this level,
practised, enforced, trained, documented, evaluated taken when service delivery deviates has been done correctly (such as peer reviews).
the organisation has the capability to capture
and able to improve, as shown in Figure 8. significantly from service plans. It will also incorporate completion criteria, to
and share knowledge across the organisation,
provide an insight into progress.
To date, most of the efforts of the SPICE FM Key process 4- Supplier and contractor as shown in Figure 9.
project have concentrated on defining and management Experience from the software industry offers
So far, the SPICE FM research has had less
raising confidence at level 2 of the model. guidelines on what life at a Level 3 organisation
This key process starts with the selection of focus on level 3, which is anticipated to be the
The research has identified seven key processes feels like. Characteristics of a Level 3
suitable suppliers and contractors. Service level subject of future research. The principles of the
at level 2 which are described below. organisation include: (i) pro-active customer
agreements and performance standards are SPICE model for the construction industry are
management; (ii) an effective defect tracking
Key process 1- Service requirement established and their performance is discussed below.
system, which drives service management; (iii)
management continuously reviewed. At Level 3, an organisation creates “Process an organisation-wide focus on “getting it right”.
Effective management of service requirements Key process 5- Health and safety Improvement Teams (PITs)”, which capture and
For managers, working in a level 3 organisation
identifies the needs of the organisation and its institutionalise best practices. PIT members help
management can be summarised as eyes on, hands off.
users. The service delivery team identifies how create organisation-wide process libraries,
Health and Safety Management ensures that Professionals feel confident in what they
many tiers of customers it has and how their which act as process standards. FM departments
services are delivered in compliance with, produce. They are equipped to do the job, and
requirements differ. The team has a clear sense use these standards to define their unique
or exceed, all mandatory health and safety feel empowered to innovate. There are focused
of priority in term of its customers and the processes. Employees in any part of the
legislation. Health and safety risks are identified, and planned inductions for new starters, with
service mixes it offers. organisation can easily refer to these
assessed, and action taken to eliminate or explanations for what, why and how.
standard processes.
Service level agreements and performance minimise the likelihood of any incidents.
standards are developed and continuously
reviewed to remain consistent with customer Key process 6- Risk management
requirements. They are also communicated to Risk management involves identifying and Figure 9: At level 3, knowledge is shared throughout the organisation
all staff involved in service delivery. evaluating risks so that action can be taken,
either to reduce the likelihood of an event
Key process 2- Service planning
Service planning establishes realistic schedules
occurring or to limit the consequences should Preparation
that event occur. Risks are identified in all areas input to
of work based on customer requirements. of the business (e.g., to the environment, supply
Estimates (e.g., resources, maintenance breakdown, property, financial performance).
schedules, budgets, purchasing) are prepared Staff are actively involved in identifying risks
for all work to be performed (e.g., scheduled Knowledge Capture to produce
and reactive maintenance).
and taking steps to prevent risks becoming a reality.
and Sharing
Activity Results
Key process 7- Service co-ordination
Key process 3- Service performance input to input to
Service co-ordination draws on the experience
monitoring of other service teams, suppliers and customers to improve
Service performance monitoring ensures that to meet customer requirements effectively.
services are delivered in a manner that is Co-ordination between these three groups Evaluation
consistent with the service level agreements and ensures that disruption to the core business is
performance standards established with the minimised. Representatives with responsibility
customer. Feedback is gathered (e.g., from for co-ordination are appointed,
customers and staff) to monitor customer and co-ordination methods are agreed.
satisfaction levels. Performance measures

16 17
SPICE FM Framework SPICE FM Framework

Level 4 – Quantitatively Improved Level 5 – Continuously Improving Process Enablers leadership positions are created and filled, and
that the relevant organisational policy
So far, the SPICE FM research has had little This level is also subject to further research. Anecdotal evidence from the research suggests
statements exist.
focus on level 4 and 5. Most of the issues The expectation is that at level 5, the entire that if managers are asked: “Do you implement
discussed here are subject to further research supply chain is focused on continuous process level 2 key processes?” they are likely to respond Ability
and development. The principles of the CMM® improvement. Level 5 organisations can identify “yes”. On the other hand, current studies
This describes the conditions that must exist
model are discussed below. weaknesses and strengthen processes before any indicate otherwise. So how can managers
before a process can be implemented
problems emerge, and can do so in a ensure that they are performing the key
At this level, organisations are capable of setting competently. It normally means having
collaborative manner. Data on the effectiveness processes adequately?
quality goals for (i) the service, (ii) the process, adequate resources, an appropriate
of the process is used to perform cost benefit
and (iii) supply chain relationships. The SPICE FM research has identified five organisational structure, and training in place.
analysis on any new technologies and on
The organisation will have a programme that process enablers, which are either activities or
proposed changes to processes. Verification
measures productivity and quality for important modes of thinking. These enablers are
This increased level of understanding allows A verification procedure checks that activities
process activities related to service delivery. pre-conditions for implementing the process.
organisations to consider large-scale changes to are performed in compliance with the agreed
This programme forms an objective basis for They are based on principles established in
their processes. Innovations that exploit best process. Adopting such verification checks as a
measuring the process, customer satisfaction, CMM® (Paulk et al, 1994) and SPICE
practice are identified and adopted throughout process enabler emphasises the need for
and harmony across the supply chain. (Sarshar et al, 2000) that were developed
the organisation. independent quality assurance. The focus is on
for the software engineering and construction
Organisations gain control of service delivery by external verification of processes.
sectors respectively.
narrowing variations in process performance,
so that they fall within acceptable boundaries. Process enablers focus on the results that can be Evaluation
Meaningful variations can be distinguished from expected from a key process. This is a forward- This involves internal process evaluation and
random variations. looking approach, which indicates an reviews to help control and improve processes.
organisation has process capability before a During the early stages of maturity, this will
process takes place. Process enablers detail the mean efforts by the team to improve existing
features a key process must have before it can processes. The focus here is on the project
yield successful results. Ensuring that all the team’s internal improvements.
process enablers are in place improves the
performance and predictability of key processes. Activities
This describes the activities, roles and
Process enablers apply across all the
procedures necessary to implement processes.
key processes.
They typically involve establishing plans and
Commitment procedures, performing the work, tracking it,
This involves an organisation taking action to and taking corrective action as necessary.
ensure that the process is established and is
lasting. Typically, this means establishing policies
that are shared by the whole organisation.
Some processes need sponsors or leaders in the
organisation. Commitment ensures that

18 19
SPICE FM Framework SPICE FM Framework

Level 4 – Quantitatively Improved Level 5 – Continuously Improving Process Enablers leadership positions are created and filled, and
that the relevant organisational policy
So far, the SPICE FM research has had little This level is also subject to further research. Anecdotal evidence from the research suggests
statements exist.
focus on level 4 and 5. Most of the issues The expectation is that at level 5, the entire that if managers are asked: “Do you implement
discussed here are subject to further research supply chain is focused on continuous process level 2 key processes?” they are likely to respond Ability
and development. The principles of the CMM® improvement. Level 5 organisations can identify “yes”. On the other hand, current studies
This describes the conditions that must exist
model are discussed below. weaknesses and strengthen processes before any indicate otherwise. So how can managers
before a process can be implemented
problems emerge, and can do so in a ensure that they are performing the key
At this level, organisations are capable of setting competently. It normally means having
collaborative manner. Data on the effectiveness processes adequately?
quality goals for (i) the service, (ii) the process, adequate resources, an appropriate
of the process is used to perform cost benefit
and (iii) supply chain relationships. The SPICE FM research has identified five organisational structure, and training in place.
analysis on any new technologies and on
The organisation will have a programme that process enablers, which are either activities or
proposed changes to processes. Verification
measures productivity and quality for important modes of thinking. These enablers are
This increased level of understanding allows A verification procedure checks that activities
process activities related to service delivery. pre-conditions for implementing the process.
organisations to consider large-scale changes to are performed in compliance with the agreed
This programme forms an objective basis for They are based on principles established in
their processes. Innovations that exploit best process. Adopting such verification checks as a
measuring the process, customer satisfaction, CMM® (Paulk et al, 1994) and SPICE
practice are identified and adopted throughout process enabler emphasises the need for
and harmony across the supply chain. (Sarshar et al, 2000) that were developed
the organisation. independent quality assurance. The focus is on
for the software engineering and construction
Organisations gain control of service delivery by external verification of processes.
sectors respectively.
narrowing variations in process performance,
so that they fall within acceptable boundaries. Process enablers focus on the results that can be Evaluation
Meaningful variations can be distinguished from expected from a key process. This is a forward- This involves internal process evaluation and
random variations. looking approach, which indicates an reviews to help control and improve processes.
organisation has process capability before a During the early stages of maturity, this will
process takes place. Process enablers detail the mean efforts by the team to improve existing
features a key process must have before it can processes. The focus here is on the project
yield successful results. Ensuring that all the team’s internal improvements.
process enablers are in place improves the
performance and predictability of key processes. Activities
This describes the activities, roles and
Process enablers apply across all the
procedures necessary to implement processes.
key processes.
They typically involve establishing plans and
Commitment procedures, performing the work, tracking it,
This involves an organisation taking action to and taking corrective action as necessary.
ensure that the process is established and is
lasting. Typically, this means establishing policies
that are shared by the whole organisation.
Some processes need sponsors or leaders in the
organisation. Commitment ensures that

18 19
SPICE FM Framework SPICE FM Framework

Continuous improvement Stage 3: Prioritise, implement and monitor


Creating a Continuous Figure 10 illustrates the SPICE FM framework’s Stage 3 of the cycle clarifies the relationship
use of the Balanced Scorecard and the SPICE between a process improvement initiative and
Improvement Infrastructure FM Maturity Model to prioritise and monitor
the effectiveness of process improvement efforts.
the business’s aims and objectives. Process
improvement opportunities are prioritised on
So far, this booklet has presented two differing Justifying the investment required to their contribution to the organisation’s critical
Stage 1: Identify strategic objectives success factors. Once improvement initiatives
approaches to improving FM performance: improve processes
one based on strategic management, the other Initially, the Balanced Scorecard is used to are selected, the organisation establishes
Evidence from other business sectors suggests clarify the organisation’s business objectives.
on operational process improvement. measures, baselines and targets to monitor their
that organisations tend to overlook the need to Different levels within organisations can develop
Used individually, both offer valuable effect. The new measures are then incorporated
link improvements to business objectives. separate scorecards, all linked to the
approaches to organisational change and into a revised scorecard and the continuous
Organisations often choose to follow the exact requirements of the core business.
continuous improvement. improvement cycle starts again.
requirements of a particular model or
However, the SPICE FM framework uses these framework (such as CMM® or SPICE). Stage 2: Evaluate current FM Developing process capability
techniques together to offer a powerful business This approach can result in quality awards and management processes By following the stages in the cycle, the FM
development tool. accreditations. However, evidence suggests that The FM provider evaluates its management provider is continually improving in accordance
if process and quality improvement efforts are processes using the SPICE Process with the needs of the core business. In doing so,
Why link process improvement not linked to strategic business directions, they Maturity Model. This evaluation typically the FM provider is developing the capability to
to strategy? may fail to promote business competitiveness implement the core business’ long term vision.
highlights deficiencies in the FM provider’s
Gap between strategy formulation and survival. process capability. Furthermore, the importance of FM services to
and implementation In SPICE FM, businesses can continuously the core business is highlighted, which in
align business goals and process improvement turn raises the profile of FM at board level
Surveys indicate that around 90% of developed
efforts in order to prioritise effort and of the core business and enables greater
strategies fail to be properly executed.
justify investment. strategic input.
Even using the Balanced Scorecard, 70% of
strategies are not implemented (Fortune, 1997). Figure 10: The SPICE FM continuous process improvement cycle
This highlights the need for a continuous
learning framework that links strategic directions
to operational requirements and improvements.
SPICE FM seeks to create such framework,
through two mechanisms: 1 2
Identify the FM strategy, Evaluate current FM
■ Level 2 of the model focuses on operational linked to the core service management
effectiveness of service delivery in relation business's objectives processes
to strategy.
■ The SPICE FM assessment process
(discussed later in this handbook) provides
teams with a problem-solving infrastructure
and a partial feedback loop. It involves top-
to-bottom cross sections of organisations
discussing the effectiveness of operational
processes. The teams jointly reach decisions
on future improvements. 3
Prioritise, implement and
monitor improvement
to processes

20 21
SPICE FM Framework SPICE FM Framework

Continuous improvement Stage 3: Prioritise, implement and monitor


Creating a Continuous Figure 10 illustrates the SPICE FM framework’s Stage 3 of the cycle clarifies the relationship
use of the Balanced Scorecard and the SPICE between a process improvement initiative and
Improvement Infrastructure FM Maturity Model to prioritise and monitor
the effectiveness of process improvement efforts.
the business’s aims and objectives. Process
improvement opportunities are prioritised on
So far, this booklet has presented two differing Justifying the investment required to their contribution to the organisation’s critical
Stage 1: Identify strategic objectives success factors. Once improvement initiatives
approaches to improving FM performance: improve processes
one based on strategic management, the other Initially, the Balanced Scorecard is used to are selected, the organisation establishes
Evidence from other business sectors suggests clarify the organisation’s business objectives.
on operational process improvement. measures, baselines and targets to monitor their
that organisations tend to overlook the need to Different levels within organisations can develop
Used individually, both offer valuable effect. The new measures are then incorporated
link improvements to business objectives. separate scorecards, all linked to the
approaches to organisational change and into a revised scorecard and the continuous
Organisations often choose to follow the exact requirements of the core business.
continuous improvement. improvement cycle starts again.
requirements of a particular model or
However, the SPICE FM framework uses these framework (such as CMM® or SPICE). Stage 2: Evaluate current FM Developing process capability
techniques together to offer a powerful business This approach can result in quality awards and management processes By following the stages in the cycle, the FM
development tool. accreditations. However, evidence suggests that The FM provider evaluates its management provider is continually improving in accordance
if process and quality improvement efforts are processes using the SPICE Process with the needs of the core business. In doing so,
Why link process improvement not linked to strategic business directions, they Maturity Model. This evaluation typically the FM provider is developing the capability to
to strategy? may fail to promote business competitiveness implement the core business’ long term vision.
highlights deficiencies in the FM provider’s
Gap between strategy formulation and survival. process capability. Furthermore, the importance of FM services to
and implementation In SPICE FM, businesses can continuously the core business is highlighted, which in
align business goals and process improvement turn raises the profile of FM at board level
Surveys indicate that around 90% of developed
efforts in order to prioritise effort and of the core business and enables greater
strategies fail to be properly executed.
justify investment. strategic input.
Even using the Balanced Scorecard, 70% of
strategies are not implemented (Fortune, 1997). Figure 10: The SPICE FM continuous process improvement cycle
This highlights the need for a continuous
learning framework that links strategic directions
to operational requirements and improvements.
SPICE FM seeks to create such framework,
through two mechanisms: 1 2
Identify the FM strategy, Evaluate current FM
■ Level 2 of the model focuses on operational linked to the core service management
effectiveness of service delivery in relation business's objectives processes
to strategy.
■ The SPICE FM assessment process
(discussed later in this handbook) provides
teams with a problem-solving infrastructure
and a partial feedback loop. It involves top-
to-bottom cross sections of organisations
discussing the effectiveness of operational
processes. The teams jointly reach decisions
on future improvements. 3
Prioritise, implement and
monitor improvement
to processes

20 21
SPICE FM Framework SPICE FM Framework

Real Life Examples

The SPICE FM Assessment Process The fact-finding comprised standard A series of case studies of FM providers, ■ The FM department’s vision and
questionnaires, followed by semi-structured including several NHS Trusts and a large high corresponding objectives;
The SPICE FM assessment process engages staff
interviews and a limited document review. street retailer, has tested the SPICE FM
from service delivery teams. It obtains feedback ■ Critical success factors in relation to these
Extracts from the standard questionnaire can framework extensively. Four of these case
from staff and involves them in improvement objectives; and
be found in appendix A. studies are examined in this section.
decisions. Consequently, staff feel valued and
■ Development of performance measures to
have ownership of the subsequent outcomes. ■ Analysis of results and feedback - Based on the Study 1 – Maintenance department support the critical success factors.
questionnaires, interviews and document at a NHS Trust
During the case study assessments, the process
followed five phases: gaining commitment;
reviews, the assessment team put together its Critical success factors and corresponding
detailed findings, highlighting process Background
developing the Balanced Scorecard; service performance measures
strengths and weaknesses. The findings were The maintenance department of an NHS Trust
delivery fact finding; analysing results and Critical success factors and appropriate
also summarised in a matrix of departmental in the North West of England had responsibility
feedback; and prioritisation and improvements. measures were determined, based on the
process capability. The results were shared for repair and maintenance work to the hospital
These are discussed below. management responses and bearing the FM
with the participants, who discussed and exterior and interior. In addition to repairing
department’s vision and objectives in mind.
■ Gaining Commitment - Initially, the SPICE agreed the findings, then discussed a list of faults reported by hospital staff,
It was able to build a Balanced Scorecard by
team briefed senior management and improvement opportunities. the department also had a preventative
focusing on aspects of the business which
obtained their commitment to perform the maintenance programme.
■ Prioritisation and improvements - Senior created value for customers, and by re-
SPICE FM assessment.
management reviewed the findings and Directly employed labour, including plumbers, appraising its philosophy as an organisation and
■ Developing the Balanced Scorecard - Existing improvement opportunities. joiners and electricians, performed most of the incorporating it into the performance
business plans and documentation, The improvements were prioritised for work. The majority of staff were highly measurement system. Some of the critical
in conjunction with senior management action based on their relevance to the experienced with extensive on-the-job training success factors identified are listed in Table 4.
interviews, were used to develop a Balanced objectives and critical success factors and appropriate trade qualifications.
Scorecard for the department. Objectives detailed in the Balanced Scorecard.
and critical success factors that contributed Strategic awareness and
Each improvement initiative was
directly to the core business’s objectives were subsequently viewed as a project in its own performance assessment
developed. In addition, the scorecard right, with its own resources and timescales. The Balanced Scorecard programme provided
identified appropriate measures for each Senior management reviewed progress. credible and documented assessment of the
critical success factor. estates and facilities service system. According to
the process outlined by Kaplan and Norton,
■ Service delivery fact finding - Next, members of
the data collection was structured by three
staff were selected to participate in a process
main stages:
assessment. This focused on senior and
middle management, as well as members of
staff either responsible for or directly
affected by the key processes being assessed.

22 23
SPICE FM Framework SPICE FM Framework

Real Life Examples

The SPICE FM Assessment Process The fact-finding comprised standard A series of case studies of FM providers, ■ The FM department’s vision and
questionnaires, followed by semi-structured including several NHS Trusts and a large high corresponding objectives;
The SPICE FM assessment process engages staff
interviews and a limited document review. street retailer, has tested the SPICE FM
from service delivery teams. It obtains feedback ■ Critical success factors in relation to these
Extracts from the standard questionnaire can framework extensively. Four of these case
from staff and involves them in improvement objectives; and
be found in appendix A. studies are examined in this section.
decisions. Consequently, staff feel valued and
■ Development of performance measures to
have ownership of the subsequent outcomes. ■ Analysis of results and feedback - Based on the Study 1 – Maintenance department support the critical success factors.
questionnaires, interviews and document at a NHS Trust
During the case study assessments, the process
followed five phases: gaining commitment;
reviews, the assessment team put together its Critical success factors and corresponding
detailed findings, highlighting process Background
developing the Balanced Scorecard; service performance measures
strengths and weaknesses. The findings were The maintenance department of an NHS Trust
delivery fact finding; analysing results and Critical success factors and appropriate
also summarised in a matrix of departmental in the North West of England had responsibility
feedback; and prioritisation and improvements. measures were determined, based on the
process capability. The results were shared for repair and maintenance work to the hospital
These are discussed below. management responses and bearing the FM
with the participants, who discussed and exterior and interior. In addition to repairing
department’s vision and objectives in mind.
■ Gaining Commitment - Initially, the SPICE agreed the findings, then discussed a list of faults reported by hospital staff,
It was able to build a Balanced Scorecard by
team briefed senior management and improvement opportunities. the department also had a preventative
focusing on aspects of the business which
obtained their commitment to perform the maintenance programme.
■ Prioritisation and improvements - Senior created value for customers, and by re-
SPICE FM assessment.
management reviewed the findings and Directly employed labour, including plumbers, appraising its philosophy as an organisation and
■ Developing the Balanced Scorecard - Existing improvement opportunities. joiners and electricians, performed most of the incorporating it into the performance
business plans and documentation, The improvements were prioritised for work. The majority of staff were highly measurement system. Some of the critical
in conjunction with senior management action based on their relevance to the experienced with extensive on-the-job training success factors identified are listed in Table 4.
interviews, were used to develop a Balanced objectives and critical success factors and appropriate trade qualifications.
Scorecard for the department. Objectives detailed in the Balanced Scorecard.
and critical success factors that contributed Strategic awareness and
Each improvement initiative was
directly to the core business’s objectives were subsequently viewed as a project in its own performance assessment
developed. In addition, the scorecard right, with its own resources and timescales. The Balanced Scorecard programme provided
identified appropriate measures for each Senior management reviewed progress. credible and documented assessment of the
critical success factor. estates and facilities service system. According to
the process outlined by Kaplan and Norton,
■ Service delivery fact finding - Next, members of
the data collection was structured by three
staff were selected to participate in a process
main stages:
assessment. This focused on senior and
middle management, as well as members of
staff either responsible for or directly
affected by the key processes being assessed.

22 23
SPICE FM Framework SPICE FM Framework

Table 4: Critical success factors The management agreed that the programme Communication between the department and its
The department’s perspective
provided a results-oriented approach for customers was poor, with trade staff often failing
Customer FM internal evaluating the Trust’s estates and FM system. to keep the customer informed of delays that “The findings were an accurate review of our
perspective processes The Balanced Scorecard looked beyond prevented immediate repairs. Poor communication performance. The fast changing environment
Timeliness Workplace health and quality compliance and evaluated performance and was leaving customers uncertain, and consequently that we operate in makes it important for us to
operational effectiveness. It gave the dissatisfied with the quality of service.
Quality Capital asset management look at ways in which we can improve. We don’t
department a valuable tool for enabling
A lack of clearly defined expectations for risk usually give ourselves the time to reflect, but
Service Workforce management employees to understand their organisation,
assessments sometimes resulted in work being SPICE FM did provide us with that opportunity.
partnership and and provided useful documentation for
undertaken without the necessary risk
co-ordination developing control measures. This will guide
assessments in place. This was in spite of The assessment process actively involved our
Service performance the department towards achieving its goals and
extensive health and safety training. An over- staff in the change process, which helped gain
vision. This programme will remain flexible and
Learning Financial stretched supervisory team, which had primary their commitment. A working group has been set
encourage continuous improvement while
and growth perspective responsibility for preparing risk assessments,
maintaining a cost effective monitoring system. up to take forward a number of issues raised in
Service delivery Financial resource compounded the problem.
the assessment findings. A new information
innovation management Process capability findings Lack of review and evaluation was a system is being introduced to help us keep the
Quality CRES (Cash releasing Figure 11 summarises the department’s process weakness across the management processes.
customer better informed. We‘ve also introduced
development and efficiency schemes) capability against the SPICE FM model. Although there was an informal review system,
a new system for automatically including risk
implementation At the hub of the department was a helpdesk the lack of resources to tackle specific issues
prevented action. assessments on the job sheets that we issue to our
Staff Procurement and that staff throughout the hospital used to
trade-staff ”.
development purchasing strategies register faults. The SPICE assessment noted the Table 5 demonstrates the importance of these
department’s well-defined systems for recording process improvement opportunities by aligning
Staff strategic Asset utilisation strategies faults and for producing cost and time estimates them with the strategic perspectives of the
awareness before work was assigned to appropriate staff. department’s Balanced Scorecard.
The department also held an extensive asset
register to plan preventative maintenance.
The assessment translated the organisation’s
vision into a set of objective performance Data extracted from the department’s
indicators across the above four perspectives of information system, in addition to an annual
the Balanced Scorecard. The Scorecard also customer satisfaction survey, permitted
assessed the organisation’s efforts to improve performance monitoring against
processes, motivate and educate employees, established targets.
enhance information and communication In addition to these strengths, the assessment
systems, while at the same time providing best also highlighted a number of weaknesses that
value, cost effective and responsive levels the department’s management recognised
of service. as important.

24 25
SPICE FM Framework SPICE FM Framework

Table 4: Critical success factors The management agreed that the programme Communication between the department and its
The department’s perspective
provided a results-oriented approach for customers was poor, with trade staff often failing
Customer FM internal evaluating the Trust’s estates and FM system. to keep the customer informed of delays that “The findings were an accurate review of our
perspective processes The Balanced Scorecard looked beyond prevented immediate repairs. Poor communication performance. The fast changing environment
Timeliness Workplace health and quality compliance and evaluated performance and was leaving customers uncertain, and consequently that we operate in makes it important for us to
operational effectiveness. It gave the dissatisfied with the quality of service.
Quality Capital asset management look at ways in which we can improve. We don’t
department a valuable tool for enabling
A lack of clearly defined expectations for risk usually give ourselves the time to reflect, but
Service Workforce management employees to understand their organisation,
assessments sometimes resulted in work being SPICE FM did provide us with that opportunity.
partnership and and provided useful documentation for
undertaken without the necessary risk
co-ordination developing control measures. This will guide
assessments in place. This was in spite of The assessment process actively involved our
Service performance the department towards achieving its goals and
extensive health and safety training. An over- staff in the change process, which helped gain
vision. This programme will remain flexible and
Learning Financial stretched supervisory team, which had primary their commitment. A working group has been set
encourage continuous improvement while
and growth perspective responsibility for preparing risk assessments,
maintaining a cost effective monitoring system. up to take forward a number of issues raised in
Service delivery Financial resource compounded the problem.
the assessment findings. A new information
innovation management Process capability findings Lack of review and evaluation was a system is being introduced to help us keep the
Quality CRES (Cash releasing Figure 11 summarises the department’s process weakness across the management processes.
customer better informed. We‘ve also introduced
development and efficiency schemes) capability against the SPICE FM model. Although there was an informal review system,
a new system for automatically including risk
implementation At the hub of the department was a helpdesk the lack of resources to tackle specific issues
prevented action. assessments on the job sheets that we issue to our
Staff Procurement and that staff throughout the hospital used to
trade-staff ”.
development purchasing strategies register faults. The SPICE assessment noted the Table 5 demonstrates the importance of these
department’s well-defined systems for recording process improvement opportunities by aligning
Staff strategic Asset utilisation strategies faults and for producing cost and time estimates them with the strategic perspectives of the
awareness before work was assigned to appropriate staff. department’s Balanced Scorecard.
The department also held an extensive asset
register to plan preventative maintenance.
The assessment translated the organisation’s
vision into a set of objective performance Data extracted from the department’s
indicators across the above four perspectives of information system, in addition to an annual
the Balanced Scorecard. The Scorecard also customer satisfaction survey, permitted
assessed the organisation’s efforts to improve performance monitoring against
processes, motivate and educate employees, established targets.
enhance information and communication In addition to these strengths, the assessment
systems, while at the same time providing best also highlighted a number of weaknesses that
value, cost effective and responsive levels the department’s management recognised
of service. as important.

24 25
SPICE FM Framework SPICE FM Framework

Figure 11: The department’s process capability profile

Key Level 2 Key Processes Study 2 – Sterilisation unit By focusing on the aspects of the business that
at a NHS Trust created value for customers, and by carefully

Supplier & Contractor Mgt.


Service Requirement Mgt
re-appraising the trust’s overall philosophy and

Performance Monitoring
Satisfied

Health and Safety Mgt.


Background incorporating this in to their performance

Service Co-ordination
Case study 2 was a unit at an NHS Trust in the measurement system, the organisation was able

Risk Management
Partially Satisfied
Service Planning
North West of England with primary to build a Balanced Scorecard. It formed an
responsibility for the sterilisation of surgical effective means of communicating the strategy
instruments for hospital theatres and wards. of the overall trust through the sub-business
Not Satisfied
The department also received linen and gowns unit. Some of the critical success factors
from the on-site hospital laundry for pressing identified are listed in Table 6.
and packing before distribution throughout
the hospital.
Table 6: Critical success factors
Commitment
Process enablers

The department had a highly structured Customer Internal processes


Ability
operational process, similar to a production line. Quality Workforce management
Activities It also had a flat organisational structure
Service partnership Service performance
Evaluation where management was closely integrated
with operational staff. Many of the staff Learning
Verification Financial
were unskilled. and growth

These issues made the department an important Quality development Financial resource
Table 5: Strategically aligned process improvement opportunities test of SPICE FM’s appropriateness to the broad and implementation management
scope of functions present within the FM sector. CRES (Cash releasing
Critical Success Related Process 2000 2001 Staff development
Measure efficiency schemes)
Factor Improvement Baseline Target Strategic awareness and
performance assessment Management believed that the Balanced
Telephone calls Scorecard provided a strategic framework and
There are some similarities between this case
Balanced Scorecard Perspectives

Improve Timeliness answered within 95% 99% highlighted the most important elements in
study and the previous one in the design and
Customer

5 seconds achieving the goals of the overall trust.


implementation of their Balanced Scorecards.
Customer Liaison Emergencies attended Accordingly, critical measurements were
Increase Customer 98% 100% In this case, senior managers had traditionally
Information the same day incorporated into the Scorecard to achieve the
Satisfaction been heavily involved in setting goals for
System objectives identified above.
Jobs completed individual divisions and groups.
70% 80%
on first visit Experience within the department had shown The use of the Balanced Scorecard as an aid
that appropriately set and defined targets towards ongoing management control was
Internal Process

- 90% contributed both to the motivation of employees emphasised. It detailed all the key critical success
Improve Workplace
and the eventual success of the department. factors and performance indicators for the sterilising
Health and Quality Risk Assessment Risk assessments This culture was incorporated into the unit as a way of focusing the organisation’s
Training in place for jobs Balanced Scorecard. activities and measuring its achievements.

26 27
SPICE FM Framework SPICE FM Framework

Figure 11: The department’s process capability profile

Key Level 2 Key Processes Study 2 – Sterilisation unit By focusing on the aspects of the business that
at a NHS Trust created value for customers, and by carefully

Supplier & Contractor Mgt.


Service Requirement Mgt
re-appraising the trust’s overall philosophy and

Performance Monitoring
Satisfied

Health and Safety Mgt.


Background incorporating this in to their performance

Service Co-ordination
Case study 2 was a unit at an NHS Trust in the measurement system, the organisation was able

Risk Management
Partially Satisfied
Service Planning
North West of England with primary to build a Balanced Scorecard. It formed an
responsibility for the sterilisation of surgical effective means of communicating the strategy
instruments for hospital theatres and wards. of the overall trust through the sub-business
Not Satisfied
The department also received linen and gowns unit. Some of the critical success factors
from the on-site hospital laundry for pressing identified are listed in Table 6.
and packing before distribution throughout
the hospital.
Table 6: Critical success factors
Commitment
Process enablers

The department had a highly structured Customer Internal processes


Ability
operational process, similar to a production line. Quality Workforce management
Activities It also had a flat organisational structure
Service partnership Service performance
Evaluation where management was closely integrated
with operational staff. Many of the staff Learning
Verification Financial
were unskilled. and growth

These issues made the department an important Quality development Financial resource
Table 5: Strategically aligned process improvement opportunities test of SPICE FM’s appropriateness to the broad and implementation management
scope of functions present within the FM sector. CRES (Cash releasing
Critical Success Related Process 2000 2001 Staff development
Measure efficiency schemes)
Factor Improvement Baseline Target Strategic awareness and
performance assessment Management believed that the Balanced
Telephone calls Scorecard provided a strategic framework and
There are some similarities between this case
Balanced Scorecard Perspectives

Improve Timeliness answered within 95% 99% highlighted the most important elements in
study and the previous one in the design and
Customer

5 seconds achieving the goals of the overall trust.


implementation of their Balanced Scorecards.
Customer Liaison Emergencies attended Accordingly, critical measurements were
Increase Customer 98% 100% In this case, senior managers had traditionally
Information the same day incorporated into the Scorecard to achieve the
Satisfaction been heavily involved in setting goals for
System objectives identified above.
Jobs completed individual divisions and groups.
70% 80%
on first visit Experience within the department had shown The use of the Balanced Scorecard as an aid
that appropriately set and defined targets towards ongoing management control was
Internal Process

- 90% contributed both to the motivation of employees emphasised. It detailed all the key critical success
Improve Workplace
and the eventual success of the department. factors and performance indicators for the sterilising
Health and Quality Risk Assessment Risk assessments This culture was incorporated into the unit as a way of focusing the organisation’s
Training in place for jobs Balanced Scorecard. activities and measuring its achievements.

26 27
SPICE FM Framework SPICE FM Framework

The Scorecard proved to be a good tool to link The department also had insufficient resources Figure 12: The department’s process capability profile
top-level strategic business requirements with and information technology to monitor certain
day-to-day activities within the department. aspects of its service performance. Most notably,
Applying the SPICE assessment provided an measures such as ‘instrument down time’,
opportunity to identify the process capabilities ‘turnaround time’, ‘level of re-work’ and ‘failure
of the organisation. The assessment examined rate’ were not calculated, even thought they
Key Level 2 Key Processes
day-to-day management processes within the were included in the hospital’s business plan.

Supplier & Contractor Mgt.


organisation and ensured that the critical
Table 7 summarises these issues and

Service Requirement Mgt

Performance Monitoring
success factors in the Balanced Scorecard were Satisfied

Health and Safety Mgt.


demonstrates their relevance to department’s

Service Co-ordination
actually measured and analysed, and that action
strategic objectives.

Risk Management
plans were developed to satisfy the strategic Partially Satisfied

Service Planning
issues it raised.

Process capability findings The department’s perspective


Not Satisfied
Despite the nature of the department’s “The Trust recognises the sterilisation unit as an
operations, the SPICE FM key processes were example of best practice; the SPICE FM
appropriate. Due to the high proportion of findings confirm this view.
unskilled staff in the department, semi- Commitment

Process enablers
We were concerned that questionnaires would
structured interviews were used in place of be unsuitable for the type of staff we employ, Ability
questionnaires. This overcame problems with but the model appeared flexible enough to
terminology and highlighted the model’s ability Activities
overcome this. We were also pleased that the
to adapt to the differing requirements of assessment process recognised many of the Evaluation
individual departments. important cultural issues that are present within Verification
Figure 12 summarises the department’s process an environment such as this.
capability against the SPICE FM model. We are in the process of applying for funding to
The summary emphasises the maturity of the purchase a new bar-coding system that will help Table 7: Strategically aligned process improvement opportunities
processes used within the department. us to monitor certain aspects of our
However, despite the department’s overall performance, something we currently don’t Areas identified Perspective addressed in
have the capability to do. The SPICE FM Suggested actions
strengths, the exercise did reveal some for improvement business plan
opportunities for improvement. Most notably, model, by linking improvement opportunities to
the department lacked clear guidelines or our business objectives, justifies the investment”. Increase resourcing (e.g. introduce
training for developing contingency plans as Performance information system) so that monitoring
Management of departmental
part of its risk management activities. Monitoring activities can be accommodated within the
activities to deliver service level
Despite this, the managerial staff used their current organisational structure.
agreements and achieve
experience to ensure a comprehensive efficiency standards. Implement new measures to monitor
contingency plan was in place. This is an performance (instrument down time,
example of good staff overcoming shortcomings turnaround time, level of re-work, failure rate.
in the organisational processes. Meet the requirements of the
Risk hospital, particularly the theatres
Management Trust to develop guidelines and standards
and anaesthetics directorate, in for the production of contingency
Standards terms of provision of sterile services.
plans / risk management. Support with
Management of departmental activities training programme.
to deliver service level agreements
and achieve efficiency standards.

28 29
SPICE FM Framework SPICE FM Framework

The Scorecard proved to be a good tool to link The department also had insufficient resources Figure 12: The department’s process capability profile
top-level strategic business requirements with and information technology to monitor certain
day-to-day activities within the department. aspects of its service performance. Most notably,
Applying the SPICE assessment provided an measures such as ‘instrument down time’,
opportunity to identify the process capabilities ‘turnaround time’, ‘level of re-work’ and ‘failure
of the organisation. The assessment examined rate’ were not calculated, even thought they
Key Level 2 Key Processes
day-to-day management processes within the were included in the hospital’s business plan.

Supplier & Contractor Mgt.


organisation and ensured that the critical
Table 7 summarises these issues and

Service Requirement Mgt

Performance Monitoring
success factors in the Balanced Scorecard were Satisfied

Health and Safety Mgt.


demonstrates their relevance to department’s

Service Co-ordination
actually measured and analysed, and that action
strategic objectives.

Risk Management
plans were developed to satisfy the strategic Partially Satisfied

Service Planning
issues it raised.

Process capability findings The department’s perspective


Not Satisfied
Despite the nature of the department’s “The Trust recognises the sterilisation unit as an
operations, the SPICE FM key processes were example of best practice; the SPICE FM
appropriate. Due to the high proportion of findings confirm this view.
unskilled staff in the department, semi- Commitment

Process enablers
We were concerned that questionnaires would
structured interviews were used in place of be unsuitable for the type of staff we employ, Ability
questionnaires. This overcame problems with but the model appeared flexible enough to
terminology and highlighted the model’s ability Activities
overcome this. We were also pleased that the
to adapt to the differing requirements of assessment process recognised many of the Evaluation
individual departments. important cultural issues that are present within Verification
Figure 12 summarises the department’s process an environment such as this.
capability against the SPICE FM model. We are in the process of applying for funding to
The summary emphasises the maturity of the purchase a new bar-coding system that will help Table 7: Strategically aligned process improvement opportunities
processes used within the department. us to monitor certain aspects of our
However, despite the department’s overall performance, something we currently don’t Areas identified Perspective addressed in
have the capability to do. The SPICE FM Suggested actions
strengths, the exercise did reveal some for improvement business plan
opportunities for improvement. Most notably, model, by linking improvement opportunities to
the department lacked clear guidelines or our business objectives, justifies the investment”. Increase resourcing (e.g. introduce
training for developing contingency plans as Performance information system) so that monitoring
Management of departmental
part of its risk management activities. Monitoring activities can be accommodated within the
activities to deliver service level
Despite this, the managerial staff used their current organisational structure.
agreements and achieve
experience to ensure a comprehensive efficiency standards. Implement new measures to monitor
contingency plan was in place. This is an performance (instrument down time,
example of good staff overcoming shortcomings turnaround time, level of re-work, failure rate.
in the organisational processes. Meet the requirements of the
Risk hospital, particularly the theatres
Management Trust to develop guidelines and standards
and anaesthetics directorate, in for the production of contingency
Standards terms of provision of sterile services.
plans / risk management. Support with
Management of departmental activities training programme.
to deliver service level agreements
and achieve efficiency standards.

28 29
SPICE FM Framework SPICE FM Framework

Study 3 – Facilities Directorate An essential component of the directorate’s Key indicators provide real focus and these can ■ Offering training in
at a NHS Trust strategy was the establishment of facilities be cascaded to a departmental level, particularly improvement techniques;
performance targets, against which the important in a large organisation such as this.
Background ■ Establishing a reward and recognition system
performance of the facilities can be monitored Regular reporting of the measures in this
to foster performance improvements;
The third case study was a facilities directorate and measured. The development of a BSC format could provide the information necessary
at an NHS Trust in the North West of England. provided a results oriented approach for to keep the Directorate on track and to take ■ Breaking down organisational barriers; and
The NHS recognised the Trust as a national and evaluating the Trust's facilities management corrective action rather than having to wait ■ Co-ordinating with the entire trust and
international centre of excellence in healthcare system. The BSC looked beyond compliance until after the event to realise that things have responsibilities of other directorates;
and research. and evaluates performance and not gone according to the plan.
operational effectiveness. Process capability findings
However, as a large and complex organisation, Based on the above critical success factors,
with a turnover in excess of £150m, A BSC was developed to act as an effective appropriate performance targets were drawn To ensure the process capability finding’s
the Facilities Directorate played an important communication strategy. Table 8 lists some of to ensure: accuracy, it was necessary to secure a
part in ensuring the Hospital’s effectiveness. the critical success factors identified against the representative sample of staff to participate in
■ Improvements in the quality of the operation the study. Due to the size of the directorate,
At the commencement of the study, the BSC’s four perspectives.
over time; the assessment team held workshops with
Directorate’s senior management were operational staff, thus allowing larger
Table 8: Critical success factors ■ Improvements in statutory compliance,
concerned about staff morale. This was due to numbers of staff to participate, whilst not
reduction in risk, and achievement of
the impending transfer of many of their services requiring an extension to the overall duration
Customer Internal processes controls assurance standards;
to the private sector under the Private Finance of the assessment.
Initiative. Furthermore, management were Quality Healthcare in partnership ■ Changes in the revenue cost of the
concerned about the inability of the Directorate operational estate over time; Figure 13 summarises the directorate’s process
Service partnership Operational services capability against the SPICE FM model.
to implement its plans and strategic directives at ■ Improvements in the utilisation of the estate
an operational level. Consequently, they were Timeliness Risk Management A key issue revealed by the assessment was the
over time; that is, condition appraisal in
keen to see the results of the study. Learning seeking out underused and surplus estates; disparity between levels of staff in their
Financial
Four vital services of the department were and growth and awareness of strategic directives and processes.
chosen to participate in the study: catering; Development of For example, at the centre of the NHS’s vision is
Value for money ■ Improvement in the quality of the a National Plan that sets out its future direction
operational estates; domestics; portering. Facilities environment for patients. and key objectives. Despite its importance, the
Strategic awareness and performance Staff development Achieving the financial study revealed that many staff at a supervisory
The facilities directorate has further taken
assessment and training recovery plan and practitioner level were unaware of the
several steps to encourage support for Balanced
The development of the Balanced Scorecard at Service Delivery Scorecard activities by: issues raised within the plan and, more
the Central Manchester NHS Trust Facilities Innovation importantly, the impact it should have on their
■ Making a commitment at the senior
Directorate attempted to pull together current day-to-day operations.
management level;
measures, the Patient Environment Assessment
measures and new measures drawn from the ■ Incorporating the issued identified through
NHS plan, into a Balanced Scorecard using its the BSC development programme to its
four perspectives. business plan;

30 31
SPICE FM Framework SPICE FM Framework

Study 3 – Facilities Directorate An essential component of the directorate’s Key indicators provide real focus and these can ■ Offering training in
at a NHS Trust strategy was the establishment of facilities be cascaded to a departmental level, particularly improvement techniques;
performance targets, against which the important in a large organisation such as this.
Background ■ Establishing a reward and recognition system
performance of the facilities can be monitored Regular reporting of the measures in this
to foster performance improvements;
The third case study was a facilities directorate and measured. The development of a BSC format could provide the information necessary
at an NHS Trust in the North West of England. provided a results oriented approach for to keep the Directorate on track and to take ■ Breaking down organisational barriers; and
The NHS recognised the Trust as a national and evaluating the Trust's facilities management corrective action rather than having to wait ■ Co-ordinating with the entire trust and
international centre of excellence in healthcare system. The BSC looked beyond compliance until after the event to realise that things have responsibilities of other directorates;
and research. and evaluates performance and not gone according to the plan.
operational effectiveness. Process capability findings
However, as a large and complex organisation, Based on the above critical success factors,
with a turnover in excess of £150m, A BSC was developed to act as an effective appropriate performance targets were drawn To ensure the process capability finding’s
the Facilities Directorate played an important communication strategy. Table 8 lists some of to ensure: accuracy, it was necessary to secure a
part in ensuring the Hospital’s effectiveness. the critical success factors identified against the representative sample of staff to participate in
■ Improvements in the quality of the operation the study. Due to the size of the directorate,
At the commencement of the study, the BSC’s four perspectives.
over time; the assessment team held workshops with
Directorate’s senior management were operational staff, thus allowing larger
Table 8: Critical success factors ■ Improvements in statutory compliance,
concerned about staff morale. This was due to numbers of staff to participate, whilst not
reduction in risk, and achievement of
the impending transfer of many of their services requiring an extension to the overall duration
Customer Internal processes controls assurance standards;
to the private sector under the Private Finance of the assessment.
Initiative. Furthermore, management were Quality Healthcare in partnership ■ Changes in the revenue cost of the
concerned about the inability of the Directorate operational estate over time; Figure 13 summarises the directorate’s process
Service partnership Operational services capability against the SPICE FM model.
to implement its plans and strategic directives at ■ Improvements in the utilisation of the estate
an operational level. Consequently, they were Timeliness Risk Management A key issue revealed by the assessment was the
over time; that is, condition appraisal in
keen to see the results of the study. Learning seeking out underused and surplus estates; disparity between levels of staff in their
Financial
Four vital services of the department were and growth and awareness of strategic directives and processes.
chosen to participate in the study: catering; Development of For example, at the centre of the NHS’s vision is
Value for money ■ Improvement in the quality of the a National Plan that sets out its future direction
operational estates; domestics; portering. Facilities environment for patients. and key objectives. Despite its importance, the
Strategic awareness and performance Staff development Achieving the financial study revealed that many staff at a supervisory
The facilities directorate has further taken
assessment and training recovery plan and practitioner level were unaware of the
several steps to encourage support for Balanced
The development of the Balanced Scorecard at Service Delivery Scorecard activities by: issues raised within the plan and, more
the Central Manchester NHS Trust Facilities Innovation importantly, the impact it should have on their
■ Making a commitment at the senior
Directorate attempted to pull together current day-to-day operations.
management level;
measures, the Patient Environment Assessment
measures and new measures drawn from the ■ Incorporating the issued identified through
NHS plan, into a Balanced Scorecard using its the BSC development programme to its
four perspectives. business plan;

30 31
SPICE FM Framework SPICE FM Framework

A further example of this problem was The directorate’s management accepted that The different service groups lacked clear and The department’s perspective
uncovered under the SPICE FM key process improvement in their monitoring systems was enforceable performance standards, resulting in “The size of our operations at the Trust makes it
risk management. A recently implemented vital in order to review their performance long standing disputes between some of the difficult for our senior management team to
controls assurance standard was fundamental in against national targets established within the service delivery teams. Ultimately, these disputes understand the problems faced by our
managing the trust’s risk and was a critical NHS Plan. Furthermore, effective monitoring were reducing the quality of service to clinical operational staff.
success factor highlighted under the internal systems would provide management with an services and consequently, the patient.
process perspective of the BSC. The standard effective tool to supervise the transition of We like the approach that SPICE FM takes in
The assessment highlighted a problem specific trying to bridge the gap between our strategy
emphasised the role that all staff play in services to the private sector under the Private
to domestic services relating to the management and day-to-day operations.
meeting this requirement. Again, the assessment Finance Initiative.
of health and safety. A high turnover of
demonstrated that many of the operational staff The uncertainty surrounding the upcoming
In addition to generic matters, the assessment operational staff in tandem with an inadequate
were unfamiliar with its requirements and their move of many of our services to the private
highlighted some service specific process issues. manager’s resource was preventing adequate
respective responsibilities. This was due to a lack sector has led to problems with our staff ’s
training provision for domestic staff.
of training or specific systems for involving staff Each of the services had its own capable morale. By involving staff in the assessment
Worryingly, existing verification systems were
at this level. processes for determining service requirements, process, the tool appears to have overcome this.
failing to highlight this specific problem.
planning delivery and managing suppliers.
In contrast, specific training programmes and Consequently, staff were performing their roles Following the assessment, we’ve appointed a
For example, a national patient charter
guidance for service management staff had led without essential training, and therefore, member of our staff to take the actions forward.
established clear guidelines for menus and
to the development of contingency plans for potentially placing themselves, and patients at We see this as the start of a continuous change
choice in the catering service. These broad
each of the service streams. risk. The directorate’s management recognised process and hope to use the SPICE FM tool
requirements were further defined in standards
this as priority for change. again in the coming months to monitor
Another issue applicable to all services related to for food hygiene, patient feeding, nutritional
performance monitoring. Although each of the requirements and purchase specifications. The directorate’s management were satisfied our progress”.
services had monitoring systems in place, such These complex standards had been translated that the findings were a true reflection of their
as patient and customer questionnaires there into clear operating systems for use by staff on a existing process capability and are now
was inconsistency and a lack of integration day-to-day basis. Furthermore staff attended addressing many of the issues raised. Table 9
between systems. Furthermore, monitoring regular training to ensure they remained aware demonstrates the relevance of the issues to the
within the Directorate was being driven by a of important issues. department’s critical success factors and
national initiative titled the ‘Patient highlights the subsequent actions.
Staff felt service co-ordination within the
Environment Assessment’. This was a periodic
facilities directorate had improved since the
review of the Hospital’s environment from a
amalgamation of hotel and estate services.
patient perspective carried out approximately
Previously, services such as catering, domestics
every six months. Consequently, short-term
and portering were managed separately from
efforts were made to monitor and improve in
estates under a ‘hotel services’ banner.
the weeks prior to an assessment. The result was
Despite this restructuring, the directorate’s co-
a fire-fighting approach that was failing to
ordination was still based on informal
address problems arising during the rest of
mechanisms, including face-to-face
the year.
communication and meetings.

32 33
SPICE FM Framework SPICE FM Framework

A further example of this problem was The directorate’s management accepted that The different service groups lacked clear and The department’s perspective
uncovered under the SPICE FM key process improvement in their monitoring systems was enforceable performance standards, resulting in “The size of our operations at the Trust makes it
risk management. A recently implemented vital in order to review their performance long standing disputes between some of the difficult for our senior management team to
controls assurance standard was fundamental in against national targets established within the service delivery teams. Ultimately, these disputes understand the problems faced by our
managing the trust’s risk and was a critical NHS Plan. Furthermore, effective monitoring were reducing the quality of service to clinical operational staff.
success factor highlighted under the internal systems would provide management with an services and consequently, the patient.
process perspective of the BSC. The standard effective tool to supervise the transition of We like the approach that SPICE FM takes in
The assessment highlighted a problem specific trying to bridge the gap between our strategy
emphasised the role that all staff play in services to the private sector under the Private
to domestic services relating to the management and day-to-day operations.
meeting this requirement. Again, the assessment Finance Initiative.
of health and safety. A high turnover of
demonstrated that many of the operational staff The uncertainty surrounding the upcoming
In addition to generic matters, the assessment operational staff in tandem with an inadequate
were unfamiliar with its requirements and their move of many of our services to the private
highlighted some service specific process issues. manager’s resource was preventing adequate
respective responsibilities. This was due to a lack sector has led to problems with our staff ’s
training provision for domestic staff.
of training or specific systems for involving staff Each of the services had its own capable morale. By involving staff in the assessment
Worryingly, existing verification systems were
at this level. processes for determining service requirements, process, the tool appears to have overcome this.
failing to highlight this specific problem.
planning delivery and managing suppliers.
In contrast, specific training programmes and Consequently, staff were performing their roles Following the assessment, we’ve appointed a
For example, a national patient charter
guidance for service management staff had led without essential training, and therefore, member of our staff to take the actions forward.
established clear guidelines for menus and
to the development of contingency plans for potentially placing themselves, and patients at We see this as the start of a continuous change
choice in the catering service. These broad
each of the service streams. risk. The directorate’s management recognised process and hope to use the SPICE FM tool
requirements were further defined in standards
this as priority for change. again in the coming months to monitor
Another issue applicable to all services related to for food hygiene, patient feeding, nutritional
performance monitoring. Although each of the requirements and purchase specifications. The directorate’s management were satisfied our progress”.
services had monitoring systems in place, such These complex standards had been translated that the findings were a true reflection of their
as patient and customer questionnaires there into clear operating systems for use by staff on a existing process capability and are now
was inconsistency and a lack of integration day-to-day basis. Furthermore staff attended addressing many of the issues raised. Table 9
between systems. Furthermore, monitoring regular training to ensure they remained aware demonstrates the relevance of the issues to the
within the Directorate was being driven by a of important issues. department’s critical success factors and
national initiative titled the ‘Patient highlights the subsequent actions.
Staff felt service co-ordination within the
Environment Assessment’. This was a periodic
facilities directorate had improved since the
review of the Hospital’s environment from a
amalgamation of hotel and estate services.
patient perspective carried out approximately
Previously, services such as catering, domestics
every six months. Consequently, short-term
and portering were managed separately from
efforts were made to monitor and improve in
estates under a ‘hotel services’ banner.
the weeks prior to an assessment. The result was
Despite this restructuring, the directorate’s co-
a fire-fighting approach that was failing to
ordination was still based on informal
address problems arising during the rest of
mechanisms, including face-to-face
the year.
communication and meetings.

32 33
SPICE FM Framework SPICE FM Framework

Figure 13: The directorate's process capability profile Study 4 – Property department Process capability findings
at a UK retail group At the time of the SPICE FM assessment, the
department was progressing with a change
Background
programme aimed at improving the
The fourth case study was the property department department’s performance. In particular,
within a major UK retail group. The group’s the changes were attempting to improve
Key Level 2 Key Processes
core business included a collection of chain reporting mechanisms to senior management.

Supplier & Contractor Mgt.


stores serving the high street and retail parks.

Service Requirement Mgt

Performance Monitoring
Satisfied The change programme represented a potential

Health and Safety Mgt.


From the group’s head office, the property

Service Co-ordination
obstacle for the SPICE FM assessment, due to
department managed the outsourcing of the inevitable collection of contradictory

Risk Management
Partially Satisfied
Service Planning
facilities management services to regional and evidence – a before and after scenario.
national contractors. However, as the assessment progressed it
Not Satisfied Strategic awareness and became clear that the department was
establishing the type of process infrastructure
performance assessment
advocated by the SPICE FM model.
In contrast to the other SPICE FM studies,
this department lacked a clear vision and Figure 14 summarises the department’s process
Commitment
Process enablers

strategic direction. This stemmed from the core capability against the SPICE FM model.
Ability business, whose strategy was also poorly The matrix highlights the mature nature of its
Activities defined. Consequently, the property department processes following the change programme.
was unsure how it could best add value to the A weakness typical of many organisations is the
Evaluation
core business’s operations and evolve its service lack of process review and evaluation. Without
Verification provision accordingly. this capability, an organisation’s processes will
Although a documented business plan existed, become stale and inappropriate to the needs of
it was ‘shelf ware’, the majority of staff unaware the business as its requirements inevitably
Table 9: Strategically aligned process improvement opportunities of its existence and even fewer of it content. change. Furthermore, innovation within service
Moreover, the plan was not a live document provision is unlikely without clear commitment
Areas identified Critical success factors and resource from senior management.
Suggested actions subject to continuous review, instead laying
for improvement addressed
dormant and becoming irrelevant as the It was clear from the SPICE FM assessment that
Develop an integrated facilities questionnaire department’s needs changed. the department had addressed this issue,
Quality
Service for distribution to customers. Interviews with staff revealed the extent of the appointing a dedicated two-person resource to
performance problem. It became apparent that the lead a continuous improvement programme.
Appoint a dedicated resource to undertake
monitoring department’s management had diverse and The change managers used documented action
Timeliness monitoring activities and drive through
sometime conflicting views on the department’s plans to identify areas for change and assign
resulting actions
direction. Naturally, this uncertainty extended responsibilities to key personnel.
Service Develop service performance standards through all levels of staff.
co-ordination Service partnership between different facilities service streams
Furthermore, there was no clear justification for
Establish a dispute resolution mechanism an extensive change programme that had been
Health and safety Staff development and training Develop an induction programme for new the focus of their attention in recent months.
management domestic staff that addresses health and safety Although a need to improve reporting had been
identified within the department, its exact
requirements and focus were unclear.

34 35
SPICE FM Framework SPICE FM Framework

Figure 13: The directorate's process capability profile Study 4 – Property department Process capability findings
at a UK retail group At the time of the SPICE FM assessment, the
department was progressing with a change
Background
programme aimed at improving the
The fourth case study was the property department department’s performance. In particular,
within a major UK retail group. The group’s the changes were attempting to improve
Key Level 2 Key Processes
core business included a collection of chain reporting mechanisms to senior management.

Supplier & Contractor Mgt.


stores serving the high street and retail parks.

Service Requirement Mgt

Performance Monitoring
Satisfied The change programme represented a potential

Health and Safety Mgt.


From the group’s head office, the property

Service Co-ordination
obstacle for the SPICE FM assessment, due to
department managed the outsourcing of the inevitable collection of contradictory

Risk Management
Partially Satisfied
Service Planning
facilities management services to regional and evidence – a before and after scenario.
national contractors. However, as the assessment progressed it
Not Satisfied Strategic awareness and became clear that the department was
establishing the type of process infrastructure
performance assessment
advocated by the SPICE FM model.
In contrast to the other SPICE FM studies,
this department lacked a clear vision and Figure 14 summarises the department’s process
Commitment
Process enablers

strategic direction. This stemmed from the core capability against the SPICE FM model.
Ability business, whose strategy was also poorly The matrix highlights the mature nature of its
Activities defined. Consequently, the property department processes following the change programme.
was unsure how it could best add value to the A weakness typical of many organisations is the
Evaluation
core business’s operations and evolve its service lack of process review and evaluation. Without
Verification provision accordingly. this capability, an organisation’s processes will
Although a documented business plan existed, become stale and inappropriate to the needs of
it was ‘shelf ware’, the majority of staff unaware the business as its requirements inevitably
Table 9: Strategically aligned process improvement opportunities of its existence and even fewer of it content. change. Furthermore, innovation within service
Moreover, the plan was not a live document provision is unlikely without clear commitment
Areas identified Critical success factors and resource from senior management.
Suggested actions subject to continuous review, instead laying
for improvement addressed
dormant and becoming irrelevant as the It was clear from the SPICE FM assessment that
Develop an integrated facilities questionnaire department’s needs changed. the department had addressed this issue,
Quality
Service for distribution to customers. Interviews with staff revealed the extent of the appointing a dedicated two-person resource to
performance problem. It became apparent that the lead a continuous improvement programme.
Appoint a dedicated resource to undertake
monitoring department’s management had diverse and The change managers used documented action
Timeliness monitoring activities and drive through
sometime conflicting views on the department’s plans to identify areas for change and assign
resulting actions
direction. Naturally, this uncertainty extended responsibilities to key personnel.
Service Develop service performance standards through all levels of staff.
co-ordination Service partnership between different facilities service streams
Furthermore, there was no clear justification for
Establish a dispute resolution mechanism an extensive change programme that had been
Health and safety Staff development and training Develop an induction programme for new the focus of their attention in recent months.
management domestic staff that addresses health and safety Although a need to improve reporting had been
identified within the department, its exact
requirements and focus were unclear.

34 35
SPICE FM Framework SPICE FM Framework

Senior management visibility into process The department also had no formal risk
performance is another important criteria when management system in place, despite having an The department’s perspective
considering process capability and is assessed obvious role in managing the core business’s “In the past six months we’ve undertaken a
under the SPICE FM process enabler risk. Again, this stemmed from the lack of a large scale change programme within the
‘verification’. The department was again viewed clear directive by the core business to carry out department. The SPICE FM assessment
as strong in this area due to significantly revised this activity. Without senior management’s confirmed that we now have the
reporting structures and systems established commitment, it is unlikely to be implemented at infrastructure in place to sustain our
under the change programme. In addition to an operational level. improvement efforts. That is very re-assuring
providing information to the department, from a management perspective. More
the reports were providing the core business
Case study outcomes
importantly, the assessment also highlighted
with an insight into its FM performance. The SPICE FM assessment emphasised the
our failure to align improvements to the core
importance of a well-resourced process
The department was also strong in many other business’s needs. We are now taking steps to
infrastructure to support and improve processes
aspects of its service delivery processes. address this within the business.”
over time. Although the department still has
For example, it had developed individual some weaknesses to address, the necessary
service level agreements to meet each chain’s infrastructure is in place to identify and correct
specific requirements, whilst using a central these issues in the future. Thus it can be said Figure 14: The department's process capability profile
telephone helpdesk to record all reactive that the department is mature in terms of its
maintenance requirements. This integrated process capability. Key Level 2 Key Processes
approach replaced a system whereby each chain

Supplier & Contractor Mgt.


within the group had its own helpdesk and FM However, it is also clear from the assessment

Service Requirement Mgt

Performance Monitoring
that the department lacks clear strategic Satisfied

Health and Safety Mgt.


managers. On reflection, this was deemed to be

Service Co-ordination
an inefficient use of resources with troughs direction. Consequently, it remains unsure

Risk Management
and peaks in resource requirements difficult whether it is truly meeting the needs of the Partially Satisfied

Service Planning
to manage. core business.

The change to an integrated helpdesk function In response to these findings, the department’s Not Satisfied
was a good example of the pro-active approach management has decided to commence the
being taken within the department to improve development of a balanced scorecard.
service quality and efficiency. This will enable it to clarify its objectives, and
ensure that its service delivery processes are Commitment

Process enablers
In addition to these and many other strengths, supporting them.
a number of weaknesses were also identified. Ability
Customer feedback mechanisms were lacking,
Activities
as well as any sort of post job review.
Consequently, the department had little visibility Evaluation
into the actual performance of contractors. Verification

36 37
SPICE FM Framework SPICE FM Framework

Senior management visibility into process The department also had no formal risk
performance is another important criteria when management system in place, despite having an The department’s perspective
considering process capability and is assessed obvious role in managing the core business’s “In the past six months we’ve undertaken a
under the SPICE FM process enabler risk. Again, this stemmed from the lack of a large scale change programme within the
‘verification’. The department was again viewed clear directive by the core business to carry out department. The SPICE FM assessment
as strong in this area due to significantly revised this activity. Without senior management’s confirmed that we now have the
reporting structures and systems established commitment, it is unlikely to be implemented at infrastructure in place to sustain our
under the change programme. In addition to an operational level. improvement efforts. That is very re-assuring
providing information to the department, from a management perspective. More
the reports were providing the core business
Case study outcomes
importantly, the assessment also highlighted
with an insight into its FM performance. The SPICE FM assessment emphasised the
our failure to align improvements to the core
importance of a well-resourced process
The department was also strong in many other business’s needs. We are now taking steps to
infrastructure to support and improve processes
aspects of its service delivery processes. address this within the business.”
over time. Although the department still has
For example, it had developed individual some weaknesses to address, the necessary
service level agreements to meet each chain’s infrastructure is in place to identify and correct
specific requirements, whilst using a central these issues in the future. Thus it can be said Figure 14: The department's process capability profile
telephone helpdesk to record all reactive that the department is mature in terms of its
maintenance requirements. This integrated process capability. Key Level 2 Key Processes
approach replaced a system whereby each chain

Supplier & Contractor Mgt.


within the group had its own helpdesk and FM However, it is also clear from the assessment

Service Requirement Mgt

Performance Monitoring
that the department lacks clear strategic Satisfied

Health and Safety Mgt.


managers. On reflection, this was deemed to be

Service Co-ordination
an inefficient use of resources with troughs direction. Consequently, it remains unsure

Risk Management
and peaks in resource requirements difficult whether it is truly meeting the needs of the Partially Satisfied

Service Planning
to manage. core business.

The change to an integrated helpdesk function In response to these findings, the department’s Not Satisfied
was a good example of the pro-active approach management has decided to commence the
being taken within the department to improve development of a balanced scorecard.
service quality and efficiency. This will enable it to clarify its objectives, and
ensure that its service delivery processes are Commitment

Process enablers
In addition to these and many other strengths, supporting them.
a number of weaknesses were also identified. Ability
Customer feedback mechanisms were lacking,
Activities
as well as any sort of post job review.
Consequently, the department had little visibility Evaluation
into the actual performance of contractors. Verification

36 37
SPICE FM Framework SPICE FM Framework

Relationship with EFQM Model

SPICE FM has been developed to address the The fundamental concepts of excellence Benefits of using the SPICE FM The use of SPICE FM within organisations
need for process improvement in Facilities The EFQM model is a non-prescriptive framework to achieve the as an enabler in achieving business excellence
Management departments as a means of framework that recognises there are many can help overcome this deficiency in the
improving services. At present, there is no
objectives of EFQM model EFQM model.
approaches to achieving sustainable excellence.
methodological mechanism to assess processes The EFQM model is now widely used in many
The model is based on the premise that Further, the EFQM model is an audit tool of
and prioritise process improvements. organisations. However, there is a surprising
customer satisfaction, people (employee) what is already happening; i.e., it does not
lack of literature offering a critical perspective
The European Foundation for Quality satisfaction and impact on society are achieved indicate best or preferred practice in an
on the EFQM model, considering that there are
Management (EFQM) seeks to recognise the thanks to leadership driving policy and strategy, organisational context. In contrast, SPICE FM
various approaches to applying the model.
dynamic environment in which all organisations people management, resources and processes. can be translated through the workforce by
These emphasise various advantages including
work. It undertook major research to develop This will lead ultimately to excellence in simple and easily understood approaches,
improved measurement and benchmarking.
the ‘EFQM excellence model’ which is a non- business results (Shergold and Reed, 1996). which helps to overcome the complications and
prescriptive framework that recognises that The model enables whole organisations, The EFQM model does not formulate strategy, bureaucratic aspects of the EFQM model.
there are many approaches to achieving component parts, or individual services within nor does it properly evaluate strategy. Instead,
it evaluates the process of forming strategy. Figure 15 summarises how SPICE FM can be
sustainable excellence. organisation to undertake self-assessment.
The danger in the EQFM’s limited involvement used to achieve the business excellence
Within a similar time frame, the UK In essence, the EFQM model subscribes to identified by the EFQM model:
in the strategic process is that the model could
government began to step up its drive towards Deming’s continuous improvement philosophy
be seen as simply a strategic tool rather than
ensuring that the ‘new NHS’ had quality at its of “plan-do-check-act”. The process is driven by
being intrinsically linked to strategy.
heart (Jackson, 1999). NHS managers and other self-assessment, which Porter and Tanner (1996)
stakeholders were expected to determine a maintain is not only a means for measuring
cohesive way forward for delivering the continuous improvement, but also an excellent Figure 15: The relationship between SPICE FM and the EFQM model
government’s agenda. The government opportunity to integrate total quality
explicitly “commended” the use of the EFQM management into organisations’ Learning and Customer
excellence model (NHS Executive, 1999). normal operations. Growth Perspective Perspective

There is therefore a need to explore the People


People
relationship between SPICE FM and the EFQM Results
model as a mechanism to improve
organisational efficiency. It is a significant
Policy Key
question, as the EFQM model has been Leadership Processes Customer Performance
and Results
proposed as the framework to be used within Strategy Results
the NHS for self-assessment audits of
organisational capability or ‘fitness’, and to
identify areas for improvement. Partnerships
Society
and
Results
Resources
Process efficiency Financial
(SPICE research is very effective in Perspective
achieving these areas)

38 39
SPICE FM Framework SPICE FM Framework

Relationship with EFQM Model

SPICE FM has been developed to address the The fundamental concepts of excellence Benefits of using the SPICE FM The use of SPICE FM within organisations
need for process improvement in Facilities The EFQM model is a non-prescriptive framework to achieve the as an enabler in achieving business excellence
Management departments as a means of framework that recognises there are many can help overcome this deficiency in the
improving services. At present, there is no
objectives of EFQM model EFQM model.
approaches to achieving sustainable excellence.
methodological mechanism to assess processes The EFQM model is now widely used in many
The model is based on the premise that Further, the EFQM model is an audit tool of
and prioritise process improvements. organisations. However, there is a surprising
customer satisfaction, people (employee) what is already happening; i.e., it does not
lack of literature offering a critical perspective
The European Foundation for Quality satisfaction and impact on society are achieved indicate best or preferred practice in an
on the EFQM model, considering that there are
Management (EFQM) seeks to recognise the thanks to leadership driving policy and strategy, organisational context. In contrast, SPICE FM
various approaches to applying the model.
dynamic environment in which all organisations people management, resources and processes. can be translated through the workforce by
These emphasise various advantages including
work. It undertook major research to develop This will lead ultimately to excellence in simple and easily understood approaches,
improved measurement and benchmarking.
the ‘EFQM excellence model’ which is a non- business results (Shergold and Reed, 1996). which helps to overcome the complications and
prescriptive framework that recognises that The model enables whole organisations, The EFQM model does not formulate strategy, bureaucratic aspects of the EFQM model.
there are many approaches to achieving component parts, or individual services within nor does it properly evaluate strategy. Instead,
it evaluates the process of forming strategy. Figure 15 summarises how SPICE FM can be
sustainable excellence. organisation to undertake self-assessment.
The danger in the EQFM’s limited involvement used to achieve the business excellence
Within a similar time frame, the UK In essence, the EFQM model subscribes to identified by the EFQM model:
in the strategic process is that the model could
government began to step up its drive towards Deming’s continuous improvement philosophy
be seen as simply a strategic tool rather than
ensuring that the ‘new NHS’ had quality at its of “plan-do-check-act”. The process is driven by
being intrinsically linked to strategy.
heart (Jackson, 1999). NHS managers and other self-assessment, which Porter and Tanner (1996)
stakeholders were expected to determine a maintain is not only a means for measuring
cohesive way forward for delivering the continuous improvement, but also an excellent Figure 15: The relationship between SPICE FM and the EFQM model
government’s agenda. The government opportunity to integrate total quality
explicitly “commended” the use of the EFQM management into organisations’ Learning and Customer
excellence model (NHS Executive, 1999). normal operations. Growth Perspective Perspective

There is therefore a need to explore the People


People
relationship between SPICE FM and the EFQM Results
model as a mechanism to improve
organisational efficiency. It is a significant
Policy Key
question, as the EFQM model has been Leadership Processes Customer Performance
and Results
proposed as the framework to be used within Strategy Results
the NHS for self-assessment audits of
organisational capability or ‘fitness’, and to
identify areas for improvement. Partnerships
Society
and
Results
Resources
Process efficiency Financial
(SPICE research is very effective in Perspective
achieving these areas)

38 39
SPICE FM Framework SPICE FM Framework

Summary Appendix A – Extract from the SPICE


FM Process Maturity Questionnaire
There is growing recognition of the need to This section contains an extract from the SPICE
raise the awareness of the contributory role of FM process maturity questionnaire, an
operational facilities at senior levels of assessment tool that can be used to examine an
organisations. It is important for facility organisation against the SPICE FM process
managers to have an influence on strategic maturity model. A cross-section of staff from the
decisions and to demonstrate the contribution organisation completes the questionnaire,
that facilities make to the achievement of an providing a balanced review of the
organisation’s objectives and business targets. organisation’s current performance.
The responses highlight areas for further
SPICE FM is a step by step organisational
investigation through semi-structured interviews
development framework that provides
and a document review.
organisations with the capability to implement
their vision by aligning the continuous The following extract from the questionnaire
improvement of FM services with the needs of refers to the level 2 key process ‘Service
the core business. The framework combines a Requirement Management’.
top down strategic approach with a middle out
process focus.
SPICE FM has been used in real facilities
organisations to provide a unique,
sector specific methodology for sustainable
process improvement.

40 41
SPICE FM Framework SPICE FM Framework

Summary Appendix A – Extract from the SPICE


FM Process Maturity Questionnaire
There is growing recognition of the need to This section contains an extract from the SPICE
raise the awareness of the contributory role of FM process maturity questionnaire, an
operational facilities at senior levels of assessment tool that can be used to examine an
organisations. It is important for facility organisation against the SPICE FM process
managers to have an influence on strategic maturity model. A cross-section of staff from the
decisions and to demonstrate the contribution organisation completes the questionnaire,
that facilities make to the achievement of an providing a balanced review of the
organisation’s objectives and business targets. organisation’s current performance.
The responses highlight areas for further
SPICE FM is a step by step organisational
investigation through semi-structured interviews
development framework that provides
and a document review.
organisations with the capability to implement
their vision by aligning the continuous The following extract from the questionnaire
improvement of FM services with the needs of refers to the level 2 key process ‘Service
the core business. The framework combines a Requirement Management’.
top down strategic approach with a middle out
process focus.
SPICE FM has been used in real facilities
organisations to provide a unique,
sector specific methodology for sustainable
process improvement.

40 41
SPICE FM Framework SPICE FM Framework

Glossary

Service Requirement Management - Service requirement management identifies organisational Ability One of five ‘process enablers’. Ability to perform considers whether
and user needs. Documented service level agreements and performance standards are developed adequate resourcing, appropriate organisational structure and
and continuously reviewed to remain consistent with customer requirements. Service level training are provided to carry out a process.
agreements and performance standards are communicated to all staff involved in the delivery
of the service. Activities One of five ‘process enablers’. Activities to perform considers whether
plans and procedures are developed for the process and whether the
1. How important do you consider ‘service requirement management’ to be to performance is monitored.
your organisation. (Rate 1-5, 1 = not important, 5 = very important)
Balanced Scorecard A strategic management system that measures performance and
develops strategies by analysing results across a range of activities.

Does not
Disagree

Disagree
Strongly

Strongly
Commitment One of five ‘process enablers’. Commitment to perform considers
Agree

Agree

know
Don’t

apply
whether the organisation will ensure that the process is established
and will endure.
2. A policy defining standards for managing service
requirements is communicated to staff. Evaluation One of five ‘process enablers’. Evaluation considers whether processes
Comments: are evaluated on a periodic basis.
3. Procedures for managing service requirements
are clearly defined and communicated to staff. Key Process Area Related activities that when performed collectively achieve a set of
Comments: common goals considered important for establishing process maturity.
The key process areas are the principal building blocks that can help
4. Service requirements and performance standards to determine the process capability of an organisation. Each maturity
are documented and communicated to staff. level is comprised of key process areas.
Comments:
Performance The use of performance measurement information to effect positive
5. Service level agreements and performance
Management change in organisational culture, systems and processes.
standards are subject to continuous review.
Comments: Performance A process of assessing progress towards achieving
6. Adequate resources and training are provided to Measurement predetermined goals.
manage service requirements.
Comments: Process The means by which, procedures, methods, equipment and tools are
integrated to produce a desired result.
7. Staff reviews and measures the effectiveness of
the activities for managing service requirements. Five preconditions that must exist in the project to implement the
Process Enabler
Comments: construction process competently.
8. Activities for managing service requirements are One of five ‘process enablers’. Verifying implementation considers
subject to QA or other verification. Verification whether compliance with procedures is determined.
Comments:

42 43
SPICE FM Framework SPICE FM Framework

Glossary

Service Requirement Management - Service requirement management identifies organisational Ability One of five ‘process enablers’. Ability to perform considers whether
and user needs. Documented service level agreements and performance standards are developed adequate resourcing, appropriate organisational structure and
and continuously reviewed to remain consistent with customer requirements. Service level training are provided to carry out a process.
agreements and performance standards are communicated to all staff involved in the delivery
of the service. Activities One of five ‘process enablers’. Activities to perform considers whether
plans and procedures are developed for the process and whether the
1. How important do you consider ‘service requirement management’ to be to performance is monitored.
your organisation. (Rate 1-5, 1 = not important, 5 = very important)
Balanced Scorecard A strategic management system that measures performance and
develops strategies by analysing results across a range of activities.

Does not
Disagree

Disagree
Strongly

Strongly
Commitment One of five ‘process enablers’. Commitment to perform considers
Agree

Agree

know
Don’t

apply
whether the organisation will ensure that the process is established
and will endure.
2. A policy defining standards for managing service
requirements is communicated to staff. Evaluation One of five ‘process enablers’. Evaluation considers whether processes
Comments: are evaluated on a periodic basis.
3. Procedures for managing service requirements
are clearly defined and communicated to staff. Key Process Area Related activities that when performed collectively achieve a set of
Comments: common goals considered important for establishing process maturity.
The key process areas are the principal building blocks that can help
4. Service requirements and performance standards to determine the process capability of an organisation. Each maturity
are documented and communicated to staff. level is comprised of key process areas.
Comments:
Performance The use of performance measurement information to effect positive
5. Service level agreements and performance
Management change in organisational culture, systems and processes.
standards are subject to continuous review.
Comments: Performance A process of assessing progress towards achieving
6. Adequate resources and training are provided to Measurement predetermined goals.
manage service requirements.
Comments: Process The means by which, procedures, methods, equipment and tools are
integrated to produce a desired result.
7. Staff reviews and measures the effectiveness of
the activities for managing service requirements. Five preconditions that must exist in the project to implement the
Process Enabler
Comments: construction process competently.
8. Activities for managing service requirements are One of five ‘process enablers’. Verifying implementation considers
subject to QA or other verification. Verification whether compliance with procedures is determined.
Comments:

42 43
SPICE FM Framework SPICE FM Framework

References and Bibliography

Alexander, K. (1996) ‘Value Management’. In Alexander, K. (Ed). (1996). Facilities Management -


Theory and Practice. New York: E & FN Spon.
BIFM (1999) ‘Survey of Facilities Manager’s Responsibilities’. BIFM Members Survey.
British Institute of Facilities Management. September.
Davenport (1992) ‘Process Innovation: Re-engineering Work Through Information Technology’.
Harvard Business School Press.
Facilities management solutions (2001) http:\\www.fm.net accessed 29th March 2001
FBA – Professionals in Facilities Management (1999) ‘Micro-scan FM – briefing document’. London.
Fortune Magazine, November 1997.
Jackson, S. (1999) ‘Achieving a culture of continuous improvement by adopting the principles of
self-assessment and business excellence’. International Journal of Health Care Quality Assurance,
Vol.12, No.2, pp. 56-64.
Kaplan, R.S. & Norton, D.P. (1996) ‘The Balanced Score Card’. Massachusetts, Boston, Harvard Bridgewater Building
Business School Press. University of Salford
Salford M7 9NU
Kaplan, R. & Norton, D. (1996) ‘The Balanced Scorecard: Translating strategy into action’.
United Kingdom
Harvard Business School press, Boston.
NHS Executive (1999) ‘Clinical Governance: In the new NHS’. Health Service Circular 1999/065, 16th March. Tel: + 44 (0)161 295 5317
Nutt (1999) ‘Linking FM practice and research’. Facilities, Vol. 17 No.1/2, pp111-117. Fax: + 44 (0)161 295 5011
E-Mail: spicefm@sun.scpm.salford.ac.uk
Ould (1995) ‘Business Processes: Modelling and Analysis for Re-engineering and Improvement’. Wiley. Web: http://www.scpm.salford.ac.uk/spicefm
Paulk, M., Weber, C., Curtis, B. and Chrissis, M. (1994) ‘The Capability Maturity Model: Guidelines Published by Construct IT Centre of Excellence
for Improving the Software Process’. Addison-Wesley, Massachusett. Copyright © The University of Salford 2001

Porter, L & Tanner, S.J (1996) ‘Assessing Business Excellence: A Guide to Self-assessment”. Designed by The Design Team, University of Salford, 0161 295 2630

Butterworth - Heinman. All rights reserved. No part of this publication may be reproduced, stored in a retrieval system or transmitted in any form or by any means electronic,
mechanical, photocopying, recording or otherwise without the prior written permission of the copyright holder.

Sarshar, M., Haigh, R., Finnemore, M., Aouad, G., Barrett, D., Baldry, D. and Sexton, M., (2000) British Library Cataloguing-in-Publication Data

‘SPICE: A business process diagnostics tool for construction projects’. Engineering, Construction A CIP catalogue record for this book can be obtained from the British Library

and Architectural Management, Vol 7, No 3, pp241-250. ISBN 1-900491-51-6

Shergold, K. & Reed, D.M. (1996) ‘Striving for excellence: how self-assessment using the business
excellence model can result in step improvements in all areas of business activities’. The TQM
Magazine, Vol. 8, No.6, pp. 48-52.
Skinner, W. (1989) ‘Manufacturing – missing link in corporate strategy’. Harvard Business Review,
May-June, pp.136-145
Then, D.S. (1999) ‘An integrated resource management view of facilities management’. Facilities,
Vol.17, No. 12/13, pp.462-469.
Zahran, S. (1998) ‘Software process improvement’. Addison Wesley.

44 45
SPICE FM Framework SPICE FM Framework

References and Bibliography

Alexander, K. (1996) ‘Value Management’. In Alexander, K. (Ed). (1996). Facilities Management -


Theory and Practice. New York: E & FN Spon.
BIFM (1999) ‘Survey of Facilities Manager’s Responsibilities’. BIFM Members Survey.
British Institute of Facilities Management. September.
Davenport (1992) ‘Process Innovation: Re-engineering Work Through Information Technology’.
Harvard Business School Press.
Facilities management solutions (2001) http:\\www.fm.net accessed 29th March 2001
FBA – Professionals in Facilities Management (1999) ‘Micro-scan FM – briefing document’. London.
Fortune Magazine, November 1997.
Jackson, S. (1999) ‘Achieving a culture of continuous improvement by adopting the principles of
self-assessment and business excellence’. International Journal of Health Care Quality Assurance,
Vol.12, No.2, pp. 56-64.
Kaplan, R.S. & Norton, D.P. (1996) ‘The Balanced Score Card’. Massachusetts, Boston, Harvard Bridgewater Building
Business School Press. University of Salford
Salford M7 9NU
Kaplan, R. & Norton, D. (1996) ‘The Balanced Scorecard: Translating strategy into action’.
United Kingdom
Harvard Business School press, Boston.
NHS Executive (1999) ‘Clinical Governance: In the new NHS’. Health Service Circular 1999/065, 16th March. Tel: + 44 (0)161 295 5317
Nutt (1999) ‘Linking FM practice and research’. Facilities, Vol. 17 No.1/2, pp111-117. Fax: + 44 (0)161 295 5011
E-Mail: spicefm@sun.scpm.salford.ac.uk
Ould (1995) ‘Business Processes: Modelling and Analysis for Re-engineering and Improvement’. Wiley. Web: http://www.scpm.salford.ac.uk/spicefm
Paulk, M., Weber, C., Curtis, B. and Chrissis, M. (1994) ‘The Capability Maturity Model: Guidelines Published by Construct IT Centre of Excellence
for Improving the Software Process’. Addison-Wesley, Massachusett. Copyright © The University of Salford 2001

Porter, L & Tanner, S.J (1996) ‘Assessing Business Excellence: A Guide to Self-assessment”. Designed by The Design Team, University of Salford, 0161 295 2630

Butterworth - Heinman. All rights reserved. No part of this publication may be reproduced, stored in a retrieval system or transmitted in any form or by any means electronic,
mechanical, photocopying, recording or otherwise without the prior written permission of the copyright holder.

Sarshar, M., Haigh, R., Finnemore, M., Aouad, G., Barrett, D., Baldry, D. and Sexton, M., (2000) British Library Cataloguing-in-Publication Data

‘SPICE: A business process diagnostics tool for construction projects’. Engineering, Construction A CIP catalogue record for this book can be obtained from the British Library

and Architectural Management, Vol 7, No 3, pp241-250. ISBN 1-900491-51-6

Shergold, K. & Reed, D.M. (1996) ‘Striving for excellence: how self-assessment using the business
excellence model can result in step improvements in all areas of business activities’. The TQM
Magazine, Vol. 8, No.6, pp. 48-52.
Skinner, W. (1989) ‘Manufacturing – missing link in corporate strategy’. Harvard Business Review,
May-June, pp.136-145
Then, D.S. (1999) ‘An integrated resource management view of facilities management’. Facilities,
Vol.17, No. 12/13, pp.462-469.
Zahran, S. (1998) ‘Software process improvement’. Addison Wesley.

44 45
The Centre of Excellence for Construct IT has been set up to
co-ordinate and promote research in IT in Construction in the UK
to improve competitive performance of the UK construction industry
The administrative office of the Centre is based at Bridgewater Building,
University of Salford, Salford, M7 9NU, UK.
Organisations who have expertise in their use of IT are invited to approach the Centre.
Please contact the administrators if you wish to become a member.

SPICE FM
A step by step organisational development framework
for facilities management

£ 30.00

You might also like