You are on page 1of 2
- S chinest Apegeut as .as1 External Correspondence Ae Boy Saudi Electricity company Saudi Electricity Projects Development Co. Projects Business Unit EHV Projects Department-COA ‘Yel. # 011 807 8130, Fax # 011 807 8026 TOP URG 18-Safety-25/12021001 March 18, 2018G Attention: All EHVPD-COA. Contractors. Subject: Incident Recall (Fatality — Vehicle Collision) Greetings! With the reference to the above-mentioned subject, the fatality accident occurred on Jan. 2018 at one of the SEC-EOA Projects Sites. The deceased employee working on the road (re-constructed of pedestrian crossing bump) when one of the vehicles hit him down We urge you strictly t follow the SEC-5 Star Safety & Health Management System and all the nessary safely precautions whenever you work on/alongside roads. You will find a related recommendations & documents (attached) t be followed in case of similar activity & environment. This is for your information and necessary action Best Regards, D Engr. Ali A. AFRakban Manager, Sl Extra High Voltage Projects Department-COA Auachment: Recommendations & 2 docornen's cc Group Leaders File: $03.2 THIS DOCUMENT IS FOR INTERNAL USE ONLY Safety Alert - Incident Recall EHVPD - COA ‘8March 2018 Fatal Incident (Vehicle Collision) Recommendations to be strictly followed whenever you have any activity ordelongside the roads: Y The Contractor must prepare a Risk Assessment (RA) and a Traffic Risk Control Plan which should be sent to the relevant Project Management for review and approval before commencing any work on the roads. Y The importance of applying the detoured zone and restricted! barricaded area before adequate distance from the workplace properly and implementation of appropriate road signs and barriers is erucial. ¥ The importance of adopting the Uniform Guidelines of the “Manual of Traffic Control Measures in the Work Areas ", issued by the Central Coordination Committee, (Atached copy) ¥- The contractor shal train his employees on the system of work permits and issuing cards (Issuer- Receiver) aczording to the instructions of the contractor's work permit system, ¥ Sufficient quantity of the Flagmen (with RED & GREEN flags) should be utilized at day time, and illuminated hard barricades with beacons must be used at the night period. ¥ Providing permissions from the local relevant authorities For those who have an activity on/ alongside road must comply with the "Manual of Traffic Control Measures in the Work Areas” and the “Excavation works Guidelines Manual” (attached). Photo#2 Photo# Photos from the incident scene CF supstanpaas on \ Steerer

You might also like