External Correspondence Ae Boy Saudi Electricity company
Saudi Electricity Projects Development Co.
Projects Business Unit
EHV Projects Department-COA
‘Yel. # 011 807 8130, Fax # 011 807 8026
TOP URG
18-Safety-25/12021001
March 18, 2018G
Attention: All EHVPD-COA. Contractors.
Subject: Incident Recall (Fatality — Vehicle Collision)
Greetings!
With the reference to the above-mentioned subject, the fatality accident occurred on Jan. 2018 at
one of the SEC-EOA Projects Sites. The deceased employee working on the road (re-constructed of
pedestrian crossing bump) when one of the vehicles hit him down
We urge you strictly t follow the SEC-5 Star Safety & Health Management System and all the
nessary safely precautions whenever you work on/alongside roads. You will find a related
recommendations & documents (attached) t be followed in case of similar activity &
environment.
This is for your information and necessary action
Best Regards,
D Engr. Ali A. AFRakban
Manager, Sl
Extra High Voltage Projects Department-COA
Auachment: Recommendations & 2 docornen's
cc Group Leaders
File: $03.2THIS DOCUMENT IS FOR INTERNAL USE ONLY
Safety Alert - Incident Recall
EHVPD - COA
‘8March 2018
Fatal Incident (Vehicle Collision)
Recommendations to be strictly followed whenever you have any activity ordelongside the roads:
Y The Contractor must prepare a Risk Assessment (RA) and a Traffic Risk Control Plan which
should be sent to the relevant Project Management for review and approval before
commencing any work on the roads.
Y The importance of applying the detoured zone and restricted! barricaded area before adequate
distance from the workplace properly and implementation of appropriate road signs and
barriers is erucial.
¥ The importance of adopting the Uniform Guidelines of the “Manual of Traffic Control
Measures in the Work Areas ", issued by the Central Coordination Committee, (Atached
copy)
¥- The contractor shal train his employees on the system of work permits and issuing cards
(Issuer- Receiver) aczording to the instructions of the contractor's work permit system,
¥ Sufficient quantity of the Flagmen (with RED & GREEN flags) should be utilized at day
time, and illuminated hard barricades with beacons must be used at the night period.
¥ Providing permissions from the local relevant authorities
For those who have an activity on/ alongside road must comply with the "Manual of Traffic
Control Measures in the Work Areas” and the “Excavation works Guidelines Manual”
(attached).