You are on page 1of 1

Petroleum 

Products Pipelines Under Construction
Capacity  Length in  Authorization  Target Completition 
S. No. Name of Pipeline Operating Entity
(MMT) Kilometers by PNGRB Date
A) Pipelines Transporting Petroleum Products Other than LPG
1 Irugur‐Devangonthi  BPCL 3.52 320 26.02.2014 26.2.2017
2 Rewari‐Kanpur  HPCL 7.98 443 20.11.2012 19.11.2015
3 Kota‐Jobner  BPCL 2.75 210 05.12.2012 4.12.2015
Sub‐Total 14.25 973
B) Pipelines Transporting LPG
4 Uran‐Chakan‐Shikrapur  HPCL 1.00 165 01.11.2012 31.10.2015
5 Kochi‐Coimbatore‐Erode‐Salem  BPCL Led Consortium 1.53 458 26.02.2014 25.2.2017

6 Mangalore‐Hassan‐Mysore‐Sollur  HPCL 3.01 397 20.11.2012 19.11.2015


Sub‐Total 5.54 1020
Grand Total 19.79 1993
Note: The information is up to date as on 31.8.2015