You are on page 1of 3
GEM Ref. No.: P20030-CPO1-ST-RFA-160-21 REQUEST FOR APPROVAL (RFA) Coniract Package _[ CSW z Contractor __| BETONBAWPHIINING He HEE For Submission To | ASYAREY te Name, Date and ae ae Time: Ge way 2021) SMEAR ones p.PERLAS e 4 Pm CONTRACTORICM, CMIDESIGNER, Description for Approval: PARTYWALL_REMOVAL@ELEVATOR SHAFT Due date: 19 March 24 During Technical Mesting on 26 Feb 2020 to Remove the Party-wall of Elevator Shaft at GL-B-C,9-10 for Mechanical Pressurization can serve the entire shaft as per other trade (MEP). es | No | Wy Goat nplcaons? ooo Wit Tine pkestone? —[ ET Dade ‘Tha lloning ker are Needy sbmites tor reew. We aso cory tat he tam subite ae in Ul compliance wih he Conta documents. (Ns: Any devaters are o be subritag separately under a Request or Deviation) ‘Attachment: Catalogues ‘Manufacturers Ltoreture ‘Teateutations ZDrawings Test Procedures ‘Other (Pis. Speciy) Company Resporsible Person Dats Received Dae Released PMG (GM/PM) Engr. Salvador Gonzaga | ‘GlenuDesigner/Conautont ! ‘Approver's Comments on Submittal: Remarks (Pe Chast Approved ‘Approved with Comment, Resubmit by ‘Approved with Comment, Resubmission not required Reuben Rejected ‘NB. 1) Asprovl or eviow hersunder shal nat be carted a rlore the Contacor of his rpanslitioe and Habit undor ta Cantast ‘Rdaitonal Commnent Ifyou consider that a change in the Goniract Amount or Contract Time Is required, nolily the Project Management Group within 48 hours from your receipt of the above response and prior to your proceeding with affected work. Submit a Change Order Proposal to the Project Management Group within seven (7) days from your notification. (ClientDesigney) Project Management = Contractor Name and Signature Name and Signature Name and Signature contactor ones =O PM nner cu O_Devcper oo F-OPS.008-1 EFF: 01/22/24 Page 1 of t ‘SHEARWALL (SEE SCHED) LOWER FOUNDATION LEVEL _ 7t\ ELEVATOR PIT DETAILED PLAN 5 8 CTION S TLEVATOR LONGITUDINAL RESDENTIAL

You might also like