GEM
Ref. No.: P20030-CPO1-ST-RFA-160-21
REQUEST FOR APPROVAL (RFA)
Coniract Package _[ CSW z
Contractor __| BETONBAWPHIINING He HEE
For Submission To | ASYAREY te
Name, Date and ae ae
Time: Ge way 2021) SMEAR ones p.PERLAS e
4 Pm CONTRACTORICM, CMIDESIGNER,
Description for Approval: PARTYWALL_REMOVAL@ELEVATOR SHAFT Due date: 19 March 24
During Technical Mesting on 26 Feb 2020 to Remove the Party-wall of Elevator Shaft at GL-B-C,9-10
for Mechanical Pressurization can serve the entire shaft as per other trade (MEP).
es | No |
Wy Goat nplcaons? ooo
Wit Tine pkestone? —[ ET
Dade
‘Tha lloning ker are Needy sbmites tor reew. We aso cory tat he tam subite ae in Ul compliance wih he Conta documents.
(Ns: Any devaters are o be subritag separately under a Request or Deviation)
‘Attachment:
Catalogues
‘Manufacturers Ltoreture
‘Teateutations
ZDrawings
Test Procedures
‘Other (Pis. Speciy)
Company Resporsible Person Dats Received Dae Released
PMG (GM/PM) Engr. Salvador Gonzaga |
‘GlenuDesigner/Conautont !
‘Approver's Comments on Submittal: Remarks (Pe Chast
Approved
‘Approved with Comment, Resubmit by
‘Approved with Comment, Resubmission not required
Reuben
Rejected
‘NB. 1) Asprovl or eviow hersunder shal nat be carted a rlore the Contacor of his rpanslitioe and Habit undor ta Cantast
‘Rdaitonal Commnent
Ifyou consider that a change in the Goniract Amount or Contract Time Is required, nolily the Project Management
Group within 48 hours from your receipt of the above response and prior to your proceeding with affected work.
Submit a Change Order Proposal to the Project Management Group within seven (7) days from your notification.
(ClientDesigney) Project Management = Contractor
Name and Signature Name and Signature Name and Signature
contactor
ones =O
PM nner
cu O_Devcper
oo
F-OPS.008-1 EFF: 01/22/24 Page 1 of t‘SHEARWALL (SEE SCHED)
LOWER FOUNDATION LEVEL _
7t\ ELEVATOR PIT DETAILED PLAN5
8
CTION
S
TLEVATOR
LONGITUDINAL
RESDENTIAL