OEE Calculator (3-Shift Per Machine)

OEE = 89.222%
Availability(A) Performance(P) Quality(Q)
A= 0.926 P= 1.000 Q=

Run Time= 1250 Ideal Cycle Time= 1.5 Good Quantity =

Planned Production 1350 Total Production 833


Time= Quantity= Rejection Quantity=
Stop Time/Down 100
Time=

Shift Length= 1440


Breaks= 90

UOM of Time is Minute


Enter the Values in only Yellow Box.
Quality(Q)
0.964

803

30