AGRICULTURE & COOPERATIVES DEPARTMENT

Government of Balochistan
Rs. (in Million)

S. PSDP Estt: Alloc: Approval Status Financial Status


Title of Scheme Remarks
No. No. Cost 2020-21 DSC PDWP Auth: Reles
1 17 Command Area Dev: 925.00 150.00 27.07.20 - - - a) The Project came under discussion in the
Kachhi Canal Phase-I, DSC meeting held on 27.7.2020.
Part B b) The project is aimed at Command Area
Development of 30,000 acres from
Distributary No. 16 to 23. Presently, the
Kachhi Canal is complete up to Distributary
No. 15. The WAPDA is likely to start
construction work of the Canal from D-16
onward this year.
c) The DGA(OFWM) will approach the WAPDA
authorities to get benchmarks of D-16 to D-
23 and will submit a PC-II for hiring of
Consultant for Design & Survey of Command
area.
2 18 Promotion of Tunnel 500.00 150.00 27.07.20 - - - a) The Project came under discussion in the
farming in Balochistan DSC meeting held on 27.7.2020. Under the
scheme 663 Green tunnels will be installed
throughout Balochistan on 90% subsidized
rates.
b) The forum recommended the scheme for
consideration by the PDWP.
c) The PC-I is submitted in the P&DD.
d) PDWP meeting is waited.
3 24 Date Plant in Punjgur 400.00 100.00 27.07.20 - - - a) The Project came under discussion in the
DSC meeting held on 27.7.2020.
b) The forum recommended the scheme for
consideration by the PDWP.
c) The PC-I is submitted in the P&DD.
S. PSDP Estt: Alloc: Approval Status Financial Status
Title of Scheme Remarks
No. No. Cost 2020-21 d) PDWP meeting is waited.
4 30 Seed Registration / 200.00 60.00 27.07.20 - - - a) The Project came under discussion in the
Certification Program DSC meeting held on 27.7.2020.
b) The forum recommended the scheme for
consideration by the PDWP.
c) The PC-I is submitted in the P&DD.
d) PDWP meeting is waited.
5 31 Strengthening of 415.00 100.00 27.07.20 - - - a) The project is aimed at strengthening of 6
existing and existing and establishment of 7 new labs in
establishment of New Balochistan Agriculture College Quetta
laboratories through provision of Lab equipment and
machinery, glassware etc. for educational
purpose.
b) The physical infrastructure of Labs is
already available.
c) The Project came under discussion in the
DSC meeting held on 27.7.2020.
d) The forum recommended the scheme for
consideration by the PDWP.
e) The PC-I is submitted in the P&DD.
f) PDWP meeting is scheduled on 1.09.2020
6 37 Construction of Cold 300.00 50.00 27.07.20 - - - a) The Project came under discussion in the
Storage for Fruit at DSC meeting held on 27.7.2020.
Killa Saifullah & Kalat. b) The forum recommended the scheme for
consideration by the PDWP.
c) The PC-I is submitted in the P&DD.
d) PDWP meeting is waited.