S. PSDP Estt: Alloc: Approval Status Financial Status
Title of Scheme Remarks No. No. Cost 2020-21 DSC PDWP Auth: Reles 1 17 Command Area Dev: 925.00 150.00 27.07.20 - - - a) The Project came under discussion in the Kachhi Canal Phase-I, DSC meeting held on 27.7.2020. Part B b) The project is aimed at Command Area Development of 30,000 acres from Distributary No. 16 to 23. Presently, the Kachhi Canal is complete up to Distributary No. 15. The WAPDA is likely to start construction work of the Canal from D-16 onward this year. c) The DGA(OFWM) will approach the WAPDA authorities to get benchmarks of D-16 to D- 23 and will submit a PC-II for hiring of Consultant for Design & Survey of Command area. 2 18 Promotion of Tunnel 500.00 150.00 27.07.20 - - - a) The Project came under discussion in the farming in Balochistan DSC meeting held on 27.7.2020. Under the scheme 663 Green tunnels will be installed throughout Balochistan on 90% subsidized rates. b) The forum recommended the scheme for consideration by the PDWP. c) The PC-I is submitted in the P&DD. d) PDWP meeting is waited. 3 24 Date Plant in Punjgur 400.00 100.00 27.07.20 - - - a) The Project came under discussion in the DSC meeting held on 27.7.2020. b) The forum recommended the scheme for consideration by the PDWP. c) The PC-I is submitted in the P&DD. S. PSDP Estt: Alloc: Approval Status Financial Status Title of Scheme Remarks No. No. Cost 2020-21 d) PDWP meeting is waited. 4 30 Seed Registration / 200.00 60.00 27.07.20 - - - a) The Project came under discussion in the Certification Program DSC meeting held on 27.7.2020. b) The forum recommended the scheme for consideration by the PDWP. c) The PC-I is submitted in the P&DD. d) PDWP meeting is waited. 5 31 Strengthening of 415.00 100.00 27.07.20 - - - a) The project is aimed at strengthening of 6 existing and existing and establishment of 7 new labs in establishment of New Balochistan Agriculture College Quetta laboratories through provision of Lab equipment and machinery, glassware etc. for educational purpose. b) The physical infrastructure of Labs is already available. c) The Project came under discussion in the DSC meeting held on 27.7.2020. d) The forum recommended the scheme for consideration by the PDWP. e) The PC-I is submitted in the P&DD. f) PDWP meeting is scheduled on 1.09.2020 6 37 Construction of Cold 300.00 50.00 27.07.20 - - - a) The Project came under discussion in the Storage for Fruit at DSC meeting held on 27.7.2020. Killa Saifullah & Kalat. b) The forum recommended the scheme for consideration by the PDWP. c) The PC-I is submitted in the P&DD. d) PDWP meeting is waited.