You are on page 1of 13

Introduction to

High speed Railway Operations and Management

Lei NIE, Professor


School of Traffic and Transportation
Beijing Jiaotong University
Email: lnie@bjtu.edu.cn
Outline

1 Introduction to HSR 概述
2 HSR Traffic demand and Market 高速铁路客运市场需求
Positioning 及定位
3 HSR Train line plan 高速铁路列车开行方案
4 HSR Train timetable 高速铁路列车运行图
5 HSR Capacity 高速铁路运输能力
6 HSR Train-set (EMU)schedule 高速铁路动车组运用
7 HSR Crew schedule, 高速铁路乘务员运用
8 HSR Station operation 高速铁路站车工作组织
9 HSR Traffic Control 高速铁路运营调度
10 HSR Marketing 高速铁路市场营销

2
The Process of Train Operation
Network Planning

Line Planning

Timetabling

Vehicle Scheduling

Crew Scheduling

Re-scheduling

3
4 vertical and 4 horizontal High speed Railway Network

Total length of the 8 long Qingdao-Taiyuan


770km
distance high speed
Beijing-Haerbin
railway is about 12,000 km Xuzhou-Lanzhou 1860km
1400km
Beijing-Shanghai
1318km
Shanghai-Chengdu
1900km

Shanghai-Shenzhen
1600km
Beijing-Hong Kong Hangzhou-Kunming
2230km
Intercity High Speed Railway for urban clusters
哈齐客专
哈牡客专
长吉城际

京津城际

环渤海城际
中原城市群城际

沪宁城际

武汉城市圈 长江三角地区

沪杭城际
成渝城际

长株潭城际 广深城际

珠江三角洲地区 5
Train line plan
Train timetable
Railway Capacity-network
• 线路运输能力的表达 实际能力利用评价

车站及其所

在区段的能力基本信息

列车开行方

可用能力评估过程
C1. Capacity of station

资料:《人民铁道》;客运专线车站到发线运用优化方法《交通运输系统工程与信息》
9
新干线车辆基地布局示意图
Japan Rolling Stock Depot

10
C2. Overnight Train Operation
夜行车——分段天窗形式

2021/9/14 11
Traffic control center 调度中心
法国国家调度中心
济南铁路局调度中心

12
13

You might also like