COBALT 8/7/08 1:32 PM Page 88

profile c o b a lt c o n s t r u c t i o n

>> on the Villages at Northridge, a 275-


unit, independent and assisted-living
senior apartment that began in Sept.
2007 and should be finished by summer
2009. The company value-engineered
$10 million in construction cost savings
of the $55 million project through
advanced planning, Persons says. Cobalt Construction offers
pre-construction, general
“Our preconstruction services in- contracting and heavy engi-
clude preliminary and schematic budg- neering services.
eting and value-engineering,” the com-
pany says. “We assist the owner and
architect in defining the scope of the
project within the budget available for
construction.
“We review the drawings at each stage
of development to assure that the proj-
ect remains on track. Our review also
includes issues of constructability and
completeness.”

Growing Presence
Cobalt’s construction volume has near-
ly doubled in the past three years,
Persons says, and the company current-
ly balances six to eight projects at one
time. Despite the residential slump,
“We haven’t experienced the downturn find people who match our corporate “Our goal is to distinguish our compa-
the single family market has,” he says. culture, we give them a chance.” ny by providing superior, multi-disci-
“Although it has made it more difficult plined, highly integrated construction
for clients to get financing for projects Special Method services [and] incorporating technolo-
longer term, the rental market has been Cobalt has created a patented method gies to increase efficiencies and lower
pretty good for us.” Finding enough of building subterranean parking struc- costs,” it says. The company says its
qualified labor to keep up with that tures that the company anticipates will track record “demonstrates our ability
growth hasn’t been as easy, however. save a significant amount of time and to manage and complete projects within
Although Persons says there is a good building costs. a variety of disciplines,” including:
supply of labor available due to workers The method is in testing phase, » Multifamily and single-family residen-
leaving the single-family housing mar- Persons says, but should reduce build- tial construction;
ket, those workers aren’t always skilled ing costs by up to 15 percent and slice » Site grading and demolition;
enough for the complex assignments months off of construction schedules. » Commercial building construction;
Cobalt takes on. Cobalt developed the method over the » Underground water, sewer and electri-
“Our work is a bit more specialized past two years, and it doesn’t require cal utilities;
and different than single-family lagging and shoring, he notes. » Planning and facilities construction
homes,” Persons says. and repair;
And when the company does find ‘Best in Class’ » Reinforced concrete pipe and con-
capable employees, “We spend a bit of Cobalt says its mission is to supply crete box flood control;
time training them with our methods, as “best-in-class value, quality and serv- » Hillside caisson;
well. “We spend the time talking to ice” to its customers to maintain its » Underground shoring and structural
potential employees,” Persons says. “If steady stream of repeat clients. PCC retaining walls; and
we get a referral – even better. We do It does this, it says, by having the best » Specialty construction for the film
testing with candidates and once we machines, best service and best people. industry. x

88 b&c southwest fall 2008