RECURSOS EMPLEADOS

RECURSOS - MATERIALES
PROYECTO MEJORAMIENTO DEL SERVICIO DE ESPACIOS PUBLICOS DE LA LOCALIDAD MORRO SAMA(PUERTO GRAU) DEL DISTRITO DE SAMA, PROVINCIA DE TACNA - DPTO. TACNA
RESIDENTE : ARQ. MIGUEL ANGEL HUAMAN CUEVA
SUPERVISOR :ING. IVAN MARON LIMACHI
F. INICIO
F. TERMINO
MES : JUNIO 2021

A.2.- MATERIALES (COSTO DIRECTO)


JUNIO - 2021
CANTIDAD SOBRANTE DE MAYO - 2021 SALDO
ITEM DESCRIPCION ADQUIRIDO EN EJECUCION ACUMULADO ANTERIOR EJECUTADO ACTUAL ACUMULADO ACTUAL
UND CANT. P.U. PARCIAL UND CANT. P.U. PARCIAL CANT. PARCIAL % CANT. PARCIAL % CANT. PARCIAL % CANT. PARCIAL %
1 CLAVOS DE 4" KG 30.00 6.40 192.00 10.00 64.00 33.33% 10.00 64.00 33.33% 20.00 128.00 66.67%
2 CLAVOS DE 1 1/2" KG 30.00 8.00 240.00 10.00 80.00 33.33% 10.00 80.00 33.33% 20.00 160.00 66.67%
3 CLAVOS DE 3" KG 50.00 6.40 320.00 30.00 192.00 60.00% 30.00 192.00 60.00% 20.00 128.00 40.00%
4 CLAVOS DE 2" KG 8.00 6.40 51.20 2.00 12.80 25.00% 2.00 12.80 25.00% 6.00 38.40 75.00%
5 CLAVOS DE 1" KG 2.00 12.00 24.00 0.00% 2.00 24.00 100.00%
6 ACERO LISO VAR 24.00 5.00 120.00 0.00% 24.00 120.00 100.00%
7 ALAMBRE Nº 8 KG 5.00 6.40 32.00 5.00 32.00 100.00% 5.00 32.00 100.00%
8 ALAMBRE Nº 16 KG 1.00 9.80 9.80 1.00 9.80 100.00% 1.00 9.80 100.00%
9 DISCO DE CORTE 12" P/MADERA UND 6.00 59.00 354.00 6.00 354.00 100.00%
10 DISCO DE CORTE 7 1/4" P/CONCRETO UND 41.00 20.00 820.00 41.00 820.00 100.00%
11 CEMENTO BLS 324.00 22.50 7,290.00 324.00 7,290.00 100.00%
12 YESO BLS 15.00 18.00 270.00 15.00 270.00 100.00%
13 TRIPLAY 18mm PLN 4.00 155.00 620.00 4.00 620.00 100.00%
14 TRIPLAY 4mm PLN 1.00 45.00 45.00 1.00 45.00 100.00%
15 POLIESTIRENO UND 8.00 16.00 128.00 1.00 16.00 12.50% 1.00 16.00 12.50% 7.00 112.00 87.50%
16 COLA SINTETICA GLN 14.00 25.00 350.00 12.00 300.00 85.71% 12.00 300.00 85.71% 2.00 50.00 14.29%
17 BROCHA 4" UND 2.00 18.00 36.00 2.00 36.00 100.00%
18 RODILLO 9" UND 2.00 16.00 32.00 2.00 32.00 100.00%
19 ESPATULA 4" UND 6.00 8.00 48.00 2.00 16.00 33.33% 2.00 16.00 33.33% 4.00 32.00 66.67%
20 OCRE BAYER UND 18.00 12.00 216.00 18.00 216.00 100.00%
21 CHEMA PLAS GLN 4.00 45.00 180.00 4.00 180.00 100.00%
22 SOLVENTE BLDE 1.00 75.00 75.00 1.00 75.00 100.00% 1.00 75.00 100.00%
23 CHEMA DESMOLDANTE BLDE 1.00 120.00 120.00 1.00 120.00 100.00%
24 CURVA PVC 25mm UND 1.00 2.00 2.00 1.00 2.00 100.00%
25 PEGAMENTO PVC UND 1.00 42.00 42.00 1.00 42.00 100.00%
26 TUBO PVC 20mm UND 8.00 4.50 36.00 3.00 13.50 37.50% 3.00 13.50 37.50% 5.00 22.50 62.50%
27 CURVAS PVC 20mm UND 11.00 1.00 11.00 11.00 11.00 100.00%
28 CONDUCTOR N2 X 6m UND 300.00 7.80 2,340.00 300.00 2,340.00 100.00%
29 CONDUCTOR TIPO N2X6M SEÑALIZACION UND 150.00 8.00 1,200.00 150.00 1,200.00 100.00%
30 CINTA AISLANTE SCOTCH UND 2.00 25.00 50.00 2.00 50.00 100.00%
31 CINTA AISLANTE 3M UND 3.00 9.00 27.00 3.00 27.00 100.00%
32 VARILLA DE COBRE UND 1.00 210.00 210.00 1.00 210.00 100.00% 1.00 210.00 100.00%
33 CONDUCTOR DESNUDO M 10.00 10.00 100.00 10.00 100.00 100.00%
34 CEMENTO CONDUCTIVO BLS 3.00 140.00 420.00 3.00 420.00 100.00%
35 CONDUCTOR SEÑALIZADO 10M UND 10.00 8.00 80.00 10.00 80.00 100.00%
36 TUBERIA PVC C/R - 3/4 UND 15.00 28.00 420.00 15.00 420.00 100.00%
37 CODO PVC C/R- 3/4 X 90 UND 15.00 3.00 45.00 15.00 45.00 100.00%
38 TEE PVC S/R 3/4 LISO UND 11.00 4.00 44.00 11.00 44.00 100.00%
39 CINTA TEFLON UND 10.00 1.50 15.00 2.00 3.00 20.00% 2.00 3.00 20.00% 8.00 12.00 80.00%
40 UNION 3/4" UND 10.00 2.80 28.00 10.00 28.00 100.00%
41 RC 250 GLN 25.00 18.00 450.00 25.00 450.00 100.00%
42 GUANTES QUIRURGICOS CJA 15.00 45.00 675.00 4.00 180.00 26.67% 4.00 180.00 26.67% 11.00 495.00 73.33%
43 LADRILLO UND 370.00 2.50 925.00 370.00 925.00 100.00% 370.00 925.00 100.00%
44 PERFIL UND 10.00 16.50 165.00 10.00 165.00 100.00%
45 CURADOR MEMBRANAL BLDE 1.00 20.00 20.00 1.00 20.00 100.00%
46 LAMPA UND 6.00 25.00 150.00 6.00 150.00 100.00%
47 BARRETA UND 2.00 55.00 110.00 2.00 110.00 100.00%
48 RASTRILLO UND 4.00 25.00 100.00 4.00 100.00 100.00%
49 COMBA 25 LB UND 1.00 125.00 125.00 1.00 125.00 100.00%
50 CONO UND 6.00 40.00 240.00 6.00 240.00 100.00%
51 PICO UND 6.00 35.00 210.00 6.00 210.00 100.00%
52 ESCOBA UND 1.00 15.00 15.00 1.00 15.00 100.00%
53 ESCOBA DE PAJA UND 1.00 16.00 16.00 1.00 16.00 100.00%
54 CARRETILLA UND 4.00 170.00 680.00 4.00 680.00 100.00%
55 CINCEL PUNTA UND 3.00 12.00 36.00 3.00 36.00 100.00%
56 CINCEL PLANO UND 2.00 12.00 24.00 2.00 24.00 100.00%
57 KIT DE BUGGIE UND 11.00 50.00 550.00 11.00 550.00 100.00%
58 CINTA DE SEGURIDAD RLL 4.00 45.00 180.00 4.00 180.00 100.00%
59 EXTINTOR UND 1.00 180.00 180.00 1.00 180.00 100.00%
60 CAMILLA UND 1.00 300.00 300.00 1.00 300.00 100.00%
61 ESPONJA 2" UND 4.00 42.00 168.00 4.00 168.00 100.00%
62 CAJA DE AGUA UND 4.00 25.00 100.00 4.00 100.00 100.00% 4.00 100.00 100.00%
63 GUANTES DE CUERO UND 4.00 10.00 40.00 2.00 20.00 50.00% 2.00 20.00 50.00% 2.00 20.00 50.00%
64 GUANTES DE JEBE UND 10.00 9.00 90.00 10.00 90.00 100.00%
65 CAMISA DRILL UND 7.00 32.50 227.50 7.00 227.50 100.00%
66 PANTALON UND 3.00 32.50 97.50 3.00 97.50 100.00%
67 ALCOHOL EN GEL UND 19.00 12.00 228.00 19.00 228.00 100.00%
68 ALCOHOL MEDICINAL 70 UND 19.00 18.00 342.00 19.00 342.00 100.00%
69 DETERGENTE KG 10.00 85.00 850.00 10.00 850.00 100.00%
70 MOCHILA FUMIGADORA UND 1.00 200.00 200.00 1.00 200.00 100.00%
71 MANGUERA M 100.00 3.50 350.00 100.00 350.00 100.00%
72 AGUA DE MESA C/DISPENSADOR UND 15.00 26.00 390.00 UND 15.00 2.00 52.00 13.33% 2.00 52.00 13.33% 13.00 338.00 86.67%
73 ALAMBRE NEGRO #8 KG 70.00 9.80 686.00 KG 70.00 20.00 196.00 28.57% 20.00 196.00 28.57% 50.00 490.00 71.43%
74 ALAMBRE NEGRO#16 KG 40.00 9.80 392.00 KG 40.00 10.00 98.00 25.00% 10.00 98.00 25.00% 30.00 294.00 75.00%
75 LIJA P/FIERRO N° 80 UND 100.00 1.61 161.00 UND 100.00 100.00 161.00 100.00%
76 LIJA P/FIERRO N° 120 UND 100.00 1.61 161.00 UND 100.00 100.00 161.00 100.00%
77 TAPONES DE 3/4'' UND 25.00 4.50 112.50 UND 25.00 25.00 112.50 100.00%
78 FORMADOR DE EMPAQUETADURA UND 5.00 10.00 50.00 UND 5.00 5.00 50.00 100.00%
79 PEGAMENTO PARA PVC GLN 1.00 155.00 155.00 GLN 1.00 1.00 155.00 100.00%
80 GUANTE BADANA PAR 20.00 9.50 190.00 PAR 20.00 20.00 190.00 100.00%
81 LENTES DE PROTECCION OSCUROS UND 10.00 13.30 133.00 UND 10.00 10.00 133.00 100.00%
82 CHALECO DE SEGURIDAD UND 3.00 84.00 252.00 UND 3.00 3.00 252.00 100.00%
83 JABON LIQUIDO LT 5.00 22.00 110.00 LT 5.00 1.00 22.00 20.00% 1.00 22.00 20.00% 4.00 88.00 80.00%
84 ELECTRODOS SOLDADURA CELLACORD KG 5.00 18.50 92.50 KG 5.00 5.00 92.50 100.00%
85 DISCO DE CORTE DE 4 1/2 P/FIERRO UND 10.00 5.00 50.00 UND 10.00 3.00 15.00 30.00% 3.00 15.00 30.00% 7.00 35.00 70.00%
86 PINTURA ANTICORROSIVA GLN 1.00 48.00 48.00 GLN 1.00 1.00 48.00 100.00%
87 THINER GLN 1.00 18.00 18.00 GLN 1.00 1.00 18.00 100.00%
88 DISCO DE CORTE P/FIERRO DE 7'' UND 5.00 12.00 60.00 UND 5.00 5.00 60.00 100.00%
89 CAJA PORTAMEDIDOR TRIFASICO UND 1.00 100.00 100.00 UND 1.00 1.00 100.00 100.00%
90 TUBO DE PVC SAP 50MM X3M UND 8.00 47.00 376.00 UND 8.00 1.00 47.00 12.50% 1.00 47.00 12.50% 7.00 329.00 87.50%
91 CURVA PVC SAP 50MM UND 6.00 14.00 84.00 UND 6.00 2.00 28.00 33.33% 2.00 28.00 33.33% 4.00 56.00 66.67%
92 CONDUCTOR ELECTRICO 14 MT 20.00 5.00 100.00 MT 20.00 20.00 100.00 100.00%
93 CINTA BOND IT MT 4.00 5.50 22.00 MT 4.00 4.00 22.00 100.00%
94 PRESILLAS 3/4 UND 6.00 3.50 21.00 UND 6.00 6.00 21.00 100.00%
COSTO TOTAL S/. 28,251.00 S/. - S/. - #¡REF! S/. 2,707.10 S/. 2,707.10 S/. 25,543.90