You are on page 1of 2
Non-Conformity Ri Hydra [Drawing No: Prod. Order No: comme | 7 Jouantity $= = [Tar vee & [2—549¢ _t [PROBLEM DESCRIPTIONS oe i Le Clem peck: BQ. Dim. ig PestAaoi ~ lego amy 5 gin, Buc obhaveal A90Xa45 xi THK. Li neue: QOeX 4.5xXi2 TK 2. Chern ne £3 Z, Dim hi Qn ahpedlanirg AoA yin | ohhOVed 4 B4X +o) 2 THK: Aart aie fe 3. aes td: fog. Eee ber diawiy But inter oSian [SUSE SSE a {OPO WES No. (IB ony [REWORK REPAIR DETALS) = REWORKCONFIRMATIONS z= se [costorroor atari? Ea Material Gost: Design Co: [Transportaton/ Packing/ Storage Cost Rework Houre x INRA? [Cost debited to Supplier [Other Indirect Cost: STAL COST: Detect tyes I [ctosureibaeee ered) som P HIN QM 02 11-1 Rev.02 1of2 Issue Date: 06.03.2012 Non-Conformity Report (NCR) ANDRIIZ. Hydro [CIRCULATION OF NGA : AS PER PROCEDURE OF CONTROL OF NON CONFORMITIES ( PHIN(GM 02 17) INCR No. |Receiving e on A ‘Actions / Comments / Remer [Corrective act nating process Sign with name or 20f2 P HIN M02 11-1 Rev.02 Issue Dato : 06.03.2012

You might also like