Professional Documents
Culture Documents
Gambar Gerbang Tematik Tanah Datar Alt. 3
Gambar Gerbang Tematik Tanah Datar Alt. 3
HARMONI K E H I D U P A N
5
600
LOKASI
200 BUKIT BARUGA
2 R100 600 MAKASSAR
250 KETERANGAN
R2 5
80 0
0
450
500
500
450
250
400
0
173
400
450
300
500
40
450
4 00
55 PERENCANA
100
225
100
260
100
ance
Hias
Entr
Hias
Kali
550
Sign
100
man
416
ini
Batu
hM
10 w an
Tana
att
Pek.
LED pu tam
Gaja
100
505
R200
put
m
/ La
Rum
560
pu
590
150
300
1 581
GERBANGTEMATIKTANAHDATAR
No.GBR
JML.LBR
NAMA FILE
BUKIT BARUGA
HARMONI K E H I D U P A N
LOKASI
BUKIT BARUGA
MAKASSAR
400
KETERANGAN
R200
1500
23
10 15
532 22
R200
PEKERJAANSGI NENTRANCE
No.GBR
JML.LBR
NAMA FILE
BUKIT BARUGA
350 HARMONI K E H I D U P A N
2 10 158 10 158 10 2
LOKASI
10 2
BUKIT BARUGA
MAKASSAR
KETERANGAN
140
160
20
50
60
Rabat Beton t. 5 cm
55
Pasri Urug t. 5 cm
40 115 40 115 40
POTONGAN A
A C B
PERENCANA
40
40
PT. BARUGA ASRINUSA DEVELOPMENT
Jl. RAYA BARUGA SEKTOR MAHAMERU No. 1 MAKASSAR
40 115 40 115 40
350 TEAM TEKNIS TGL PARAF
DISETUJUI ANSHAR PRIWARSANI, ST
RENCANA PONDASI BARUGA DICHECK SURAHMI RAHMAN, ST
DRAFTER ISFAN R.Y.
40
36
16
2 10
2 10 158 10 158 10 2
346
350
10 2
10 2
10 2
10 2
LOKASI :
10 BUKIT BARUGA
2∅6 MAKASSAR
10
Kolom Praktis 10/10 Finish Tegel Teraso
2∅6
DET. RINGBALK
1:5
128
128
128
128
160
160
10
2∅6
∅6-200
10
2∅6
Sloef 10/20 Sloef 10/20
DET. KOLOM
1:5
20
20
20
20
PERENCANA
∅4-200
20
GERBANG TANAH DATAR
GBR/TD1-SRN-
Rabat Beton t. 5 cm
55
Pasri Urug t. 5 cm
40 2∅6
POT. C
POT. B DET. SLOEF
1:5
No.GBR
JML.LBR
NAMA FILE
BUKIT BARUGA
HARMONI K E H I D U P A N
LOKASI :
BUKIT BARUGA
MAKASSAR
KETERANGAN
P D T U
TAMPAK DEPAN
PERENCANA
GBR TD SRN
TAMPAK BELAKANG
N GBR
ML LBR
NAMA FILE
BUKIT BARUGA
HARMONI K E H I D U P A N
LOKASI
Pondasi Batu Kali
Sloef 15/20
BUKIT BARUGA
MAKASSAR
Rostek Motif
20x20x10 cm
Frame Besi Strip (Tiang Tegak) KETERANGAN
50x5 mm (Tengah)
144 144
123 123
23
10 15
532 22
POT. B
A Frame Besi Strip 10 Frame Besi Strip
50x5 mm (Atas) 50x5 mm (Atas)
240
240
Frame Besi Strip
Frame Besi Strip (Tiang Tegak)
50x5 mm (Pinggir)
50x5 mm (Tengah)
HDA-P M10/20
20
20
20 DISETUJUI ANSHAR PRIWARSANI, ST
Sloef 10/20 DICHECK SURAHMI RAHMAN, ST
DRAFTER ISFAN R.Y.
60
60
Pas. Pondasi Batu Kali Pas. Pondasi Batu Kali GERBANG TANAH DATAR
Urugan Pasir Urugan Pasir
5 5
5 581.31 5 5 60 5
591.31 70
No.GBR
JML.LBR
NAMA FILE
BUKIT BARUGA
HARMONI K E H I D U P A N
LOKASI
Rostek Motif
BUKIT BARUGA
20x20x10 cm MAKASSAR
Frame Besi Strip
50x5 mm (Atas)
Det. A KETERANGAN
144 144
123 123
532 10
POT. B
Frame Besi Strip Frame Besi Strip Frame Besi Strip Frame Besi Strip Frame Besi Strip
A 50x5 mm (Atas) 50x5 mm (Atas) 50x5 mm (Atas) 50x5 mm (Atas) 10 50x5 mm (Atas)
Frame Besi Strip Frame Besi Strip Frame Besi Strip Frame Besi Strip Frame Besi Strip
50x5 mm (Pinggir) 50x5 mm (Tengah) 50x5 mm (Tengah) 50x5 mm (Tengah) 50x5 mm (Pinggir)
240.4
240
Rostek Motif
20x20x10 cm
B
Frame Besi Strip PERENCANA
50x5 mm (Pinggir)
Elv. 0.00 Sloef 15/20 Elv. 0.00 Sloef 15/20 PT. BARUGA ASRINUSA DEVELOPMENT
Jl. RAYA BARUGA SEKTOR MAHAMERU No. 1 MAKASSAR
HSA-M8x57
HSA-M8x57
HSA-M8x57
20
20
TEAM TEKNIS TGL PARAF
20
DISETUJUI ANSHAR PRIWARSANI, ST
DICHECK SURAHMI RAHMAN, ST
60
60
Pas. Pondasi Batu Kali Pas. Pondasi Batu Kali DRAFTER ISFAN R.Y.
Urugan Pasir Urugan Pasir
GERBANG TANAH DATAR
5 5
5 580.17 5 5 60 5
590.17 70
No.GBR
JML.LBR
NAMA FILE
BUKIT BARUGA
HARMONI K E H I D U P A N
Det. A
Frame Besi Strip 1000x3 mm (Pinggir)
diLas ke Pembesian Sloef
Dynabolt M6
Sloef 15/20
PERENCANA