You are on page 1of 8

400 BUKIT BARUGA

HARMONI K E H I D U P A N

5
600
LOKASI
200 BUKIT BARUGA
2 R100 600 MAKASSAR

250 KETERANGAN

R2 5

80 0
0
450
500

500
450
250

400

0
173
400
450

300
500

400 1010 1500

40

450
4 00

55 PERENCANA
100
225
100

260
100
ance

Hias
Entr

Hias
Kali
550
Sign

100
man

416
ini
Batu

hM

10 w an
Tana

att
Pek.

LED pu tam
Gaja

100

505
R200
put

m
/ La
Rum

PT. BARUGA ASRINUSA DEVELOPMENT


spot

560
pu

Jl. RAYA BARUGA SEKTOR MAHAMERU No. 1 MAKASSAR


Lam

590
150

TEAM TEKNIS TGL PARAF


600 DISETUJUI ANSHAR PRIWARSANI, ST
250

DICHECK SURAHMI RAHMAN, ST


0
111

DRAFTER ISFAN R.Y.

300
1 581

GERBANGTEMATIKTANAHDATAR
No.GBR
JML.LBR
NAMA FILE
BUKIT BARUGA
HARMONI K E H I D U P A N

LOKASI
BUKIT BARUGA
MAKASSAR
400
KETERANGAN
R200

Pondasi Batu Kali


Sloef 15/20
1010
Rostek Motif
20x20x10 cm
Frame Besi Strip (Tiang Tegak)
50x5 mm (Tengah)
144 144
123 123

1500
23
10 15
532 22

Pek. Sign Entrance

Batu Kali Hias


40
PERENCANA
Tanaman Hias
DENAHROSTERSSI IKANAN KRI IENTRANCE
Rumput Gajah Mini PT. BARUGA ASRINUSA DEVELOPMENT
Jl. RAYA BARUGA SEKTOR MAHAMERU No. 1 MAKASSAR
Lampu spot / Lampu taman
LED 10 watt TEAM TEKNIS TGL PARAF
450 DISETUJUI ANSHAR PRIWARSANI, ST
DICHECK SURAHMI RAHMAN, ST
DRAFTER ISFAN R.Y.

R200

PEKERJAANSGI NENTRANCE

No.GBR
JML.LBR
NAMA FILE
BUKIT BARUGA
350 HARMONI K E H I D U P A N
2 10 158 10 158 10 2

LOKASI

10 2
BUKIT BARUGA
MAKASSAR

KETERANGAN

140
160

20
50
60

Pondasi BRG 40.40.50

Rabat Beton t. 5 cm
55

Pasri Urug t. 5 cm
40 115 40 115 40

POTONGAN A

A C B
PERENCANA
40

40
PT. BARUGA ASRINUSA DEVELOPMENT
Jl. RAYA BARUGA SEKTOR MAHAMERU No. 1 MAKASSAR
40 115 40 115 40
350 TEAM TEKNIS TGL PARAF
DISETUJUI ANSHAR PRIWARSANI, ST
RENCANA PONDASI BARUGA DICHECK SURAHMI RAHMAN, ST
DRAFTER ISFAN R.Y.

GERBANG TANAH DATAR


10 2

40
36
16
2 10

2 10 158 10 158 10 2
346
350

RENCANA KOLOM, SLOEF, RINGBALK


No.GBR
JML.LBR
NAMA FILE
40 40 BUKIT BARUGA
2 10 10 2 2 10 10 2
Ringbalok 10/10 Ringbalok 10/10 HARMONI K E H I D U P A N

10 2

10 2

10 2

10 2
LOKASI :
10 BUKIT BARUGA
2∅6 MAKASSAR

Pas. Hebel ∅6-200 KETERANGAN

10
Kolom Praktis 10/10 Finish Tegel Teraso
2∅6

DET. RINGBALK
1:5
128

128

128

128
160

160
10
2∅6

∅6-200

10
2∅6
Sloef 10/20 Sloef 10/20
DET. KOLOM
1:5
20

20

20

20
PERENCANA

Pas. 1/2 Batu Bata


5 20
25

Pondasi BRG 40.40.50 10 PT. BARUGA ASRINUSA DEVELOPMENT


2∅6 Jl. RAYA BARUGA SEKTOR MAHAMERU No. 1 MAKASSAR

Pasri Urug t. 5 cm TEAM TEKNIS TGL PARAF


50
60

DISETUJUI ANSHAR PRIWARSANI, ST


14 14 DICHECK SURAHMI RAHMAN, ST
DRAFTER ISFAN R.Y.

∅4-200

20
GERBANG TANAH DATAR

GBR/TD1-SRN-
Rabat Beton t. 5 cm
55

Pasri Urug t. 5 cm
40 2∅6
POT. C
POT. B DET. SLOEF
1:5
No.GBR
JML.LBR
NAMA FILE
BUKIT BARUGA
HARMONI K E H I D U P A N

LOKASI :
BUKIT BARUGA
MAKASSAR

KETERANGAN

P D T U

TAMPAK DEPAN

PERENCANA

FINIS ING PLESTER ACI EKSPOS PT. BARUGA ASRINUSA DEVELOPMENT


RA A BARUGA SEKTOR MA AMERU N MAKASSAR

TEAM TEKNIS TGL PARAF


DISETU UI ANS AR PRI ARSANI ST
DIC ECK SURA MI RA MAN ST
DRAFTER ISFAN R

GERBANG TANA DATAR

GBR TD SRN

TAMPAK BELAKANG
N GBR
ML LBR
NAMA FILE
BUKIT BARUGA
HARMONI K E H I D U P A N

LOKASI
Pondasi Batu Kali
Sloef 15/20
BUKIT BARUGA
MAKASSAR
Rostek Motif
20x20x10 cm
Frame Besi Strip (Tiang Tegak) KETERANGAN
50x5 mm (Tengah)
144 144
123 123

23
10 15
532 22

POT. B
A Frame Besi Strip 10 Frame Besi Strip
50x5 mm (Atas) 50x5 mm (Atas)
240

240
Frame Besi Strip
Frame Besi Strip (Tiang Tegak)
50x5 mm (Pinggir)
50x5 mm (Tengah)

Rostek Motif Rostek Motif


PERENCANA
20x20x10 cm 20x20x10 cm
B

Sloef 15/20 PT. BARUGA ASRINUSA DEVELOPMENT


Baut Dinabolt Jl. RAYA BARUGA SEKTOR MAHAMERU No. 1 MAKASSAR
Elv. 0.00 Elv. 0.00
TEAM TEKNIS TGL PARAF
02/01M P-ADH

HDA-P M10/20
20

20
20 DISETUJUI ANSHAR PRIWARSANI, ST
Sloef 10/20 DICHECK SURAHMI RAHMAN, ST
DRAFTER ISFAN R.Y.
60

60
Pas. Pondasi Batu Kali Pas. Pondasi Batu Kali GERBANG TANAH DATAR
Urugan Pasir Urugan Pasir
5 5

5 581.31 5 5 60 5
591.31 70

DETAIL POT. MEMANJANG PASANGAN ROSTEK POT. A

No.GBR
JML.LBR
NAMA FILE
BUKIT BARUGA
HARMONI K E H I D U P A N

LOKASI
Rostek Motif
BUKIT BARUGA
20x20x10 cm MAKASSAR
Frame Besi Strip
50x5 mm (Atas)
Det. A KETERANGAN

144 144
123 123

532 10

POT. B

Frame Besi Strip Frame Besi Strip Frame Besi Strip Frame Besi Strip Frame Besi Strip
A 50x5 mm (Atas) 50x5 mm (Atas) 50x5 mm (Atas) 50x5 mm (Atas) 10 50x5 mm (Atas)

Frame Besi Strip Frame Besi Strip Frame Besi Strip Frame Besi Strip Frame Besi Strip
50x5 mm (Pinggir) 50x5 mm (Tengah) 50x5 mm (Tengah) 50x5 mm (Tengah) 50x5 mm (Pinggir)
240.4

240
Rostek Motif
20x20x10 cm
B
Frame Besi Strip PERENCANA
50x5 mm (Pinggir)

Det. B Dynabolt Dynabolt

Elv. 0.00 Sloef 15/20 Elv. 0.00 Sloef 15/20 PT. BARUGA ASRINUSA DEVELOPMENT
Jl. RAYA BARUGA SEKTOR MAHAMERU No. 1 MAKASSAR
HSA-M8x57

HSA-M8x57

HSA-M8x57
20

20
TEAM TEKNIS TGL PARAF
20
DISETUJUI ANSHAR PRIWARSANI, ST
DICHECK SURAHMI RAHMAN, ST
60

60
Pas. Pondasi Batu Kali Pas. Pondasi Batu Kali DRAFTER ISFAN R.Y.
Urugan Pasir Urugan Pasir
GERBANG TANAH DATAR
5 5

5 580.17 5 5 60 5
590.17 70

DETAIL POT. MEMANJANG FRAME ROSTEK POT. A

No.GBR
JML.LBR
NAMA FILE
BUKIT BARUGA
HARMONI K E H I D U P A N

Frame Besi Strip (Tiang Tegak) LOKASI


50x5 mm (Tengah) BUKIT BARUGA
MAKASSAR
Frame Besi Strip (Melitang) Spasi Rostek 5 mm
50x5 mm (Atas) Power Bond Pro-889 KETERANGAN
Rostek Motif
20x20x10 cm

Det. A
Frame Besi Strip 1000x3 mm (Pinggir)
diLas ke Pembesian Sloef
Dynabolt M6
Sloef 15/20
PERENCANA

PT. BARUGA ASRINUSA DEVELOPMENT


Jl. RAYA BARUGA SEKTOR MAHAMERU No. 1 MAKASSAR
HSA-M8x57

TEAM TEKNIS TGL PARAF


DISETUJUI ANSHAR PRIWARSANI, ST
DICHECK SURAHMI RAHMAN, ST
DRAFTER ISFAN R.Y.

GERBANG TANAH DATAR

Det. B Tanah Dasar


Pas. Pondasi Batu Kali
No.GBR
JML.LBR
NAMA FILE

You might also like