Professional Documents
Culture Documents
Acceptability
No Item Check Remark
Yes No
1 Check location and layout vs approved drawing.
2 Check correct material,pipe size.
3 Check proper alignment and gradient of pipe run.
4 Check proper pipe jointing.
5 Check on any visible damages on pipe.
Comment:
Check by (sub con Rep) Verified by (Main con Rep) Approved by( RE/COW)