Summarry of Steel used

Quantity for Single Nos of Total


Item Description Abutment and Pier Abutment and
Quantaty
and Super Structure Pier
HYSD in Abutment Pile 12.671 MT 2 25.342
HYSD in Pier Pile 9.057 MT 1 9.057
Sub Total = 34.399 MT
HYSD in Abutment Pile Cap 3.465 MT 2 6.931
HYSD in Pier Pile Cap 2.782 MT 1 2.782
Sub Total = 9.713 MT
HYSD in Sub Structure Abutment 4.920 MT 2 9.840
HYSD in Sub Structure Pier 2.365 MT 1 2.365
Sub Total = 12.205 MT
HYSD in Super Structure 15.671 MT 2 31.342
Sub Total = 31.342 MT
HYSD in Retaining Wall 5.983 MT 2 11.966
Sub Total = 11.966 MT