OROMIA FOUR TOWNS WATER SUPPLY PROJECT

AMBO DETAIL DESIGN


APPENDIX B-1; BASIS FOR DEMAND COMPUTATION

67.7% 3.0% 3.4% 6.8% 6.8% 3.4% 9.0% 0.0% R S H CO AD Ind Col FG
Node Area Area in % for _function Demand Density (m³/day per km²)
number m² km² R S H CO AD Ind Col FG 227 211 668 635 78 59 243 0
J-001 - 0% - - - - - - - -
J-002 - 0% 0% 0% 0% 0% 0% 0% 0% 0% - - - - - - - -
J-003 - 0% - - - - - - - -
J-004 - 0% 0% 0% 0% 0% 0% 0% 0% 0% - - - - - - - -
J-005 - 0% - - - - - - - -
J-006 4771894 4.772 50% 0% 0% 0% 0% 0% 29% 21% 100% 2.40 - - - - - 1.38 1.00
J-007 - - - - - - - - - - 0% - - - - - - - -
J-008 - - - - - - - - - - 0% - - - - - - - -
J-009 - - - - - - - - - - 0% - - - - - - - -
J-010 - 0% 0% 0% 0% 0% 0% 0% 0% 0% - - - - - - - -
J-011 - - - - - - - - - - 0% - - - - - - - -
J-012 - - - - - - - - - - 0% - - - - - - - -
J-013 - - - - - - - - - - 0% - - - - - - - -
J-014 - 0% 0% 0% 0% 0% 0% 0% 0% 0% - - - - - - - -
J-015 - - - - - - - - - - 0% - - - - - - - -
J-016 - - - - - - - - - - 0% - - - - - - - -
J-017 - - - - - - - - - - 0% - - - - - - - -
J-018 1,263,093 1.263 36% - - - 9% 56% - - 100% 0.45 - - - 0.11 0.70 - -
J-019 - 0% 0% 0% 0% 0% 0% 0% 0% 0% - - - - - - - -
J-020 - - - - - - - - - - 0% - - - - - - - -
J-021 - - - - - - - - - - 0% - - - - - - - -
J-022 8,439,329 8.439 33% 0% 0% 0% 26% 0% 0% 41% 100% 2.76 0.01 - - 2.19 - - 3.48
J-023 - - - - - - - - - - 0% - - - - - - - -
J-024 1,437,144 1.437 74% 0% 0% 0% 12% 8% 0% 6% 100% 1.06 - - - 0.17 0.12 - 0.08
J-025 978,615 0.979 0.79 - - - - - - 0.21 100% 0.77 - - - - - - 0.20
J-026 - - - - - - - - - - 0% - - - - - - - -
J-027 - - - - - - - - - - 0% - - - - - - - -
J-028 9,313,344 2.873 32% 2% 0% 0% 33% 0% 0% 33% 100% 0.92 0.04 - - 0.95 - - 0.95
J-029 - - - - - - - - - - 0% - - - - - - - -
J-030 - - - - - - - - - - 0% - - - - - - - -
J-031 531,086 0.531 77% 10% 9% 0% 0% 0% 0% 4% 100% 0.41 0.05 0.05 - - - - 0.02
J-032 - - 0% 0% 0% 0% 0% 0% 0% 0% 0% - - - - - - - -
J-033 - - - - - - - - - - 0% - - - - - - - -
J-034 2,833,603 2.834 24% 5% 0% 0% 28% 0% 0% 43% 100% 0.68 0.14 - - 0.78 - - 1.23
J-035 - - 0% 0% 0% 0% 0% 0% 0% 0% 0% - - - - - - - -
J-036 - - 0% 0% 0% 0% 0% 0% 0% 0% 0% - - - - - - - -
J-037 - - - - - - - - - - 0% - - - - - - - -
J-038 - - - - - - - - - - 0% - - - - - - - -
J-039 - - - - - - - - - - 0% - - - - - - - -
J-040 10,208,560 10.209 50% 1% 1% 0% 16% 4% 7% 20% 100% 5.14 0.12 0.08 - 1.67 0.46 0.72 2.02
J-041 - - - - - - - - - - 0% - - - - - - - -
J-042 - - 0% 0% 0% 0% 0% 0% 0% 0% 0% - - - - - - - -
J-043 - - - - - - - - - - 0% - - - - - - - -
J-044 - - - - - - - - - - 0% - - - - - - - -
J-045 - - - - - - - - - - 0% - - - - - - - -
J-046 - - 0% 0% 0% 0% 0% 0% 0% 0% 0% - - - - - - - -
J-047 1,187,638 1.188 56% 8% 0% 12% 5% 0% 0% 18% 100% 0.67 0.09 - 0.15 0.06 - - 0.22
J-048 809,924 0.810 64% 11% 0% 0% 0% 0% 0% 24% 100% 0.52 0.09 - - - - - 0.20
J-049 - - - - - - - - - - 0% - - - - - - - -
J-050 - - 0% 0% 0% 0% 0% 0% 0% 0% 0% - - - - - - - -
J-051 - - - - - - - - - - 0% - - - - - - - -
J-052 - - - - - - - - - - 0% - - - - - - - -
J-053 - - - - - - - - - - 0% - - - - - - - -
J-054 - - - - - - - - - - 0% - - - - - - - -
J-055 - - 0% 0% 0% 0% 0% 0% 0% 0% 0% - - - - - - - -
J-056 3,400,085 3.400 0.29 - - - - 0.04 - 0.67 100% 0.99 - - - - 0.12 - 2.28
J-057 - - 0% 0% 0% 0% 0% 0% 0% 0% 0% - - - - - - - -
J-058 - - - - - - - - - - 0% - - - - - - - -
J-059 6,903,295 6.903 8% 0% 0% 0% 1% 3% 0% 89% 100% 0.55 - - - 0.04 0.20 - 6.12
J-060 - - - - - - - - - - 0% - - - - - - - -
J-061 - - 0% 0% 0% 0% 0% 0% 0% 0% 0% - - - - - - - -
J-062 - - - - - - - - - - 0% - - - - - - - -
J-063 - - - - - - - - - - 0% - - - - - - - -
J-064 - - - - - - - - - - 0% - - - - - - - -
J-065 - - - - - - - - - - 0% - - - - - - - -
J-066 - - - - - - - - - - 0% - - - - - - - -
J-067 2,696,765 2.697 35% 13% 0% 0% 5% 13% 0% 34% 100% 0.94 0.35 - - 0.14 0.35 - 0.91
J-068 4,752,043 4.752 41% 1% 0% 0% 5% 12% 0% 41% 100% 1.97 0.06 - - 0.21 0.56 - 1.94
J-069 3,597,012 3.597 24% 0% 0% 0% 3% 32% 0% 41% 100% 0.87 - - - 0.11 1.15 - 1.46
J-070 - - - - - - - - - - 0% - - - - - - - -
OROMIA FOUR TOWNS WATER SUPPLY PROJECT
AMBO DETAIL DESIGN
APPENDIX B-1; BASIS FOR DEMAND COMPUTATION

67.7% 3.0% 3.4% 6.8% 6.8% 3.4% 9.0% 0.0% R S H CO AD Ind Col FG
Node Area Area in % for _function Demand Density (m³/day per km²)
number m² km² R S H CO AD Ind Col FG 227 211 668 635 78 59 243 0
J-071 - - 0% 0% 0% 0% 0% 0% 0% 0% 0% - - - - - - - -
J-072 - - 0% 0% 0% 0% 0% 0% 0% 0% 0% - - - - - - - -
J-073 5,113,721 5.114 18% 1% 5% 0% 0% 0% 17% 59% 100% 0.90 0.03 0.27 0.02 0.01 0.02 0.86 3.00
J-074 - - - - - - - - - - 0% - - - - - - - -
J-075 - - - - - - - - - - 0% - - - - - - - -
J-076 - - 0% 0% 0% 0% 0% 0% 0% 0% 0% - - - - - - - -
J-077 - - 0% 0% 0% 0% 0% 0% 0% 0% 0% - - - - - - - -
J-078 - - - - - - - - - - 0% - - - - - - - -
J-079 - - - - - - - - - - 0% - - - - - - - -
J-080 - - - - - - - - - - 0% - - - - - - - -
J-081 - - - - - - - - - - 0% - - - - - - - -
J-082 - - - - - - - - - - 0% - - - - - - - -
J-083 - - - - - - - - - - 0% - - - - - - - -
J-084 - - - - - - - - - - 0% - - - - - - - -
J-085 - - - - - - - - - - 0% - - - - - - - -
J-086 - - - - - - - - - - 0% - - - - - - - -
J-087 - - - - - - - - - - 0% - - - - - - - -
J-088 - - 0% 0% 0% 0% 0% 0% 0% 0% 0% - - - - - - - -
J-089 - - - - - - - - - - 0% - - - - - - - -
J-090 - - - - - - - - - - 0% - - - - - - - -
J-091 - - - - - - - - - - 0% - - - - - - - -
J-092 - - - - - - - - - - 0% - - - - - - - -
J-093 - - - - - - - - - - 0% - - - - - - - -
J-094 - - - - - - - - - - 0% - - - - - - - -
J-095 - - - - - - - - - - 0% - - - - - - - -
J-096 - - 0% 0% 0% 0% 0% 0% 0% 0% 0% - - - - - - - -
J-097 7,184,499 7.184 0% 1% 0% 0% 2% 12% 0% 85% 100% - 0.07 - - 0.16 0.87 - 6.08
J-Cn-Ext-1 - - - - - - - - - - 0% - - - - - - - -
J-CN-Ext-2 - - - - - - - - - - 0% - - - - - - - -
J-EXT-1 - - - - - - - - - - 0% - - - - - - - -
J-EXT-2 750,673 0.751 80% 1% 0% 8% 7% 0% 0% 3% 100% 0.60 0.01 - 0.06 0.06 - - 0.02
J-EXT-3 - - - - - - - - - - 0% - - - - - - - -
J-EXT-4 - - - - - - - - - - 0% - - - - - - - -
J-EXT-5 - - - - - - - - - - 0% - - - - - - - -
J-EXT-6 - - - - - - - - - - 0% - - - - - - - -
J-EXT-7 - - - - - - - - - - 0% - - - - - - - -
J-EXT-8 890,320 0.890 47% 10% 0% 27% 16% 0% 0% 0% 100% 0.42 0.09 - 0.24 0.14 - - -
J-EXT-9 - - - - - - - - - - 0% - - - - - - - -
J-EXT-10 - - - - - - - - - - 0% - - - - - - - -
J-EXT-11 491,368 0.491 3% 0% 0% 62% 3% 0% 0% 33% 100% 0.01 - - 0.30 0.01 - - 0.16
J-EXT-12 - - - - - - - - - - 0% - - - - - - - -
J-EXT-13 890,827 0.891 81% 0% 0% 8% 10% 1% 0% 0% 100% 0.72 - - 0.07 0.09 0.01 0.00 -
- - - - - - - - - - 0% - - - - - - - -
78,444,837 72 Sum 23.78 1.14 0.40 0.85 6.93 4.56 2.97 31.40

33% 2% 1% 1% 10% 6% 4% 44%


OROMIA FOUR TOWNS WATER SUPPLY PROJECT
AMBO DETAIL DESIGN
APPENDIX B-1; BASIS FOR DEMAND COMPUTATION

Table B-2:- Ambo Distribution


Year Mains
2029 Water WD/km²
Demand at Nodes
Served By Node

227 211 668 635 78 59 243 0 Demand


R S H CO AD Ind JU FG (m³/d) l/s (m³/d) l/s
Node number Demand (m³/day) Sum Adjusted

J-001 - - - - - - - - - - - -
J-002 - - - - - - - - - - - -
J-003 - - - - - - - - - - - -
J-004 - - - - - - - - - - - -
J-005 - - - - - - - - - - - -
J-006 545 - - - - - 336 - 880.67 10.19 880.67 10.19
J-007 - - - - - - - - - - - -
J-008 - - - - - - - - - - - -
J-009 - - - - - - - - - - - -
J-010 - - - - - - - - - - - -
J-011 - - - - - - - - - - - -
J-012 - - - - - - - - - - - -
J-013 - - - - - - - - - - - -
J-014 - - - - - - - - - - - -
J-015 - - - - - - - - - - - -
J-016 - - - - - - - - - - - -
J-017 - - - - - - - - - - - -
J-018 102 - - - 9 42 - - 152.19 1.76 152.19 1.76
J-019 - - - - - - - - - - - -
J-020 - - - - - - - - - - - -
J-021 - - - - - - - - - - - -
J-022 627 1 - - 171 - - - 799.35 9.25 799.35 9.25
J-023 - - - - - - - - - - - -
J-024 241 - - - 14 7 - - 261.73 3.03 261.73 3.03
J-025 176 - - - - - - - 175.80 2.03 175.80 2.03
J-026 - - - - - - - - - - - -
J-027 - - - - - - - - - - - -
J-028 210 9 - - 74 - - - 293.70 3.40 293.70 3.40
J-029 - - - - - - - - - - - -
J-030 - - - - - - - - - - - -
J-031 93 11 33 - - - - - 137.25 1.59 137.25 1.59
J-032 - - - - - - - - - - - -
J-033 - - - - - - - - - - - -
J-034 154 30 - - 61 - - - 244.49 2.83 244.49 2.83
J-035 - - - - - - - - - - - -
J-036 - - - - - - - - - - - -
J-037 - - - - - - - - - - - -
J-038 - - - - - - - - - - - -
J-039 - - - - - - - - - - - -
J-040 1,167 25 54 - 130 27 175 - 1,577.20 18.25 1,577.20 18.25
J-041 - - - - - - - - - - - -
J-042 - - - - - - - - - - - -
J-043 - - - - - - - - - - - -
J-044 - - - - - - - - - - - -
J-045 - - - - - - - - - - - -
J-046 - - - - - - - - - - - -
J-047 152 19 - 93 5 - - - 268.89 3.11 268.89 3.11
J-048 119 19 - - - - - - 137.37 1.59 137.37 1.59
OROMIA FOUR TOWNS WATER SUPPLY PROJECT
AMBO DETAIL DESIGN
APPENDIX B-1; BASIS FOR DEMAND COMPUTATION

Table B-2:- Ambo Distribution


Year Mains
2029 Water WD/km²
Demand at Nodes
Served By Node

227 211 668 635 78 59 243 0 Demand


R S H CO AD Ind JU FG (m³/d) l/s (m³/d) l/s
Node number Demand (m³/day) Sum Adjusted
J-049 - - - - - - - - - - - -
J-050 - - - - - - - - - - - -
J-051 - - - - - - - - - - - -
J-052 - - - - - - - - - - - -
J-053 - - - - - - - - - - - -
J-054 - - - - - - - - - - - -
J-055 - - - - - - - - - - - -
J-056 226 - - - - 7 - - 233.11 2.70 233.11 2.70
J-057 - - - - - - - - - - - -
J-058 - - - - - - - - - - - -
J-059 124 - - - 3 12 - - 138.57 1.60 138.57 1.60
J-060 - - - - - - - - - - - -
J-061 - - - - - - - - - - - -
J-062 - - - - - - - - - - - -
J-063 - - - - - - - - - - - -
J-064 - - - - - - - - - - - -
J-065 - - - - - - - - - - - -
J-066 - - - - - - - - - - - -
J-067 214 73 - - 11 21 - - 319.05 3.69 319.05 3.69
J-068 447 13 - - 17 33 - - 510.02 5.90 510.02 5.90
J-069 198 - - - 9 68 - - 274.82 3.18 274.82 3.18
J-070 - - - - - - - - - - - -
J-071 - - - - - - - - - - - -
J-072 - - - - - - - - - - - -
J-073 205 6 183 15 1 1 209 - 618.11 7.15 618.11 7.15
J-074 - - - - - - - - - - - -
J-075 - - - - - - - - - - - -
J-076 - - - - - - - - - - - -
J-077 - - - - - - - - - - - -
J-078 - - - - - - - - - - - -
J-079 - - - - - - - - - - - -
J-080 - - - - - - - - - - - -
J-081 - - - - - - - - - - - -
J-082 - - - - - - - - - - - -
J-083 - - - - - - - - - - - -
J-084 - - - - - - - - - - - -
J-085 - - - - - - - - - - - -
J-086 - - - - - - - - - - - -
J-087 - - - - - - - - - - - -
J-088 - - - - - - - - - - - -
J-089 - - - - - - - - - - - -
J-090 - - - - - - - - - - - -
J-091 - - - - - - - - - - - -
J-092 - - - - - - - - - - - -
J-093 - - - - - - - - - - - -
J-094 - - - - - - - - - - - -
J-095 - - - - - - - - - - - -
OROMIA FOUR TOWNS WATER SUPPLY PROJECT
AMBO DETAIL DESIGN
APPENDIX B-1; BASIS FOR DEMAND COMPUTATION

Table B-2:- Ambo Distribution


Year Mains
2029 Water WD/km²
Demand at Nodes
Served By Node

227 211 668 635 78 59 243 0 Demand


R S H CO AD Ind JU FG (m³/d) l/s (m³/d) l/s
Node number Demand (m³/day) Sum Adjusted
J-096 - - - - - - - - - - - -
J-097 - 14 - - 13 52 - - 78.60 0.91 78.60 0.91
J-Cn-Ext-1 - - - - - - - - - - - -
J-CN-Ext-2 - - - - - - - - - - - -
J-EXT-1 - - - - - - - - - - - -
J-EXT-2 137 2 - 40 4 - - - 183.39 2.12 183.39 2.12
J-EXT-3 - - - - - - - - - - - -
J-EXT-4 - - - - - - - - - - - -
J-EXT-5 - - - - - - - - - - - -
J-EXT-6 - - - - - - - - - - - -
J-EXT-7 - - - - - - - - - - - -
J-EXT-8 96 18 - 154 11 - - - 278.74 3.23 278.74 3.23
J-EXT-9 - - - - - - - - - - - -
J-EXT-10 - - - - - - - - - - - -
J-EXT-11 3 - - 193 1 - - - 197.24 2.28 197.24 2.28
J-EXT-12 - - - - - - - - - - - -
J-EXT-13 164 - - 44 7 0 1 - 215.76 2.50 215.76 2.50

7,976.06 92.32 7,976.06 92.29


7,976.06
1.00
OROMIA FOUR TOWNS WATER SUPPLY PROJECT
AMBO DETAIL DESIGN
APPENDIX B-1; BASIS FOR DEMAND COMPUTATION

WATERCAD
HAESTED METHOD

Version 6.5
SUMMARY OF ORIGIAL DATA

Date : October, 2010


STATUS CODE: XX -CLOSED PIPE

Water Supply Mains - Ambo Town


Table A1-33:- PIPELIE IPUT DATA Year : 2029
ode ames Length Diameter Roughness Remark
Pipe ame ode 1 ode 2 (m) (mm) Coeff.
GWM-1, DCI 450mm
T-1 J-001 151.79 450 120 Fe-2011
GWM-2, DCI 450mm
J-001 J-002 67.06 450 120 Fe-2011
GWM-3, DCI 450mm
J-002 J-003 108.51 450 120 Fe-2011
GWM-4, DCI 450mm
J-003 J-004 113.69 450 120 Fe-2011
GWM-5, DCI 450mm
J-004 J-005 306.32 450 120 Fe-2011
GWM-6, DCI 450mm
J-005 J-006 317.6 450 120 Fe-2011
GWM-7, DCI 450mm
J-006 J-007 1,539.24 450 120 Fe-2011
GWM-8, DCI 400mm
J-007 J-008 235.61 400 120 Fe-2011
GWM-9, DCI 400mm
J-008 J-009 220.68 400 120 Fe-2011
GWM-10, DCI J-009
400mm J-010 481.58 400 120 Fe-2011
GWM-11, DCI J-010
400mm J-011 123.44 400 120 Fe-2011
GWM-12, DCI J-011
400mm J-012 175.56 400 120 Fe-2011
GWM-13, DCI J-012
400mm J-013 48.77 400 120 Fe-2011
GWM-14, DCI J-013
400mm J-014 102.11 400 120 Fe-2011
GWM-15, DCI J-014
400mm J-015 198.42 400 120 Fe-2011
GWM-16, DCI J-015
400mm T-2 43.59 400 120 Fe-2011
P-Conn T-2 T-3 11.89 250 120 Fe-2011
EXT-1 T-3 J-EXT-1 37.19 250 130 PVC-2011
EXT-2 J-EXT-1 J-EXT-2 69.19 250 130 PVC-2011
EXT-3 J-EXT-2 J-EXT-3 539.8 250 130 PVC-2011
EXT-4 J-EXT-3 J-EXT-4 86.56 250 130 PVC-2011
EXT-5 J-EXT-4 J-EXT-5 43.59 250 130 PVC-2011
EXT-6 J-EXT-5 J-EXT-6 70.41 250 130 PVC-2011
EXT-7 J-EXT-6 J-Cn-Ext-1 221.89 250 130 PVC-2011
EXT-8 J-Cn-Ext-1 J-EXT-7 252.98 200 130 PVC-2011
EXT-9 J-EXT-7 J-EXT-8 344.42 200 130 PVC-2011
EXT-10 J-EXT-8 J-EXT-9 252.37 200 130 PVC-2011
EXT-11 J-EXT-9 J-EXT-10 334.67 200 130 PVC-2011
EXT-12 J-EXT-10 J-EXT-11 660.5 150 130 PVC-2011
EXT-13 J-EXT-11 J-EXT-12 259.08 150 130 PVC-2011
EXT-14 J-EXT-12 J-EXT-13 522.73 150 130 PVC-2011
EXT-15 J-EXT-13 J-CN-Ext-2 121.31 150 130 PVC-2011
ACU-01 J-CN-Ext-2 J-085 353.57 200 130 PVC-2011
ACU-02 J-085 J-084 596.49 200 130 PVC-2011
ACU-03 J-083 J-084 864.72 200 130 PVC-2011
GR-01 J-083 J-086 160.02 100 130 PVC-2011
GR-02 J-086 J-087 715.67 100 130 PVC-2011
GR-03 J-087 J-088 122.22 100 130 PVC-2011
GR-04 J-088 J-089 104.85 100 130 PVC-2011
GR-05 J-089 J-090 458.72 100 130 PVC-2011
GR-06 J-090 J-091 80.16 80 130 PVC-2011
GR-07 J-091 J-092 89.92 80 130 PVC-2011
GR-08 J-092 J-093 114.6 80 130 PVC-2011
GR-09 J-093 J-094 314.86 80 130 PVC-2011
GR-10 J-094 J-095 743.41 80 130 PVC-2011
GR-11 J-095 J-096 181.05 80 130 PVC-2011
GR-12 J-096 J-097 568.45 80 130 PVC-2011
AR-01 J-008 J-034 280.11 250 130 PVC-2011
AR-02 J-034 J-035 520.9 250 130 PVC-2011
AR-03 J-035 J-036 1,050.34 250 130 PVC-2011
AR-04 J-036 J-037 331.01 250 130 PVC-2011
AR-05 J-037 J-038 562.66 250 130 PVC-2011
AR-06 J-038 J-039 75.9 250 130 PVC-2011
AR-07 J-039 J-040 663.55 250 130 PVC-2011
OROMIA FOUR TOWNS WATER SUPPLY PROJECT
AMBO DETAIL DESIGN
APPENDIX B-1; BASIS FOR DEMAND COMPUTATION

Water Supply Mains - Ambo Town


Table A1-33:- PIPELIE IPUT DATA Year : 2029
ode ames Length Diameter Roughness Remark
Pipe ame ode 1 ode 2 (m) (mm) Coeff.
AR-08 J-040 J-041 438.3 250 130 PVC-2011
AR-09 J-041 J-042 300.53 250 130 PVC-2011
HS-01 J-042 J-055 8.53 200 130 PVC-2011
HS-02 J-055 J-056 346.86 200 130 PVC-2011
HS-03 J-056 J-057 1,098.50 200 130 PVC-2011
HS-04 J-057 J-058 12.5 200 130 PVC-2011
HS-05 J-058 J-059 37.19 200 130 PVC-2011
HS-06 J-059 J-060 16.15 200 130 PVC-2011
HS-07 J-060 J-061 485.24 200 130 PVC-2011
HS-08 J-061 J-062 423.98 200 130 PVC-2011
HS-09 J-062 J-063 291.08 200 130 PVC-2011
HS-10 J-063 J-064 316.69 200 130 PVC-2011
ACU-04 J-064 J-082 431.9 150 130 PVC-2011
ACU-05 J-082 J-081 402.64 150 130 PVC-2011
ACU-06 J-081 J-080 348.08 150 130 PVC-2011
ACU-07 J-080 J-079 266.09 150 130 PVC-2011
ACU-08 J-079 J-078 58.83 150 130 PVC-2011
ACU-09 J-078 J-077 82.91 150 130 PVC-2011
ACU-10 J-077 J-076 74.07 150 130 PVC-2011
ACU-11 J-076 J-075 381.00 150 130 PVC-2011
ACU-12 J-075 J-074 177.39 150 130 PVC-2011
ACU-13 J-074 J-073 384.35 150 130 PVC-2011
ACU-14 J-073 J-072 920.8 150 130 PVC-2011
ACU-15 J-072 J-071 420.93 150 130 PVC-2011
ACU-16 J-071 J-070 193.24 200 130 PVC-2011
ACU-17 J-070 J-069 510.24 200 130 PVC-2011
ACU-18 J-069 J-068 388.62 200 130 PVC-2011
HS-11 J-064 J-065 178.92 200 130 PVC-2011
HS-12 J-065 J-066 201.17 200 130 PVC-2011
HS-13 J-066 J-067 78.33 200 130 PVC-2011
CNT-01 J-014 J-043 488.59 200 130 PVC-2011
CNT-02 J-043 J-044 188.06 200 130 PVC-2011
CNT-03 J-044 J-045 381.91 200 130 PVC-2011
CNT-04 J-045 J-046 87.78 200 130 PVC-2011
CNT-05 J-046 J-047 364.24 200 130 PVC-2011
CNT-06 J-047 J-048 238.05 200 130 PVC-2011
CNT-07 J-048 J-049 1,263.70 200 130 PVC-2011
CNT-08 J-049 J-050 223.42 150 130 PVC-2011
CNT-09 J-050 J-051 410.26 100 130 PVC-2011
CNT-10 J-051 J-052 65.23 100 130 PVC-2011
CNT-11 J-052 J-053 208.48 100 130 PVC-2011
CNT-12 J-053 J-054 382.83 100 130 PVC-2011
CNT-13 J-054 J-042 200.56 100 130 PVC-2011
ES-01 J-008 J-016 206.65 250 130 PVC-2011
ES-02 J-016 J-017 15.54 250 130 PVC-2011
ES-03 J-017 J-018 1,023.21 250 130 PVC-2011
ES-04 J-018 J-033 1,513.33 200 130 PVC-2011
ES-05 J-032 J-033 142.95 200 130 PVC-2011
ES-06 J-031 J-032 566.93 200 130 PVC-2011
ES-07 J-030 J-031 252.68 200 130 PVC-2011
ES-08 J-029 J-030 71.63 200 130 PVC-2011
ES-09 J-028 J-029 536.14 200 130 PVC-2011
ES-10 J-027 J-028 249.33 200 130 PVC-2011
ES-11 J-026 J-027 833.63 200 130 PVC-2011
ES-12 J-026 J-025 389.53 200 130 PVC-2011
ES-13 J-023 J-024 668.12 250 130 PVC-2011
ES-14 J-018 J-023 831.49 250 130 PVC-2011
ES-15 J-018 J-019 997.92 250 130 PVC-2011
ES-16 J-019 J-020 151.49 250 130 PVC-2011
ES-17 J-020 J-021 99.36 250 130 PVC-2011
ES-18 J-021 J-022 147.22 250 130 PVC-2011
OROMIA FOUR TOWNS WATER SUPPLY PROJECT
AMBO DETAIL DESIGN
APPENDIX B-1; BASIS FOR DEMAND COMPUTATION

Water Supply Mains - Ambo Town


Note: 1- Peak Factor of 2.04 has been used
Table A1-34:- ODE DATA Year: 2029
External Junction External
ode ame ode Title Demand Elevation Grade
(l/s) (m) (m)
J-001 0 2,245.00
J-002 0 2,240.00
J-003 0 2,230.00
J-004 0 2,222.00
J-005 0 2,209.00
J-006 0 2,202.50
J-007 0 2,184.60
J-008 0 2,179.90
J-009 0 2,177.00
J-010 0 2,172.50
J-011 0 2,169.10
J-012 0 2,167.40
J-013 0 2,166.60
J-014 0 2,164.90
J-015 0 2,164.30
J-016 0 2,183.80
J-017 0 2,184.00
J-018 1.6 2,169.00
J-019 18.35 2,187.50
J-023 0 2,156.70
J-024 5.39 2,159.00
J-025 5.39 2,143.80
J-026 0 2,142.50
J-027 0 2,131.50
J-028 3.48 2,117.40
J-029 1.45 2,132.40
J-030 0 2,131.80
J-031 0 2,113.70
J-032 0 2,151.80
J-033 0 2,155.50
J-034 2.41 2,175.50
J-035 0 2,173.40
J-036 9.64 2,176.10
J-037 0 2,171.00
J-038 0 2,128.30
J-039 0 2,126.70
J-040 7.08 2,160.50
J-041 0 2,170.70
J-042 0 2,158.90
J-043 1.33 2,157.70
J-044 0.88 2,152.70
J-045 0 2,143.30
J-046 0 2,140.80
J-047 1.56 2,131.50
J-048 1.39 2,122.00
J-049 1.47 2,110.50
J-050 1.17 2,113.50
J-051 1.17 2,117.20
J-052 0 2,129.70
J-053 0 2,129.60
J-054 0 2,148.10
J-055 3.59 2,134.60
J-056 1.42 2,071.70
J-057 0 2,079.30
J-058 0 2,108.70
J-059 0 2,104.00
J-060 0 2,149.30
J-061 0 2,113.20
J-062 0 2,106.30
J-063 5.99 2,117.50
J-064 5.21 2,078.60
J-065 2.89 2,055.70
J-066 0 2,052.50
J-067 0 2,047.50
J-068 0 2,013.40
J-069 7.49 2,003.60
J-070 0 1,987.00
J-071 0 1,975.00
J-072 0 2,035.00
J-073 0 2,043.40
J-074 0 2,058.40
J-075 0 2,069.10
J-076 0 2,112.00
J-077 0 2,129.50
J-078 0 2,136.00
J-079 0 2,111.10
J-080 0 2,068.00
J-081 0 2,074.90
J-082 0 2,112.00
J-083 0 2,086.10
J-084 0 2,086.90
J-085 0 2,094.10
J-086 0 2,052.00
J-087 0 2,045.60
J-088 0 2,033.50
J-089 0 2,002.70
J-090 0 1,992.90
J-091 0 1,970.10
J-092 0 1,952.00
J-093 5.39 1,922.00
OROMIA FOUR TOWNS WATER SUPPLY PROJECT
AMBO DETAIL DESIGN
APPENDIX B-1; BASIS FOR DEMAND COMPUTATION

Table A1-34:- ODE DATA Year: 2029


External Junction External
ode ame ode Title Demand Elevation Grade
(l/s) (m) (m)
J-Cn-Ext-1 0 2,139.90
J-CN-Ext-2 0 2,089.60
J-EXT-1 0 2,164.10
J-EXT-2 1.92 2,162.40
J-EXT-3 0 2,157.10
J-EXT-4 0 2,155.80
J-EXT-5 0 2,154.20
J-EXT-6 0 2,152.00
J-EXT-7 0 2,122.50
J-EXT-8 3.06 2,132.30
J-EXT-9 0 2,127.50
J-EXT-10 0 2,116.90
J-EXT-11 2.32 2,086.30
J-EXT-12 0 2,084.20
J-EXT-13 2.25 2,087.40
T-1 CWT@TP 2,260.0
T-2 existing 2,166.0
T-3 NEW nearby existing 2,166.0
OROMIA FOUR TOWNS WATER SUPPLY PROJECT
AMBO DETAIL DESIGN
APPENDIX B-1; BASIS FOR DEMAND COMPUTATION

SUMMARY OF RESULTS
SIMULATION DESCRIPTION: Peak Hour
Water Supply Mains - Ambo Town
APPEDIX D:- P I P E L I  E R E S U L T S Year: 2029
Velocit
Pipe ode ames Length Dia Flow rate Head loss y HL/1000 Remark
ame ode 1 ode 2 (m) (mm) HWC (l/s) (m) (m/s) (m/m) Mat/Year Velocity
GWM-1, T-1
DCI 450mm
J-001 151.79 450 120 573.28 6.46 3.6 22.63 Fe-2011 OK!
GWM-2, J-001
DCI 450mm
J-002 67.06 450 120 573.28 4.22 3.6 22.63 Fe-2011 OK!
GWM-3, J-002
DCI 450mm
J-003 108.51 450 120 573.28 2.68 3.6 22.63 Fe-2011 OK!
GWM-4, J-003
DCI 450mm
J-004 113.69 450 120 573.28 4.04 3.6 22.63 Fe-2011 OK!
GWM-5, J-004
DCI 450mm
J-005 306.32 450 120 573.28 9.07 3.6 22.63 Fe-2011 OK!
GWM-6, J-005
DCI 450mm
J-006 317.6 450 120 573.28 8.64 3.6 22.63 Fe-2011 OK!
GWM-7, J-006
DCI 450mm
J-007 1539.2 450 120 555.61 39.75 3.49 21.36 Fe-2011 OK!
GWM-8, J-007
DCI 400mm
J-008 235.61 450 120 555.61 6.08 3.49 21.36 Fe-2011 OK!
GWM-9, J-008
DCI 400mm
J-009 220.68 450 120 436.96 3.83 2.75 13.69 Fe-2011 OK!
GWM-10,J-009
DCI 400mm
J-010 481.58 450 120 436.96 8.36 2.75 13.69 Fe-2011 OK!
GWM-11,J-010
DCI 400mm
J-011 123.44 450 120 436.96 2.14 2.75 13.69 Fe-2011 OK!
GWM-12,J-011
DCI 400mm
J-012 175.56 450 120 436.96 3.05 2.75 13.69 Fe-2011 OK!
GWM-13,J-012
DCI 400mm
J-013 48.77 450 120 436.96 0.85 2.75 13.69 Fe-2011 OK!
GWM-14,J-013
DCI 400mm
J-014 102.11 450 120 436.96 1.77 2.75 13.69 Fe-2011 OK!
GWM-15,J-014
DCI 400mm
J-015 198.42 300 120 419.34 3.32 5.93 91.4 Fe-2011 OK!
GWM-16,J-015
DCI 400mm
T-2 43.59 300 120 419.34 0.73 5.93 91.4 Fe-2011 OK!
P-Conn T-2 T-3 11.89 250 120 248.23 1 5.06 84.12 Fe-2011 OK!
EXT-1 T-3 J-EXT-1 37.19 250 130 25.46 0.05 0.52 1.24 PVC-2011 OK!
EXT-2 J-EXT-1 J-EXT-2 69.19 250 130 25.46 0.09 0.52 1.24 PVC-2011 OK!
EXT-3 J-EXT-2 J-EXT-3 539.8 250 130 22.2 0.52 0.45 0.96 PVC-2011 OK!
EXT-4 J-EXT-3 J-EXT-4 86.56 250 130 22.2 0.08 0.45 0.96 PVC-2011 OK!
EXT-5 J-EXT-4 J-EXT-5 43.59 250 130 22.2 0.04 0.45 0.96 PVC-2011 OK!
EXT-6 J-EXT-5 J-EXT-6 70.41 250 130 22.2 0.07 0.45 0.96 PVC-2011 OK!
EXT-7 J-EXT-6 J-Cn-Ext-1221.89 250 130 22.2 0.21 0.45 0.96 PVC-2011 OK!
EXT-8 J-Cn-Ext-1
J-EXT-7 252.98 200 130 22.2 0.72 0.71 2.85 PVC-2011 OK!
EXT-9 J-EXT-7 J-EXT-8 344.42 200 130 22.2 0.98 0.71 2.85 PVC-2011 OK!
EXT-10 J-EXT-8 J-EXT-9 252.37 200 130 16.97 0.44 0.54 1.73 PVC-2011 OK!
EXT-11 J-EXT-9 J-EXT-10334.67 200 130 16.97 0.58 0.54 1.73 PVC-2011 OK!
EXT-12 J-EXT-10J-EXT-11 660.5 150 130 16.97 4.65 0.96 7.04 PVC-2011 OK!
EXT-13 J-EXT-11J-EXT-12259.08 150 130 13.02 1.12 0.74 4.31 PVC-2011 OK!
EXT-14 J-EXT-12J-EXT-13522.73 150 130 13.02 2.25 0.74 4.31 PVC-2011 OK!
EXT-15 J-EXT-13J-CN-Ext-2
121.31 150 130 9.18 0.27 0.52 2.26 PVC-2011 OK!
ACU-01 J-CN-Ext-2
J-085 353.57 200 130 9.18 0.15 0.29 0.43 PVC-2011 OK!
ACU-02 J-085 J-084 596.49 200 130 9.18 0.25 0.29 0.43 PVC-2011 OK!
ACU-03 J-083 J-084 864.72 200 130 9.18 0.37 0.29 0.43 PVC-2011 OK!
GR-01 J-083 J-086 160.02 100 130 9.18 2 1.17 12.48 PVC-2011 OK!
GR-02 J-086 J-087 715.67 100 130 9.18 8.93 1.17 12.48 PVC-2011 OK!
GR-03 J-087 J-088 122.22 100 130 9.18 1.52 1.17 12.48 PVC-2011 OK!
GR-04 J-088 J-089 104.85 100 130 9.18 1.31 1.17 12.48 PVC-2011 OK!
GR-05 J-089 J-090 458.72 100 130 9.18 5.72 1.17 12.48 PVC-2011 OK!
GR-06 J-090 J-091 80.16 80 130 9.18 1 1.17 12.48 PVC-2011 OK!
GR-07 J-091 J-092 89.92 80 130 9.18 1.12 1.17 12.48 PVC-2011 OK!
GR-08 J-092 J-093 114.6 80 130 9.18 1.43 1.17 12.48 PVC-2011 OK!
GR-09 J-093 J-094 314.86 80 130 9.18 3.93 1.17 12.48 PVC-2011 OK!
GR-10 J-094 J-095 743.41 80 130 9.18 9.28 1.17 12.48 PVC-2011 OK!
GR-11 J-095 J-096 181.05 80 130 9.18 2.26 1.17 12.48 PVC-2011 OK!
GR-12 J-096 J-097 568.45 80 130 9.18 7.09 1.17 12.48 PVC-2011 OK!
AR-01 J-008 J-034 280.11 250 130 75.81 2.01 1.54 7.17 PVC-2011 OK!
AR-02 J-034 J-035 520.9 250 130 71.71 3.37 1.46 6.47 PVC-2011 OK!
AR-03 J-035 J-036 1050.3 250 130 71.71 6.8 1.46 6.47 PVC-2011 OK!
AR-04 J-036 J-037 331.01 250 130 55.29 1.32 1.13 4 PVC-2011 OK!
AR-05 J-037 J-038 562.66 250 130 55.29 2.25 1.13 4 PVC-2011 OK!
AR-06 J-038 J-039 75.9 250 130 55.29 0.3 1.13 4 PVC-2011 OK!
AR-07 J-039 J-040 663.55 250 130 55.29 2.65 1.13 4 PVC-2011 OK!
AR-08 J-040 J-041 438.3 250 130 43.23 1.11 0.88 2.54 PVC-2011 OK!
AR-09 J-041 J-042 300.53 250 130 43.23 0.76 0.88 2.54 PVC-2011 OK!
OROMIA FOUR TOWNS WATER SUPPLY PROJECT
AMBO DETAIL DESIGN
APPENDIX B-1; BASIS FOR DEMAND COMPUTATION

Water Supply Mains - Ambo Town


APPEDIX D:- P I P E L I  E R E S U L T S Year: 2029
Velocit
Pipe ode ames Length Dia Flow rate Head loss y HL/1000 Remark
ame ode 1 ode 2 (m) (mm) HWC (l/s) (m) (m/s) (m/m) Mat/Year Velocity
HS-01 J-042 J-055 8.53 200 130 45.31 0.07 1.44 8.2 PVC-2011 OK!
HS-02 J-055 J-056 346.86 200 130 45.31 2.84 1.44 8.2 PVC-2011 OK!
HS-03 J-056 J-057 1098.5 200 130 39.19 6.89 1.25 6.27 PVC-2011 OK!
HS-04 J-057 J-058 12.5 200 130 39.19 0.08 1.25 6.28 PVC-2011 OK!
HS-05 J-058 J-059 37.19 200 130 39.19 0.23 1.25 6.27 PVC-2011 OK!
HS-06 J-059 J-060 16.15 200 130 36.76 0.09 1.17 5.56 PVC-2011 OK!
HS-07 J-060 J-061 485.24 200 130 36.76 2.7 1.17 5.57 PVC-2011 OK!
HS-08 J-061 J-062 423.98 200 130 36.76 2.36 1.17 5.57 PVC-2011 OK!
HS-09 J-062 J-063 291.08 200 130 36.76 1.62 1.17 5.57 PVC-2011 OK!
HS-10 J-063 J-064 316.69 200 130 36.76 1.76 1.17 5.57 PVC-2011 OK!
ACU-04 J-064 J-082 431.9 150 130 26.56 5.35 1.5 12.38 PVC-2011 OK!
ACU-05 J-082 J-081 402.64 150 130 26.56 4.99 1.5 12.38 PVC-2011 OK!
ACU-06 J-081 J-080 348.08 150 130 26.56 4.31 1.5 12.38 PVC-2011 OK!
ACU-07 J-080 J-079 266.09 150 130 26.56 3.3 1.5 12.38 PVC-2011 OK!
ACU-08 J-079 J-078 58.83 150 130 26.56 0.73 1.5 12.38 PVC-2011 OK!
ACU-09 J-078 J-077 82.91 150 130 26.56 1.03 1.5 12.38 PVC-2011 OK!
ACU-10 J-077 J-076 74.07 150 130 26.56 0.92 1.5 12.39 PVC-2011 OK!
ACU-11 J-076 J-075 381 150 130 26.56 4.72 1.5 12.38 PVC-2011 OK!
ACU-12 J-075 J-074 177.39 150 130 26.56 2.2 1.5 12.38 PVC-2011 OK!
ACU-13 J-074 J-073 384.35 150 130 26.56 4.76 1.5 12.38 PVC-2011 OK!
ACU-14 J-073 J-072 920.8 150 130 13.79 3.39 0.78 3.68 PVC-2011 OK!
ACU-15 J-072 J-071 420.93 150 130 13.79 1.55 0.78 3.68 PVC-2011 OK!
ACU-16 J-071 J-070 193.24 200 130 13.79 0.18 0.44 0.91 PVC-2011 OK!
ACU-17 J-070 J-069 510.24 200 130 13.79 0.46 0.44 0.91 PVC-2011 OK!
ACU-18 J-069 J-068 388.62 200 130 8.87 0.16 0.28 0.4 PVC-2011 OK!
HS-11 J-064 J-065 178.92 200 130 10.2 0.09 0.32 0.52 PVC-2011 OK!
HS-12 J-065 J-066 201.17 200 130 10.2 0.1 0.32 0.52 PVC-2011 OK!
HS-13 J-066 J-067 78.33 200 130 10.2 0.04 0.32 0.52 PVC-2011 OK!
CNT-01 J-014 J-043 488.59 200 130 21.88 0.7 0.88 2.51 PVC-2011 OK!
CNT-02 J-043 J-044 188.06 200 130 19.62 0.21 0.56 1.43 PVC-2011 OK!
CNT-03 J-044 J-045 381.91 200 130 18.12 0.35 0.49 1.11 PVC-2011 OK!
CNT-04 J-045 J-046 87.78 200 130 18.12 0.08 0.44 0.91 PVC-2011 OK!
CNT-05 J-046 J-047 364.24 200 130 18.12 0.33 0.44 0.92 PVC-2011 OK!
CNT-06 J-047 J-048 238.05 200 130 15.46 0.15 0.44 0.91 PVC-2011 OK!
CNT-07 J-048 J-049 1263.7 200 130 13.1 0.5 0.36 0.62 PVC-2011 OK!
CNT-08 J-049 J-050 223.42 150 130 10.6 0.2 0.28 0.4 PVC-2011 OK!
CNT-09 J-050 J-051 410.26 100 130 8.6 1.28 0.36 0.87 PVC-2011 OK!
CNT-10 J-051 J-052 65.23 100 130 6.6 0.07 0.55 3.12 PVC-2011 OK!
CNT-11 J-052 J-053 208.48 100 130 6.6 0.21 0.3 1 PVC-2011 OK!
CNT-12 J-053 J-054 382.83 100 130 6.6 0.38 0.3 1 PVC-2011 OK!
CNT-13 J-054 J-042 200.56 100 130 6.6 0.2 0.3 1 PVC-2011 OK!
ES-01 J-008 J-016 206.65 250 130 43.11 0.52 0.88 2.52 PVC-2011 OK!
ES-02 J-016 J-017 15.54 250 130 43.11 0.04 0.88 2.52 PVC-2011 OK!
ES-03 J-017 J-018 1023.2 250 130 43.11 2.58 0.88 2.52 PVC-2011 OK!
ES-04 J-018 J-033 1513.3 200 130 17.58 2.15 0.56 1.42 PVC-2011 OK!
ES-05 J-032 J-033 142.95 200 130 17.58 0.2 0.56 1.42 PVC-2011 OK!
ES-06 J-031 J-032 566.93 200 130 17.58 0.81 0.56 1.42 PVC-2011 OK!
ES-07 J-030 J-031 252.68 200 130 17.58 0.36 0.56 1.42 PVC-2011 OK!
ES-08 J-029 J-030 71.63 200 130 17.58 0.1 0.56 1.42 PVC-2011 OK!
ES-09 J-028 J-029 536.14 200 130 15.12 0.58 0.48 1.07 PVC-2011 OK!
ES-10 J-027 J-028 249.33 200 130 9.18 0.11 0.29 0.43 PVC-2011 OK!
ES-11 J-026 J-027 833.63 200 130 9.18 0.36 0.29 0.43 PVC-2011 OK!
ES-12 J-026 J-025 389.53 200 130 9.18 0.17 0.29 0.43 PVC-2011 OK!
ES-13 J-023 J-024 668.12 250 130 9.18 0.28 0.29 0.43 PVC-2011 OK!
ES-14 J-018 J-023 831.49 250 130 9.18 0.35 0.29 0.43 PVC-2011 OK!
ES-15 J-018 J-019 997.92 250 130 13.61 0.3 0.28 0.3 PVC-2011 OK!
ES-16 J-019 J-020 151.49 250 130 13.61 0.05 0.28 0.3 PVC-2011 OK!
ES-17 J-020 J-021 99.36 250 130 13.61 0.03 0.28 0.3 PVC-2011 OK!
ES-18 J-021 J-022 147.22 250 130 13.61 0.04 0.28 0.3 PVC-2011 OK!
OROMIA FOUR TOWNS WATER SUPPLY PROJECT
AMBO DETAIL DESIGN
APPENDIX B-1; BASIS FOR DEMAND COMPUTATION

Water Supply Mains - Ambo Town


APPEDIX D:- E  D  O D E R E S U L T S Peak Hour Year: 2026
External Hydraulic ode Pressure ode
ode ame ode Title Demand Grade Elevation Head Pressure Remark
(l/s) (m) (m) (m) (kpa)
J-001 - - 2,267.89 2,245.00 10.09 100.9 OK!
J-002 - - 2,265.08 2,240.00 15.18 151.8 OK!
J-003 - - 2,263.30 2,230.00 28.9 289.0 OK!
J-004 - - 2,260.60 2,222.00 38.6 386.0 OK!
J-005 - - 2,254.56 2,209.00 45.56 455.6 OK!
J-006 - - 2,248.80 2,202.50 46.3 463.0 OK!
J-007 - - 2,222.65 2,184.60 38.05 380.5 OK!
J-008 - - 2,218.65 2,179.90 38.75 387.5 OK!
J-009 - - 2,216.35 2,177.00 39.35 393.5 OK!
J-010 - - 2,211.33 2,172.50 38.83 388.3 OK!
J-011 - - 2,210.04 2,169.10 40.94 409.4 OK!
J-012 - - 2,208.21 2,167.40 40.81 408.1 OK!
J-013 - - 2,207.70 2,166.60 41.1 411.0 OK!
J-014 - - 2,206.63 2,164.90 41.73 417.3 OK!
J-015 - - 2,174.30 2,164.30 10 100.0 OK!
J-016 - - 2,218.13 2,183.80 34.33 343.3 OK!
J-017 - - 2,218.09 2,184.00 34.09 340.9 OK!
J-018 - 1.60 2,215.51 2,169.00 46.51 465.1 OK!
J-019 - 18.35 2,215.21 2,187.50 27.41 274.1 OK!
J-023 - - 2,215.17 2,156.70 33.27 332.7 OK!
J-024 - 5.39 2,215.14 2,159.00 34.94 349.4 OK!
J-025 - 5.39 2,215.09 2,143.80 27.59 275.9 OK!
J-026 - - 2,215.39 2,142.50 58.69 586.9 OK!
J-027 - - 2,215.29 2,131.50 56.29 562.9 OK!
J-028 - 3.48 2,210.68 2,117.40 66.88 668.8 OK!
J-029 - 1.45 2,210.85 2,132.40 68.35 683.5 OK!
J-030 - - 2,211.21 2,131.80 79.71 797.1 OK!
J-031 - - 2,211.31 2,113.70 93.91 939.1 OK!
J-032 - - 2,211.89 2,151.80 79.49 794.9 OK!
J-033 - - 2,211.99 2,155.50 80.19 801.9 OK!
J-034 - 2.41 2,212.35 2,175.50 98.65 986.5 OK!
J-035 - - 2,213.15 2,173.40 61.35 613.5 OK!
J-036 - 9.64 2,213.36 2,176.10 57.86 578.6 OK!
J-037 - - 2,216.89 2,171.00 41.39 413.9 OK!
J-038 - - 2,213.95 2,128.30 40.55 405.5 OK!
J-039 - - 2,208.04 2,126.70 31.94 319.4 OK!
J-040 - 7.08 2,206.94 2,160.50 35.94 359.4 OK!
J-041 - - 2,205.07 2,170.70 76.77 767.7 OK!
J-042 - - 2,204.81 2,158.90 78.11 781.1 OK!
J-043 - 1.33 2,202.60 2,157.70 42.1 421.0 OK!
J-044 - 0.88 2,201.73 2,152.70 31.03 310.3 OK!
J-045 - - 2,201.13 2,143.30 42.23 422.3 OK!
J-046 - - 2,205.53 2,140.80 47.83 478.3 OK!
J-047 - 1.56 2,205.18 2,131.50 52.48 524.8 OK!
J-048 - 1.39 2,204.57 2,122.00 61.27 612.7 OK!
J-049 - 1.47 2,204.43 2,110.50 63.63 636.3 OK!
J-050 - 1.17 2,203.84 2,113.50 72.34 723.4 OK!
J-051 - 1.17 2,203.55 2,117.20 81.55 815.5 OK!
J-052 - - 2,202.41 2,129.70 91.91 919.1 OK!
J-053 - - 2,202.27 2,129.60 88.77 887.7 OK!
J-054 - - 2,202.09 2,148.10 84.89 848.9 OK!
J-055 - 3.59 2,202.02 2,134.60 72.32 723.2 OK!
J-056 - 1.42 2,201.78 2,071.70 72.18 721.8 OK!
J-057 - - 2,201.35 2,079.30 53.25 532.5 OK!
J-058 - - 2,201.06 2,108.70 42.46 424.6 OK!
J-059 - - 2,198.21 2,104.00 63.61 636.1 OK!
J-060 - - 2,191.33 2,149.30 115.63 1156.3 OK!
J-061 - - 2,191.25 2,113.20 116.35 1163.5 OK!
J-062 - - 2,191.02 2,106.30 119.32 1193.2 OK!
J-063 - 5.99 2,190.93 2,117.50 120.63 1206.3 OK!
J-064 - 5.21 2,188.22 2,078.60 108.92 1089.2 OK!
J-065 - 2.89 2,185.86 2,055.70 77.16 771.6 OK!
OROMIA FOUR TOWNS WATER SUPPLY PROJECT
AMBO DETAIL DESIGN
APPENDIX B-1; BASIS FOR DEMAND COMPUTATION

Water Supply Mains - Ambo Town


APPEDIX D:- E  D  O D E R E S U L T S Peak Hour Year: 2026
External Hydraulic ode Pressure ode
ode ame ode Title Demand Grade Elevation Head Pressure Remark
(l/s) (m) (m) (m) (kpa)
J-066 - - 2,184.24 2,052.50 80.24 802.4 OK!
J-067 - - 2,182.48 2,047.50 33.18 331.8 OK!
J-068 - - 2,182.39 2,013.40 69.19 691.9 OK!
J-069 - 7.49 2,182.28 2,003.60 75.98 759.8 OK!
J-070 - - 2,182.24 1,987.00 64.74 647.4 OK!
J-071 - - 2,144.46 1,975.00 65.86 658.6 OK!
J-072 - - 2,144.62 2,035.00 88.92 889.2 OK!
J-073 - - 2,145.08 2,043.40 92.58 925.8 OK!
J-074 - - 2,145.26 2,058.40 97.76 977.6 OK!
J-075 - - 2,146.80 2,069.10 133.4 1334.0 OK!
J-076 - - 2,150.19 2,112.00 146.59 1465.9 OK!
J-077 - - 2,154.95 2,129.50 167.95 1679.5 OK!
J-078 - - 2,157.15 2,136.00 182.15 1821.5 OK!
J-079 - - 2,161.87 2,111.10 126.87 1268.7 OK!
J-080 - - 2,162.78 2,068.00 119.38 1193.8 OK!
J-081 - - 2,163.81 2,074.90 105.41 1054.1 OK!
J-082 - - 2,164.54 2,112.00 95.44 954.4 OK!
J-083 - - 2,167.83 2,086.10 55.83 558.3 OK!
J-084 - - 2,172.14 2,086.90 42.64 426.4 OK!
J-085 - - 2,177.13 2,094.10 41.13 411.3 OK!
J-086 - - 2,153.35 2,052.00 42.25 422.5 OK!
J-087 - - 2,153.72 2,045.60 85.72 857.2 OK!
J-088 - - 2,153.98 2,033.50 79.08 790.8 OK!
J-089 - - 2,151.36 2,002.70 39.36 393.6 OK!
J-090 - - 2,142.43 1,992.90 56.33 563.3 OK!
J-091 - - 2,140.90 1,970.10 54 540.0 OK!
J-092 - - 2,139.60 1,952.00 45.5 455.0 OK!
J-093 - 5.39 2,133.87 1,922.00 81.87 818.7 OK!
J-Cn-Ext-1 - - 2,132.87 2,139.90 87.27 872.7 OK!
J-CN-Ext-2 - - 2,131.75 2,089.60 98.25 982.5 OK!
J-EXT-1 - - 2,130.32 2,164.10 127.62 1276.2 OK!
J-EXT-2 - 1.92 2,126.39 2,162.40 133.49 1334.9 OK!
J-EXT-3 - - 2,117.12 2,157.10 147.02 1470.2 OK!
J-EXT-4 - - 2,114.86 2,155.80 162.86 1628.6 OK!
J-EXT-5 - - 2,107.77 2,154.20 185.77 1857.7 OK!
J-EXT-6 - - 2,165.14 2,152.00 25.24 252.4 OK!
J-EXT-7 - - 2,154.13 2,122.50 64.53 645.3 OK!
J-EXT-8 - 3.06 2,166.15 2,132.30 2.05 20.5 Low pressure
J-EXT-9 - - 2,166.07 2,127.50 3.67 36.7 Low pressure
J-EXT-10 - - 2,165.55 2,116.90 8.45 84.5 OK!
J-EXT-11 - 2.32 2,165.47 2,086.30 9.67 96.7 OK!
J-EXT-12 - - 2,165.42 2,084.20 11.22 112.2 OK!
J-EXT-13 - 2.25 2,165.36 2,087.40 13.36 133.6 OK!
T-1 CWT@TP - 2,260.00
T-2 existing - 2,166.00
T-3 NEW nearby existing - 2,166.00