8. Accessory Units 8.1 Adjusting Die Height and Die Clamping Force 8.1.1 Goneral Descriptions Die height is adjusted by the die height adjust ploying @ hydraulic motor. When the DIE HEIGHT ADJ, selector sitch is set to “AUTO", die clamping force is regulated automaticaly. When the same switch is set to "MAN", manual operation is possible by means of ‘selector pushbutton switches for continuous and inching operations. ‘This paragraph describes the adjusting procedures when the DIE HEIGHT ADM. ssolactor switch is set to "MAN" 8:12 Specifications of Die Height Adjusting Unit (1). Die height adjusting speed: 50 ~150 mm/min. (2) Hydraulic motor: ME4100~C 81.3 Interlock Die height can be adjusted only when al conditions given below are satisfied. (1) The CYCLE key switch is set to "MAN" (2) The TIE BAR OPERATION selector switch is set to "OFF* (8) The DIE HEIGHT ADJ. selector switch is set to "MAN (4) Limit switches 1NLLS, 2NLLS, 1NFSW, 2NFSW, 1TILS and 2TILS are set ON. (8) The movable die platen is located between the die open end and [SLOW ‘SOFT] positon. (6) Make sure that the ejector return end, ‘STE96713 a4 aa8 ans ‘The die height adjusting unit is lubricated by means ofthe automat 316 “ @ Safety Devices To prevent the die clamping unt from moving beyond the die height adjusting range, the limit switch (OBLS) is provided at the backward end, For the forward end, the sensor LS output is recognized by TOSCAST to stop the dio clamping unit Lubrication lubricant unit ‘Adjustment of Die Height and Die Clamping Force Push the die against the fixed die platen Roughiy adjust the cie height adjusting unit to the die thickness, using the monitored value displayed on the TOSCAST screen, then clamp the dies to contact the movable die platen to the die. Mount the oles on the fxed and movable dle platens. ‘Set the movable die ejector plate, Repeat the die opering, die height adjustment and die clamping until a specified aie clamping force is obtained. ‘The die clamping force is displayed on the operation box and TOSCAST STE96713 8.2 Measurement and Adjustment of Die Paral 8.2.1 Measurement of Die Pat c Provide the folowing die block 1150 (horizontal) x 1200 (2) Provide the die clearance measuring devices such as inside micrometer and dial gage. Mount the die block, aligning it withthe fied die platen machine center. 1d impose a 10 % load on the die block by operating the die Start the pumps. adjusting ui by the load meter) (0.1 mm per 500 mm, or less (Factory-adlusted before shipment) STEOET13 8.2.2 Adjustment of Die Parallelism Ifthe measured result in Para. 8.2.1 above does not fall under the reference value, _agjust the parallelism in the following manner. gat (attached to the te-bar where the measured value (2) Star the pumps to open tho dies. (8) Stop the pumps and disconnect the idle gear cover ofthe de height adjusting unit (8) Push the solenoid valve push pin of the DGS1 dle height brake cet cylinder, Using a driver, to turn off the brake. With the push pin kept pressed, close the alr unit valve to remave the residual pressure. ‘When the hand is off the push pin, make sure thatthe brake cylinder is atthe OFF position (8) Except for the dle gear meshed withthe nut gear that requires adjustment, pull ‘out the other idle gears to such an extent that they are disengaged from respective nut gears. Use an attached idle gear remover. Hexagon socket head cap screw | lle gear shaft 20x 140 \ ( Y 4 — i ‘STE96719 (6) Start the pumps and open the die height high-speed regulating valve (C2G20) fof the LH unit (equipped on the lateral side ofthe link housing nor-operating side) by 0.1 tun irom the completely closed positon. (7) Set the ACC adjust switch (P-G MAX, equipped on the accumulator unit 4 (8) Push the die height low-speed advance solenoid (SOFSOL) push pin of the die height low-speed change-over solenoid valve (0626) by means of the criver (inching operation) to perform fine adjustment of the die height, Fine adjustment: 0.123 mmytooth (NEVER push the other solenoid valve push pins. (9) After the adjustment is finished, return the idle gears that were pulled out tothe previous condition and open the air unit valve, Make sure that the brake cylinder activates to turn on the brake. (10) Retum the die height high speed regulating valve (C2G20) to the normal opening (11) Sotthe AGC adjust switch (PC MAX) to “OFF (12) After repeating die clamping and ie opening 2 ~ 3 times, exert a 10 % load on the die block (13) Confirm the die paralleism according to Steps (6) and (6) of Para. 8.2.1. Flepeat Steps (1) to (12) above until the value falls under the specified range. (14) _Aftor making sure thatthe parallelism fas under the reference value, open the dies and stop the pumps. (15) Remove the idle gear remover and attach the idle gear cover instoad. Remove the measuring die block, then start the pumps. (16) Operate the dle height adjusting unit and make sure that it moves forward and backward smoothly. Now adjustment of die parallelism is finished. sTEg6713, 83 Tie-Bar IN/OUT Operation IN[OUT operation is performed by means of the selector switches the operation box. During the operation, the TIE BAR OPERATION Indicator lamp on the operation box iluninated. Do nat execute ather operation ‘while this lamp is tumed on. ‘After setting the DCM selector switch on the operation box to "MAN" and the DIE HEIGHT AUTO ADJ. selector switch to "OFF", observe the following procedures. ‘Nut ciamp opening operation is possible only when the movable die platen is located between the die open and and [DHILS} position. 8.31 T-Bar OUT (1) Make sur thatthe TIE BAR OPERATION selector switch is set to "OFF (2). Select the ti-bar OUT conslton by means ofthe TIE BAR SELECT switch, ° Start the hydraulic pumps. switch to “ON*. Then the TIE BAR, inated. (4) The TIE BAR OPERATION OPERATION indioator lam (8) The NUT selector switch to "SPLIT" and the LINER selactor switch to "OUT (©) Make sure that nut open and release are executed property (7) Tho TIE BAR selector switch to “OUT” and draw out the tie-hars to a predetermined positon. {8} Stop the hydraulic pumps. an [Rene ‘STE96713 a6 832 Tle-BariN through (6) of Para. 88.1 above. tual operation to set "TIE BAR before press to ‘and insert the tie-bars to the IN end, (3) Alter the tie-bars have been drawn in, set to TIE BAR NUT before press to the “ADVANCE” pushbutton (4) Make sure that nut clamp and securing are executed property. (6) The TIE BAR OPERATION selector switch to “OFF (6) Make sure that the TIE BAR OPERATION indicator lamp is tuned oft ‘STE96713 84 Load Met ee the Load Meter Mechanism.) Side B of sleeve © is pressed against the tie-bar hole face by spring @ through holder ©, ‘Side C of extonsion incicating bar by spring ©. pressed against the tie-ber hole face load "W" is exerted on the: and loaded surface A of the fxed dle platen, the to-bar elongates by ‘DI in tho section (4) Load "W" ean be obtained by this elongation "DI is measured by load sensor @ and load "W" is splayed in % on the operation box and TOSCAST soreen, precautions: ‘The maximum load MUST NOT exceed 100 %. ‘As optimal i impose a die clamping force larger than re sTE96713, Load Meter Mechanism ‘STE96719

You might also like