Caculo Cabaca – Cambutas Line is a 400kV overhead line with a length of 54km from Caculo
Cabaca Hydropower Plant, Cuanza Norte, Angola, to Cambutas, Kwanza North, Angola.
Description
Caculo Cabaca – Cambutas Line is an overhead line that will be operated by Rede Nacional
de Transporte de Electricidade. The line will carry alternating current (AC) through double
circuit cable.
Approximately $52.9m was financed by the authorities to undertake the construction works of
the project.
The development of the Caculo Cabaca – Cambutas Line project has been approved by the
Institute for Electricity Regulation.
The construction works on the Caculo Cabaca – Cambutas Line project were commenced in
2018 and commissioning is expected in 2025.