You are on page 1of 1

UNIT-4 HYDRAULIC GOVERNING CHARACTERISTICS

Note: 1) EHG to be isolated at Governing Rack using levers I) SVs, CRH NRVs, Extraction NRVs opening & closing to be checked
2) Test Valves of SVs & Extraction NRVs, CRH NRV
Lever to be closed while noting down CV a) SVs – SD kept at 40%. Opening & closing of SVs to be checked
characteristics using test valves
3) Ensure no hydraulic leak test is being carried out in b) CRH NRVs – HPSO Pr. 2.4 (Closing) 2.9 (Opening)
boiler super-heat line c) Extraction NRVs – IPSO Pr. set at 3.0 ksc & NRVs to be checked for
4) Ensure no air leak test is being carried out in boiler opening & closing using test valves
reheat line
5) Ensure IP Trimming device is in ON condition
6) OPERATE S.D. WHEEL FOR CHANGE IN ASO
II) Trimming device to be operated & checked
Pr. before operating Pr. after operating
PRESSURE
IPSO Pr. 5.0 4.1
III) Control Oil Pr.: -- / 6.7 ksc Oil Temp.: -- / 54 deg.C
4.35 Design
ASO 2.3 2.52 2.68 2.75 2.79 2.91 3.06 3.12 3.25 3.52 3.78 4.01 4.2 2009
4.32

2.5 2.79 3.0 3.15 3.50 3.75 4.1 4.48 5.0


HPSO 3.09 3.30 3.57 4.75 5.0
2.35 2.8 3.05 3.25 3.9 4.1 4.5 4.9 5.1

---- 2.50 3.18 3.66 4.76 5.0 5.0 5.0 5.0


IPSO 3.47 4.12 5.0 5.0 5.0
1.2 2.4 2.9 3.45 4.85 5.55 5.65 5.7 5.7

0 2.5 4.5 5.5 8.8 11.8 16.4 25.5 50.0


HPCV1 5.0 7.0 9.5 38.8 50.0
1.5 5.0 7.5 9.5 13.5 17.5 25.5 39.0 45.0

0 2.5 4.5 5.5 8.8 11.8 16.4 25.5 50.0


HPCV2 5.0 7.0 9.5 38.8 50.0
0 3.5 6.0 8.0 14.0 21.5 38.0 50.0 50.5

0 0 6.8 16 75 95.0
IPCV1 10.5 30 95
-1 0 6.5 20.5 94.5 94.5

0 0 6.8 16 75 95.0
IPCV2 10.5 30 95
-1 -1 5.5 18.0 91.0 94.5