Note: 1) EHG to be isolated at Governing Rack using levers I) SVs, CRH NRVs, Extraction NRVs opening & closing to be checked
2) Test Valves of SVs & Extraction NRVs, CRH NRV
Lever to be closed while noting down CV a) SVs – SD kept at 40%. Opening & closing of SVs to be checked
characteristics using test valves
3) Ensure no hydraulic leak test is being carried out in b) CRH NRVs – HPSO Pr. 2.4 (Closing) 2.9 (Opening)
boiler super-heat line c) Extraction NRVs – IPSO Pr. set at 3.0 ksc & NRVs to be checked for
4) Ensure no air leak test is being carried out in boiler opening & closing using test valves
reheat line
5) Ensure IP Trimming device is in ON condition
6) OPERATE S.D. WHEEL FOR CHANGE IN ASO
II) Trimming device to be operated & checked
Pr. before operating Pr. after operating
PRESSURE
IPSO Pr. 5.0 4.1
III) Control Oil Pr.: -- / 6.7 ksc Oil Temp.: -- / 54 deg.C
4.35 Design
ASO 2.3 2.52 2.68 2.75 2.79 2.91 3.06 3.12 3.25 3.52 3.78 4.01 4.2 2009
4.32
0 0 6.8 16 75 95.0
IPCV1 10.5 30 95
-1 0 6.5 20.5 94.5 94.5
0 0 6.8 16 75 95.0
IPCV2 10.5 30 95
-1 -1 5.5 18.0 91.0 94.5