OFFICE OF THE CHIEF ENGINEER
P.W.D BRIDGE CONSTRUCTION ZONE
NIRMAN BHAWAN PLOT NO. 27-28 ARERA HILLS BHOPAL
E-mail:-cepwabridge@.nic.in
Corrigendum Notice-03
NIT. No. 01/CRF / 2019-20, (Tender No. 2019_ PWDRB_66174_1
Name of Work :- Construction of Elevated Corridor Fly Over From
Damoh Naka to Ranital Chowk to Madan Mahal Chowk up to Medical
Road In the Jabalpur City of Madhya Pradesh.
Ph.2777146 Fax 2779649
Revised Key Date of NIT issued by this office vide memo No. 4069 dated
30.11.2019
: Start Date & | End Date &
S.No. Particulars reas apa Envelope
1 Purchase of Tender | 30.11.2019 | 22.01.2020
18:30 17330
2. | Online Bid Submission | 30.11.2019 | 22.01.2020
18:30 1730
CE Bridge
3. Prebid Meeting 24.12.2019 Construction
12:00 Zone 2st Floor
PWD Bhopal
Physical Submission
4. (Original EMD/Bid | 30.11.2019 | 23.01.2020 | Envelope A
Security and Technical | 18:30 17330 Envelope B
Proposal)
Mandatory Submission
5. | Mopen Envelopes)" | 24012020 Envelope A
6 eer ea 24.01.2020 Envelope B
(PQ Envelope-B) 11-00
Details of above
www.mptenders.go'
Corrigendum can be seen on website,
PWD
mginte? |
‘idge Construction Zone
Bhopal (M.P)