Project Information
System Name TERASU Solar 40MWac Solar Farm
System Size 40MWac (60MWdc)
Project Location Sitio Gugu, Sta. Rosa, Concepcion, Tarlac, Philippines
System Information PV Module Type : 179,520x - 335W Polycrystalline
Inverter Model : 2x – SG2500HV-MV
11x –SG3400HV-MV
Owner Terasu Energy Inc.

II. Findings
Through our SCADA monitoring, we noticed that even during non-
operational hours, each of our string combiner boxes still registers DC voltage. This
was true for our two, 2.5 MVA-type inverter stations. We confirmed this by taking
on-site voltage reading of our SCBs. For testing, we opened one QS main DC ACB
and read ~200V. At closed condition, we read a bus voltage of ~800V. This suggests
that the voltage present at our SCBs during desynch time is coming from the
inverter stations. We counter checked by reading the voltage at SCB level and we
were able to confirm the same results.

III. Images

Fig. 1 – condition: QS DC ACB closed (Inverter level)


Fig. 2 – condition: QS DC ACB opened (Inverter level)

Fig. 3 – condition: QS DC ACB closed (SCB level)


Fig. 4 – condition: QS DC ACB opened (SCB level)

prepared by : Korben Philson Capitulo


Electrical Maintenance Engineer