Professional Documents
Culture Documents
Lates RCP
Riser Height
Duct Riser
Type of riser Flused/Flanged
Location of Grill
Type of Grill Perforated/Louvered
Riser Insulation Y/N
Riser Coating-Powder Coated/Painted
RAL
Scope of Riser
Riser fixing with Wall/ letal Beam
Lithel Beam Position
Riser Flange Scope
Support Angle-Rod/Gripple
PEB layout
Legend Diffuser/ Grill / Nozzel Detail Check all with Dimension in Dwg & Legend
Required Cutout w.r.t Specific make
VCD Motorised/Manual
CAV
VAV
Sound Attenuator
Filed Instrument Devices
VRF / DX Placement
FA Ducting
VCD
Flexible Ducting
wg & Legend
AHU LocatiDamper Location
Coil Connection & Manifold Connection
Mounting Details
Section
Actual GA Dwg. To Incorporate
Electrical Placing
Actual GA
Space Required
Scubber HT
Ducting
Door Dimenson
Dut CollectActual GA
Pendant Details
Ht. of Pendent
Location of Pendant
Pipe Sccope & incorporating it in Dwg.
Type of Pipe
VRF/DX OdLocation
Electrical requirment
Structure required
Piping CHW/ HW Piping Size
Connection of pipe
For AHU
For Process
for CHW Cassatte
Scope Main Header / Sub Header
Supporting Bloc below itTypical Details in Tender
Check from Coordinated Layout is required space is there for laying of pipe in Main pipe Rack
Check from Coordinated pipe layout where is the space we have to take tapping from as muitipe Pipe are g